| 1 | Uprooting rank vegetation and weeds by digging the area to a depth of 60 cm, removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water, uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts |
| 2 | Trenching in ordinary soil up to a depth of 60 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly leveling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure). |
| 3 | Supplying and stacking at site dump manure from approved source including carriage upto 1 km (manure measured in stacks will be reduced by 8% for payment) : Screened through sieve of I.S. designation 4.75 mm. |
| 4 | Spreading of sludge, dump manure or/and good earth in required thickness (cost of sludge dump manure or/and good earth to be paid separately). |
| 5 | Carrigae of manure upto 5 K.M. |
| 6 | Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge. |
| 7 | Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary, watering and finally fine dressing, leveling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 m, lift up to 1.5 m complete (cost of sludge, manure or extra earth to be paid for separately) |
| 8 | Grassing with selection No. 1 Doob grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth, if needed (the grass and good earth shall be paid for separately). |
| 9 | Supplying & Stacking of Selection No.1 doob grass turf at site fresh & free from weeds having proper roots in green including loading, unloading, carriage and all taxes paid etc.and as per direction of officer in charge. |
| 10 | Supplying and stacking of good earth at site including royalty and carriage upto 5 km lead complete (earth measured in stacks will be reduced by 20% for payment). |
| 11 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres. =(218.90*0.735*106/107) |
| 12 | SUPPLY AND INSTALLATION OF AIR WALKERSIZE: - L 100 X B 550 X H 1480MAIN FRAME 100MM OD G.I. PIPEU – 80MM OD G.I. PIPELEG MOVEMENT -40MM OD G.I. PIPEHANDLE -31MM OD G.I. PIPE |
| 13 | SUPPLY AND INSTALLATION OF AIR SWINGSIZE: - L 1100 X B 1200 X H1200MAIN FRAME -80MM OD GI PIPELEG SWING MOVEMENT – 31MM OD GI PIPEHANDLE AND FRAME -31MM AND 25MM OD GI PIPE FOOT REST –M.S. SHEET |
| 14 | SUPPLY AND INSTALLATION OF HORSE RIDERSIZE: - L 1150 X B 530 X H 1450MAIN FRAME -100MM OD G.I. PIPESTRUCTURE -31MM AND 25MM OD G.I. PIPEHANDLE -25MM OD G.I. PIPESEAT –M.S. SHEET 2.5MM |
| 15 | SUPPLY AND INSTALLATION OF DOUBLE LEG PRESSSIZE: - L 1000 X B 600 X H 1100MAIN FRAME -80MM OD G.I. PIPELEG MOVEMENT & LEG FRAME 40MM OD G.I. PIPE SEAT & FOOT REST M.S. SHEET |
| 16 | SUPPLY AND INSTALLATION OF SEATED PULLER/ DOUBLE PULL CHAIRSIZE: - L 2500 X B 800 X H 2000MAIN FRAME -100MM OD G.I. PIPEFRAME & HANDLES -40MM & 31MM OD G.I. PIPE |
| 17 | SUPPLY AND INSTALLATION OF CHEST PRESSSIZE: - L 2500 X B 800 X H 2000MAIN FRAME -100MM OD G.I. PIPEFRAME & HANDLES -40MM & 31MM OD G.I. PIPE |
| 18 | SUPPLY AND INSTALLATION OF SHOULDER WHEELSIZE: - L 1100 X W 1100 X H 1000MAIN FRAME 80MM OD GI PIPESTRUCTURE -31MM OD GI PIPERINGS -25MM AND 15MM OD GI PIPE |
| 19 | SUPPLY AND INSTALLATION OF CROSS TRAINER/ ELLIPTICAL CROSS TRAINERSIZE: - L 1200 X B 540 X H 1600MAIN FRAME -100MM OD G.I. PIPELEGS MOVEMENT -80MM OD G.I. PIPEHANDLE -40MM AND 31MM OD G.I. PIPE |
| 20 | SUPPLY AND INSTALLATION OF SKY WALKER/ CROSS WALKERSIZE: - L 850 X B 800 X H 1800MAIN FRAME -80MM OD G.I. PIPELEGS MOVEMENT -40MM OD G.I. PIPEHANDLES & LEGS -31MM & 25MM OD G.I. PIPEFOOT REST –M.S. SHEET 2MM |
| 21 | SUPPLY AND INSTALLATION OF DOUBLE TWISTERSIZE: - L 1600 X W 300 X H 1200MAIN FRAME -80MM OD G.I. PIPESTRUCTURE -31MM AND 25MM OD GI PIPEHANDLES -25MM OD GI PIPEREVOLVING DISC –M.S. SHEET |
| 22 | SUPPLY AND INSTALLATION OF SINGLE POLE ROWING MACHINESIZE: - L 1200 X B 800 X H 700MAIN FRAME -100MM OD G.I. PIPESTRUCTURE: - 80MM OD G.I. PIPEMOVEMENT: - 31MM OD G.I. PIPEHANDLE: - 25MM OD G.I. PIPE |
| 23 | SUPPLY AND INSTALLATION OF SIT UP BOARD/ ABDOMINAL EXERCISERSIZE: - L 1500 X B 1150 X H 650MAIN FRAME -100MM OD G.I. PIPESTRUCTURE -31MM AND 25MM OD G.I. PIPETOP SHEET –M.S. 2MM |
| 24 | SUPPLY AND INSTALLATION OF CYCLING INSTRUMENT/ BICYCLESIZE: - L 1100 X B 500 X H 1200MAIN FRAME -100MM OD G.I. PIPESTRUCTURE -41MM OD G.I. PIPEHANDLE -25MM OD G.I. PIPE |
| 25 | SUPPLY AND INSTALLATION OF PARALLEL BARSIZE: - L 1800 X B 600 X H 1200MAIN FRAME -80MM OD G.I. PIPESTRUCTURE -31MM AND 25MM OD G.I. PIPE |
| 26 | SUPPLY AND INSTALLATION OF HD HANGING WHEELSIZE: - L 1100 X W 1100 X H 1000MAIN FRAME 80MM OD GI PIPESTRUCTURE -31MM OD GI PIPERINGS -25MM AND 15MM OD GI PIPE |
| 27 | SUPPLY AND INSTALLATION OF POMMEL HORSESIZE 1500 MM X 600 MM X 900 MM. MAIN FRAME 80MM OD GI PIPESTRUCTURE -31MM OD GI PIPERINGS -25MM AND 15MM OD GI PIPE |
| 28 | SUPPLY AND INSTALLATION OF PULL CHAIR & PUSH CHAIR COMBINEDSIZE: - L 2500 X B 800 X H 2000MAIN FRAME -100MM OD G.I. PIPEFRAME & HANDLES -40MM & 31MM OD G.I. PIPE |
| 29 | SUPPLY AND INSTALLATION OF MULTI FUNCTIONAL TRAINER SIZE 600 MM X 800 MM X 1200 MM. MAIN FRAME 80MM OD GI PIPESTRUCTURE -31MM OD GI PIPERINGS -25MM AND 15MM OD GI PIPE |
| 30 | SUPPLY AND INSTALLATION OF LEG EXTENSIONSIZE: - L 1100 X B 500 X H 1200MAIN FRAME -100MM OD G.I. PIPESTRUCTURE -41MM OD G.I. PIPEHANDLE -25MM OD G.I. PIPE |
| 31 | SUPPLY AND INSTALLATION OF SIT AND STANDING TWISTERSIZE: - L 1600 X W 300 X H 1200MAIN FRAME -80MM OD G.I. PIPESTRUCTURE -31MM AND 25MM OD GI PIPEHANDLES -25MM OD GI PIPEREVOLVING DISC –M.S. SHEETREVOLVING SEAT –M.S. SHEET |
| 32 | SUPPLY AND INSTALLATION OF WAIST & BACK STRETCHERSIZE 894 MM X 853 MM X 1203 MMSIZE 600 MM X 800 MM X 1200 MM. MAIN FRAME 80MM OD GI PIPESTRUCTURE -31MM OD GI PIPERINGS -25MM AND 15MM OD GI PIPE. |
| 33 | SUPPLY AND INSTALLATION OF CHIN UP & DIPPING BARSIZE: - L 1500 X B 1000 X H 2100TWO PARALLEL STRUCTURE PIPE -50MM OD G.I. PIPEHAND REST –RECTANGULAR PIPE 75MM X 25MM CRC PIPESTRUCTURE -31MM AND 25MM OD G.I. PIPE |
| 34 | SUPPLY AND INSTALLATION OF SHOULDER WHEELSIZE: - L 1100 X W 1100 X H 1000MAIN FRAME 80MM OD GI PIPESTRUCTURE -31MM OD GI PIPERINGS -25MM AND 15MM OD GI PIPE |
| 35 | SUPPLY AND INSTALLATION OF LEG STRESSSIZE 600 MM X 800 MM X 1200 MM. MAIN FRAME 80MM OD GI PIPESTRUCTURE -31MM OD GI PIPERINGS -25MM AND 15MM OD GI PIPE |
| 36 | SUPPLY AND INSTALLATION OF PULL UP RACKSIZE: - L 1800 X B 600 X H 1200MAIN FRAME -80MM OD G.I. PIPESTRUCTURE -31MM AND 25MM OD G.I. PIPE |
| 37 | SUPPLY AND INSTALLATION OF SIGN BOARD RETRO REFLECTIVE SIGN BOARDS MADE OF 2 MM THICK ALUMINUM SHEET Please Enable Macros to View BoQ information |