| 1 | Earth work in excavation of foundation trenches in all kinds of soil including moorum, stony earth and earth mixed with boulders except sheet rock and boulders requiring blasting including dressing of sides and leveling the bed up to the required depth and depositing the excavated materials away from the work site within initial leads and lifts, including shoring, shuttering & dewatering (if required) with cost of labour,cess, hire & running charges of water pumps sundries , T & P & all other machinaries required for the work etc.complete in all respect as per latest specification & direction of the Engineer in charge. |
| 2 | Filling F&P with sand well watered and rammed including cost, conveyance of all material and labour etc complete as per the direction of EIC |
| 3 | P.C.C. (1:3:6) to using 40 MM size hard granite matal including cost, conveyance of all material and labour etc complete as per the direction of EIC |
| 4 | P.C.C. (1:3:6) to using 40 MM size hard granite matal including cost, conveyance of all material and labour etc complete as per the direction of EIC |
| 5 | R.C.C. M20 :-Providing in position machine mixed and machine vibrated design mix cement concrete of M25 grade for reinforced cement concrete work including laying of concrete using 12 mm - 20 mm size crusher broken hard granite chips excluding the cost of centering, shuttering, and reinforcement but including admixture in recommended proportions to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer- In - Charge. including cost all materials, conveyance , royalties and taxes, loading and unloading cost of all labour,sundries, T&P etc.complete.Foundation Footing, Column Base |
| 6 | R.C.C. M20 :-Providing in position machine mixed and machine vibrated design mix cement concrete of M25 grade for reinforced cement concrete work including laying of concrete using 12 mm - 20 mm size crusher broken hard granite chips excluding the cost of centering, shuttering, and reinforcement but including admixture in recommended proportions to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer- In - Charge. including cost all materials, conveyance , royalties and taxes, loading and unloading cost of all labour,sundries, T&P etc.complete.Foundation Footing, Column Base |
| 7 | Rigid smooth centering for RCC works including false work and dismantelling them after casting including cost of materials complete in ground floor RCC foundation, Pointh band, and footing base of column |
| 8 | RCC column from PL to RL |
| 9 | Lintel Beam |
| 10 | Roof Beam |
| 11 | Brick work with CB brick (23 x 11x 8CM) masonary CM (1:6) in superstructure with splay cutting circular moulding etc including cost, conveyance of all material and labour etc complete as per the direction of EIC |
| 12 | Cuting, bending, binding of MS rod and laying in position, including cost, of binding wire, conveyance of all material and labour etc complete as per the direction of EIC |
| 13 | 12 MM thick CP with CM (1:6) over brick work, including cost, conveyance of all material and labour etc complete as per the direction of EIC |
| 14 | 16 mm thick CP with CM (1:6) over brick work, including cost, conveyance of all material and labour etc complete as per the direction of EIC |
| 15 | Mild steel doors, and windows including cost conveyance of all material etc complete as per the direction of EIC |
| 16 | Fitting, fixing of door & windows including fixture & fittings etc as per the instruction of EIC |
| 17 | Painting 2 coats over a coat of primeer including cost of paints, labour & sundries etc complete |
| 18 | Fixing floor tiles over 20 mm bed of CM (1:4) |
| 19 | Finishing walls with distemper paint of approved shade on new work 2 coat to gives an even shade including cost of paint etc complete |
| 20 | Wall painting two coats with 100 % acrylic emulsion paint (1st quality) exterior grade of approved make and shae manufactured by reputed manufacture like nerolac/Asian/Berger/Durlax or equivalent to make an even finished surface over a coat of primer with water bond cement primer in all heights with all saaffolding and stagging charges cinlduing cost, conveyance, taxes of all materials, cost of all labour T&P sundries etc as required for the work |
| 21 | Finishing wall surface of walls with acrylic wall putty (water based) of approve make |
| 22 | 6 MM thick Cement Plaster (1:4) to RCC surface finished smooth including closed deep chipping and slurry treatment |
| 23 | Provision of Electrical Work |
| 24 | Provision of handrails for disabled children |
| 25 | Display Board |
| 26 | Blackboard 8'00\\" x 4'00\\" size |
| 27 | Learning corner (3'0\\" x 5'0\\" size) |
| 28 | Moral Painting Please Enable Macros to View BoQ information |