| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil (DSR 2021 INo-2.8.1) |
| 2 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating and chemical barrier under and around the columns pits, wall trenche basement excavation top surface if plinth filling junction of wall and floor along the external per meter of binding expension joints surrounding of pipes and conduit ete. Complete (Plinth area of the building at ground floor only shall be measured as per I.S.6313(part ii 1981). Aldrine emulsificable concentrate of any other approved material such as Hepthachlor or chlordance will be used. The rate of application of chemical emulsion shall be as follows., Treatment for masonry and foundatrion 5 litres per sqm, Back fill in immediate contact with foundation 7.5 liters/sqm.,Treatment junction of soil along extemal per meter building 7.50 litre/sqm. & Treatment of soil under apron along extemal perimeter 5 Iiter/ sqm.(S.I.No- 1 New Item ) Ch- 8 |
| 3 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) (DSR 2021 I No 4.1.8) |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) (DSR 2021 Item No-6.1.2) |
| 5 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 12.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand).(DSR 2021 I.N. 6.3.1) |
| 6 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. : Cement mortar 1:4 (1 cement : 4 coarse sand) (DSR 2021 Item No-6.13.2) |
| 7 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. (DSR 2021 No-2.27) |
| 8 | Providing and fixing pressed steel door frames confirming to IS: 4351 manufactured from commercial mild steel sheet of 1.25 mm thickness including hinges jamb, lock jamb, bead and if required angle threshold of mild steel angle of section 50x25mm, or base ties of 1.25mm pressed mild steel welded or rigidly fixed together by mechanical means, adjustable lugs with split end tail to each jamb including steel butt hinges 2.5mm thick with mortar guards, lock strike-plate and shock absorbers as specified and applying a coat of approved steel primer after pre-treatment of the surface as directed by Engineer-in-charge: Profile-E (DSR 2023.I. No- 10.14.3.1) |
| 9 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works (DSR 2023, 10.25.2) |
| 10 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (DSR 2023 INo-5.1.2) |
| 11 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). (DSR 2023 Item No 5.3) |
| 12 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete (DSR 2023 Item No- 5.9.1) |
| 13 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers (DSR 2023 Item No- 5.9.5) |
| 14 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform (DSR 2023 Item No- 5.9.3) |
| 15 | S/F Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars (DSR 2023 Item No- 5.22.1) |
| 16 | S/F Steel reinforcement for R.C.C. work ready to use “cut and bend” rebars of approved make from factory/workshop to construction site including placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. (DSR 2023 Item No- 5.22C.1) |
| 17 | 12 mm thick cement plaster of mix : 1:4 (1 cement: 4 coarse sand) (DSR 2023 Item No-13.4.1 ) |
| 18 | 15 mm cement plaster on rough side of single or half brick wall of mix: 1:4 (1 cement: 4 coarse sand) (DSR 2023 Item No-13.5.1 ) |
| 19 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/sqm including pointing the joints with white cement and matching pigment etc., complete.(DSR 2023 I.No-11.38) |
| 20 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) 40 mm thick with 20 mm nominal size stone aggregate, finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. (DSR 2023 Item No-11.3.1) |
| 21 | Providing and glass strips ,joints of floor skirting dado at time of laying floors flush with floor lavel including supply of all matareial labour and T&P etc. required for proper completion of work, 5.5mm. Thick and 2.2 cm. Depth (S.I.No 631 c) |
| 22 | Providing and laying \\"Brick Coba\\" 12mm thick laid with M-150 class brick bat coba 7.50 cm thick with gap of 15 mm to each other, over 20 mm thick base of cement mortar 1:4 cement and coarse sand mixed with water proofing compound spreading cement slurry mixed with aerelic cement concrete water proofing compound filled gaps of coba & top of coba mortar mixed with water proofing compound in 1:4 cement and coarse sand mortar finished smooth & top mashed false square 30 cm. x 30 cm. and side wall parapet shall be mono tythic plaster wall upto 30 cm. higher and junction and corner shall be rounded by brick ballast cement and coarse sand masonary Coba with top finished plaster mixed with acetic water proofing compound @ 2% by weight & including S/o all material, labour T & P etc. complete for proper completion of work.(ch.11 New item 1) |
| 23 | Providing and fixing 35 mm thick factory made laminated veneer lumber door shutter conforming to IS : 14616 and TADS 15:2001 (Part B), fixing with butt hinges of required size with necessary screws, all complete as per directions of Engineer- in-charge and panelling with panels of : 12 mm thick plain grade -1, medium density flat pressed three layer particle board FPT - I or graded wood particle board FPT- I, IS : 3087 marked, bonded with BWP type synthetic resin adhesive as per IS : 848 :(DSR I.N. 9.6.1) |
| 24 | Glazed shutters: Second class teak wood including lSI marked anodised aluminium butt hinge with necessary screws.(DSR2023 I.N. 9.16.2.1) |
| 25 | Providing and applying plaster of paris putty of 2mm thick over plastered surface to prepare the surface even and smooth complete (DSR 2023, I No.13.26) |
| 26 | Finising walls with acrylics smooth exterior paint of required shade New work two more coat applied @1.67 lir./10Sqm over and including base coat of water proofing cement paint applied @2.2kg/10Sqm (DSR 2023.-13.46.1) |
| 27 | Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gram/litre, of approved manufacturer and of required shade and colour all complete to achieve even shade and colour : New work (two coats) over and including water thinnable priming coat with cement primer having VOC content less than 50 gram/litre(DSR 2023.I.No. 13.41.1). |
| 28 | Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works (DSR 2023, 13.50.3) |
| 29 | Applying priming coat: With ready mixed aluminium primer of approved brand and manufacture on resinous wood and plywood (DSR 2023, 13.50.2) |
| 30 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture (DSR 2023 Item No-13.62.1) |
| 31 | Providing and fixing fly proof galvanized M.S. wire gauge to windows and clerestory windows using wire gauge with average width of aperture 1.4 mm in both directions with wire of dia 0.63 mm all complete.With 2nd class teak wood beading 62X19 mm (DRS 2023 Item No 9.51.1) |
| 32 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption's less than 0.08% and conforming to IS : 15622 of approved make in all colours and shades, laid on 20mm thick cement mortar 1 :4(1 cement: 4 coarse sand) including grouting the joints with white cement and matching pigments etc., complete.( Size of tiles 60x60 cm.) (DSR2023 I.N.11.41.2) |
| 33 | Providing and fixing 18 mm thick gang saw cut mirror polished (premoulded and prepolished) machine cut for kitchen platforms, vanity counters window sills facias and similar locations of required size of approved shade, colour and texture laid over 20mm thick base cement mortar 1:4 with joints treated with white cement mixed with matching pigment epoxy touch ups, including rubbing, curing mounding and polishing to edge to give high gloss finish etc. complete at all levels SI No. 8.2.2.2 |
| 34 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings and fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. 15 mm nominal dia Pipes (DSR 2023 I.N. 18.8.1) |
| 35 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings and fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. 25 mm nominal dia Pipes (DSR 2023 I.N. 18.8.3) |
| 36 | Providing and Installation of R.O. System 80 LPH complete work. |
| 37 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-Charge) of total coated thickness 0.50 mm (base metal of minimum 0.45 mm thickness with total coating thickness of 0.05mm) with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /seIf tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. (DSR 2023 I.N.12.50) |
| 38 | Providing and fixing brass bib cock of approved Qty nominal bore, 15mm dia. Nominal bore (D.S.R. 2023 No.18.15.1) |
| 39 | providing and fixing brass stop cock of approved Qty 15mm dia. Nominal bore ( D.S.R.2023 No.18.16.1) |
| 40 | Supply & fixing of PVC pipe 6 kg/sq. cm. pressure10 cm dia (Kisan, Supreme or equivalent) make complete with bends with door at top and plain at bottom and gratingand including supply of necessary M.S. clamps 2.5 cm x 3 mm fixed to walls with and including supply of 15cm long 6mm dia. nails all materials, labours and T&P etc. required for proper completion of the work and including repair of plaster pointing etc. if damaged during fixing of the pipe.(S.I.No.730B) Please Enable Macros to View BoQ information |