| 1 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead :Of area 3 sq. metres and below (DSR - 15.12.1) |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar (DSR -15.7.4) |
| 3 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.(DSR - 15.3) |
| 4 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.(DSR - 15.56) |
| 5 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. (DSR - 15.60) |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.(DSR No. 5.22.6) |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand)(DSR-6.4.2) |
| 8 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure in Cement mortar 1:4 (1 cement :4 coarse sand) above plinth level up to floor V level.(DSR 6.13.2) |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) ( DSR - 5.2.2) |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts (DSR - 5.9.6) |
| 11 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).( DSR - 5.3 ) |
| 12 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform ( DSR - 5.9.3 ) |
| 13 | Fixing chowkhats in existing opening including embedding chowkhats in floors or walls cutting masonry for holdfasts, embedding hold fasts in cement concrete blocks of size 15 x 10 x 10 cm with cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size), painting two coats of approved wood preservative to sides of chowkhats and making good the damages to walls and floors as required complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge.Door chowkhats(DSR No.14.2.1) |
| 14 | Taking out existing wooden door shutter, repair by cutting, painting etc. and refixing of repaired door shutters to existing door frames, including replacement of hinges with screws, etc. as required, all complete as per the direction of the Engineer-in-charge(DSR No.14.85) |
| 15 | Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm. FRLS PVC insulated copper conductor single core cable etc as required.Group - C (DSR - 27.01) |
| 16 | Supplying and fixing following modular switch/ socket on the existing modular plate & switch box including connections but excluding modular plate etc. as required. 3 pin 5/6 amp socket outlet (DSR E&M 2022 1.24.4)(DSR-27.02) |
| 17 | Wiring for circuit/ submain wiring along with 2X4 Sq.mm + 1X4 Sqmm earth wire of FRLS PVC insulated copper conductor, single core cable in surface/ recessed medium class PVC conduit as required (DSR - 27.06) |
| 18 | SUPPLYING AND FIXING 5 AMPS TO 32 AMPS RATING, 240/415 VOLTS, \\"C\\" CURVE, MINIATURE CIRCUIT BREAKER SUITABLE FOR INDUCTIVE LOAD OF FOLLOWING POLES IN THE EXISTING MCB DB COMPLETE WI TH CONNECTIONS, TESTING AND COMMISSIONING ETC. AS REQUIRED. SINGLE POLE. (DSR - 27.10) |
| 19 | SUPPLYING AND FIXING 63 AMPS, DOUBLE POLE, 240 VOLTS, ISOLATOR IN THE EXISTING MC B DB COMPLETE WITH CONNECTIONS, TESTING AND COMMISSIONING ETC. AS REQUIRED.(DSR - 27.11) |
| 20 | Supplying and fixing 4 way (4 + 12), Double door, horizontal type three pole and neutral, sheet steel, MCB distribution board, 415 volts, on surface/ recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, interconnections, powder painted including earthing etc. as required. (But without MCB/RCCB/Isolator) (DSR E&M 2022 2.4.1)(DSR-27.13) |
| 21 | Supplying and fixing following size/ modules, GI box along with modular base & cover plate for modular switches in recess etc as required. for 6 Module . (125mmX75mm) (DSR - 27.19) |
| 22 | Supply and fixing of LED Tube Light batten fitting suitable for up to 1 X 22 watt LED tube light on surface complete in all respect.(NSI No. 28.41) |
| 23 | 12 mm cement plaster of mix :1:4 (1 cement: 4 coarse sand) (DSR - 13.4.2) |
| 24 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (DSR - 10.2) |
| 25 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. (DSR - 13.80) |
| 26 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture( DSR.13.62.1) Please Enable Macros to View BoQ information Special Condition :- |
| 27 | Tenderers are required to quote their offer as “above / at par / below” in the estimated cost. |
| 28 | The rates are to be filled up in figures and words both. |
| 29 | Departmental rates are exclusive of GST.GST will be borne by department as per applicable rules. Labour Cess, Royalty and all other Taxes are liable to be paid by Firm/Contractor. |
| 30 | In case of any discrepancy between the language of the items of bill of quantity and that of PWD the later shall prevail. |
| 31 | Tenders are advised to visit the site of work and make themselves acquainted with the site conditions. No claim whatsoever shall be entertained after submission of tender. |
| 32 | Quantities are approximate and may vary up to any extent on either side as per requirement of the site conditions in the direction of Engineer-In-charge or may not be executed at all for which no extra claim shall be entertained. |
| 33 | All above works shall be executed as per U.P.P.W.D/ U.P.P.T.C.L. specification or as directed by Engineer-In-charge. |
| 34 | The work may be carried in energized s/s area having high voltage installation contractor must employee trained supervisor & labour to work in such electrical/ hazardous area. All risk to men & materials shall be contractor's resposibilitiy |
| 35 | All risk to men, labour & materials shall be contractor’s responsibility. |
| 36 | All materials shall be arranged by the contractor’s at his own cost. |
| 37 | No handling charges of T&P and labour will be paid for extended period of contract, if any. |
| 38 | Rates quoted by Tenderer will remain firm till completion of scope of work of contract. |
| 39 | Contractor shall register his labour engaged in construction work in the office of Dy. Labour Commissioner ¼Hkou ,oa vU; lfUuekZ.k deZdkj ¼fu;kstu rFkk lsok ‘krZ fofu;eu½ v/khfu;e 1996. |
| 40 | Testing of material if any, required expenditure shall be borne by the contractor. Nothing shall be paid extra by the department. |
| 41 | Contractor has to made available 12 No cube at site and will frequently fill the cube at site. Accordingly cube test report will be submitted by contractor at his own cost. Final bill of work will be paid to contractor only after he will submit all satisfactory test result from authorized lab. |
| 42 | The contractor should have all related T&P like as concrete mixture, Needle & Surface vibratory, Slump test equipment & survey equipment etc. |
| 43 | Contractor has to put up all relevant drawing to SE (Civil) Prayagraj for approval at his own cost; nothing shall be paid extra for it. |
| 44 | As per G.O No. 622/23-12-2012-2. Audit/08 TC dt. 08 June 2012, Contractor has to deposit extra Security/ Performance guarantee, if the tendered rates are found below to the department rates. |
| 45 | As per section 171 of CGST Act, 2017 Any reduction in rate of tax on any supply of goods or service or the benefit of input tax credit shall be passed on the recipient by way of commensurate reduction in prices. Hence supplier/manufacturer to ensure to pass the benefit of reduced prices to UPPTCL, Further price quoted by supplier/Manufacturer is subject to scrutiny under above section” |
| 46 | Security of work will be released after six month from the date of completion of the work if no defect has been found after six month. |
| 47 | All the civil work carried out in potable water on contractor own cost. No Payment will made by department. However in case of departmental water supply 1.5% deduction will be made from contractor’s bill for water charges for the item which involve water consumption. |
| 48 | The bill Processing / Payment will be done according to existing UPPTCL Rule of ERP Portal. |
| 49 | If Tender has been cancelled after inviting due to any reason between tender call to final process, the tender cost will not refund to contractor, only EMD Will be refunded to Firm. |
| 50 | The 60% amount of brick available from dismantaling shall be recovered @ Rs. 3744.00/thousand + GST to Firm/Contractor. |
| 51 | The 30% amount of brick available from dismantaling shall be recovered as brick bats @ Rs. 1680.00/Cum + GST to Firm/Contractor. |
| 52 | The amount of Steel available from dismantaling will be recovered @ Rs. 20.00/KG + GST to Firm/Contractor. |
| 53 | Replaced CP Bib cock/piller cock/brass bib cock shall be recovered @ Rs. 25.00/each + GST to Firm/Contractor. |
| 54 | Old door and windows, shutter with chaukhat shall be recovered @ Rs. 70.00/Sqm. + GST to Firm/Contractor. SIGNATURE OF TENDERER / AUTHORISED PERSON ALONGWITH SEAL OF THE FIRM Name ……………………………..………..... Full Postal Address:………………………. ………………………………………………….. Phone No……………….. Mob. No………… |