|
| 1 | Removing dry or oil bound distemper, water proofing cement paint and the like by scraping and sand papering the wall surface smooth including necessary repairs to scratches complete including entire carriage of material with in all leads, lifts, drawings, technical specifications as per direction by Engineer-in-Charge including other incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. |
| 2 | Distempering with 1st (First) quality acrylic distemper (Ready mix) having VOC content less than 50 grams/ litre (Fifty grams per litre) of approved brand and manufacture to give an even shade Old work (one or more coats) (Asian/Nerolac/ICI Dulux) including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government |
| 3 | Painting wood work with Deluxe Multi Surface Paint of required shade with Two or more coat applied @ 0.90 ltr/10 sqm (at the rate of zero point nine zero litre per ten square metre) over an under coat of primer applied @0.75 ltr/10 sqm (at the rate of zero point seven five litre per ten square metre) (ASAIN/NEROLAC/ICI-DULUX) of approved brand and manufacture complete upto all floor level including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. |
| 4 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. one or more coat applied @ 0.90 ltr/ 10 sqm (at the rate of zero point nine zero litre per ten square metre) over an under coat of primer applied @ 0.80 ltr/ 10 sqm (at the rate of zero point eight zero litre per ten square metre) of approved brand and manufacture ( ASAIN/ NEROLAC/ ICI-DULUX ) complete upto all floor level including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. |
| 5 | Repairs to plaster of thickness 12 mm to 20 mm (Twelve millimetre to twenty millimetre) in patches of area 2.5 sq.metre (Two point five square metre) and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground with cement mortar 1:4 (One cement : four fine sand), all complete including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. |
| 6 | Providing and applying white Cement Based Putty of average thickness 1 mm ( one millimetre) of approved brand and manufacturer (J K White/ Birla White) over the plastered wall surface to prepare the surface even and smooth complete upto all floor level including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. |
| 7 | Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required 1.00 mm (One millimetre) thick with zinc coating not less than 275 gm/m² (Two hundred seventy five gram per square metre) including entire carriage of material with in all leads and lifts and as per drawings and technical specifications and the direction of Engineer-in-Charge including other incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. Please Enable Macros to View BoQ information |