Tender For Barsat - Construction Of Intermediate Pumping Station (Ips), Installation Pumping Machineries, Dg Set, Transformer, Laying Of Rising Main, Sewerage Network, Providing And Installation Of Mechanical Screen Alongwith Belt Convey And All Othe, Karnal-Haryana
TDR : 54716418
Tender Notice
BOQ
21 Days Left
Karnal
Haryana
Tender For Barsat - Construction Of Intermediate Pumping Station (Ips), Installation Pumping Machineries, Dg Set, Transformer, Laying Of Rising Main, Sewerage Network, Providing And Installation Of Mechanical Screen Alongwith Belt Convey And All Othe
Name of Work:- BARSAT - Construction of Intermediate Pumping Station (IPS), installation Pumping Machineries, DG Set, Transformer, Laying of rising main, Sewerage network, Providing and Installation of Mechanical screen alongwith Belt Convey and all other works contingent thereto.
Sl. No.
Item Description
1
Belt Conveyor: 600mm X 2700mm for Coarse Screen MOC: MSEP
2
Location-Mechanical Coarse Screen Inlet SGS/500X500-CI-FWM-M2-UFOCast Iron, Manually Operated, Wall mounted sluice gategenerally as per IS13349 standard Gate Size:500(w) X 500(h) suitable for 1m Seating and Unseating Waterhead,7.75m CL-PL Distance, Flush type bottom Closure,Rising Spindle type,Open top frame gate.
3
NS Item -Mechanical Coarse Bar Screen with differential levelsensor Suitable for Channel DimensionChannel Width: 900 mmChannel Depth: 6000 mmWater Depth : 800 mmBar Spacing : 20 mmBar Size: 10X50 mmAngle of Inclination: 75 Degree MOC :SS-304Peak Flow/screen: 7.5 MLDInclusive of 01 Nos. Relay Based Control Panel for 02 Nos. ofJMR plus 1 Nos. of ConveyorMOC: 2mm Thick CRCA Sheet..
4
operation and maintenance for 1st year after defect liability period (12 months).
5
operation and maintenance for 2nd year after defect liability period (12 months).
6
operation and maintenance for 3rd year after defect liability period (12 months).
7
operation and maintenance for 4th year after defect liability period (12 months).
8
operation and maintenance for 5th year after defect liability period (12 months).
9
operation and maintenance for complete scope of work mentioned in DNIT as per schedule iv for a period of 5 year after 12 month of defect liability period and 3 month trial run period will be charged to annual maintenance estimate complete in all respect.i) operation and maintenance during defect liability period after 3 month trial period (12 Months) ( operation and Maintenance)
10
Supplying, erection, testing and commissioning of submersible motor pumping set non clog for sewerage having head 25.00 m as per the indicated requirements of discharge in LPM andpower capacity in BHP as per IS marked including all accessories (like SS Pipes,SS Chain (Shackle Chain) ,SS Foundation Bolt, complete base frame, Monorail,Chain Guide Line, Auto Compiling, Duct Foot Bend (D/F Bend) etc. complete in allrespect Discharge Capacity (LPM) - 5210 Power Capacity (BHP) -50.
11
HSR Items Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.