| 1 | SCHEDULE 'A' PART-I (BUILDING & STRUCTURE) |
| 2 | Lump sum price worked out by the contractor for BUILDING & STRUCTURE (Construction of Guard room with watch post and toilet (Guard house, Hard standing and Sentry box elevated) RCC framed structure in permanent RCC framed structure, ATT, mosquito proofing, roof treatment, seismic measure etc complete all as specified and shown on drawing/design) as listed in Schedule ‘A’ Part-I of (Representing ___________% _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-I on Serial Page No. 22. |
| 3 | SCHEDULE 'A' PART-II (EARTH WORK AND EXCAVATION EXCLUDING BUILDING & STRUCTURE) |
| 4 | Lump sum price worked out by the contractor for EARTH WORK AND EXCAVATION as listed in Schedule ‘A’ Part-II of (Representing ________________% ________ _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-II on Serial Page No. 23 |
| 5 | SCHEDULE 'A' PART-III (INTERNAL ELECTRIFICATION) |
| 6 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION as listed in Schedule ‘A’ Part-III of (Representing ________________% ____________________ Percentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-III on Serial Page No. 24 to 27. |
| 7 | SCHEDULE 'A' PART-IV (EXTERNAL WATER SUPPLY) |
| 8 | Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY as listed in Schedule ‘A’ Part-IV of (Representing ________________% ____________________ Percentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-IV on Serial Page No. 28. |
| 9 | SCHEDULE 'A' PART-V (INTERNAL WATER SUPPLY) |
| 10 | Lump sum price worked out by the contractor for INTERNAL WATER SUPPLY as listed in Schedule ‘A’ Part-V of (Representing ________________% ______ _______________Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-V on Serial Page No. 29 to 31. |
| 11 | SCHEDULE 'A' PART-VI (EXTERNAL ELECTRIFICATION) |
| 12 | Lump sum price worked out by the contractor for EXTERNAL ELECTRIFICATION as listed in Schedule ‘A’ Part-VI of (Representing ________________% ________ _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-VI on Serial Page No. 32. |
| 13 | SCHEDULE 'A' PART-VII (MISCELLANEOUS ITEMS REQUIRED FOR B/R & E/M SERVICES (TO BE QUOTED BY CONTRACTOR) |
| 14 | S&F urinal spreader of cast copper alloy, fancy type, chromium plated, screwed at both ends for iron pipe or unions, including fixing with 15 mm dia pipe (minimum weight 60 gms), complete all as specified and as directed by the Engineer-in-Charge. |
| 15 | S&F 15 mm bib cock (long body) of chromium plated fancy type copper alloy, screwed down, high pressure, suitable for iron pipe or for unions, Complete all as specified and directed by Engineer-in-Charge. |
| 16 | S&F of stainless steel grating, round shape, dome type, 4″ to 5″ size, suitable for floor trap, complete all as specified and as directed by the Engineer-in-Charge. Please Enable Macros to View BoQ information |