|
| 1 | Earth work in excavation of foundation in hard soil or gravelly soil including dressing and leveling the bed and disposal of the excavated materials within initial leads and lifts as per direction of E.I.C. |
| 2 | Filling in foundation and plinth with sand watered rammed including all materials,labours etc complete. |
| 3 | Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal approved quality from approved quarry including hoisting laying using concrete mixture and vibrators including cost, carriage, royalty, cost of all labour T.&P. etc complete and as directed |
| 4 | Brick work with Fly ash Brick (23 x 11 x 8)Cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ± 2 percent in cement mortar (1:6) in Foundation and Plinth including watering curing, cost of carriage, royalty and taxes of all |
| 5 | R.C.C. work of M-25 grade with 20mm and down grade black hard granite (crusher broken) stone chips including hoisting and laying |
| 6 | Column Footing |
| 7 | Column upto plinth beam |
| 8 | Grade beam |
| 9 | Column upto Slab (Ground Fr.) |
| 10 | Lintel (Ground floor) |
| 11 | Chajja (Ground floor) |
| 12 | Roof beam (Ground floor) |
| 13 | Roof slab (Ground floor) |
| 14 | Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specifications |
| 15 | Brick work with Fly ash Brick (23 x 11 x 8)Cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ± 2 percent in cement mortar (1:6) in Super-structure and Plinth including watering curing, cost of carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C. |
| 16 | 12mm thick C.P. in C.M.(1:6) over brick masonary to the smooth surface including watering, curing, cost, carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C. |
| 17 | 16mm thick C.P. in C.M.(1:6) over brick masonary to the smooth surface including watering, curing, cost, carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C. |
| 18 | Finishing wall surface with Cement based wall putty (water based) of approved make and finished smooth & even surface to receive painting including cost of scaffolding etc. with cost of all materials, labour T&P etc. complete. |
| 19 | Dressed seasoned sal wood work framed and fixed (wrought and put up) in trusses,purlines,frames of doors,windows,ventilatours and beams etc. (Door & Window frames) |
| 20 | Providing and fixing 32 mm thick flush Door shutters conforming to IS:2002 (part I) decorative type,core of block board construction with frame of 1st class hard wood and well match teak 3 ply veneering with verical grains or cross bands and face veneers on both face of shutters inclusive of 4 Nos of stainless steel Butt Hinges (100mmx60mmx2.5mm) 40 mm stainless steel screws, cylindrical lock (Godrej-9843), TowerBo;t SS Screw,teak wood lipping arround the edge & paste with 1.5mm thick laminate on both side of the flush Door,etc including the cost of all materials,hardwae fittings , cost of all labour,conveyance,loading, unloading, T&P , etc complete as per direction of Engineer-in-charge. |
| 21 | Supplied and fitting and fixing of Unplasticised Polyvinyl Chloride (UPVC) (FENESTA,/NCL VEKA LTD) . Three track -three panel sliding window -60- Series duly manufactured using UPVC reinforced profiles of 108 mm x 45mm x 2.5 mm for outer frames and window sash of 39 mm x 58 mm x 2.5 mm capable of muntingg single glazing system, structurally reinforcd with hot dip galvanised upto 50 mocrons of minimum thickness of 1.50 mm prefabricated & welded through fusion welding the window frame shall be fitted with 6mm thick clear tougherned glass of SAINT -GOBAIN make duly fixed with EPDM weathering seal resistant and the system is to be installed using Reinforced large Coupler at the site using anchor fasteners, sillicon rubber sealant, easy glazing/ deglazing at site etc., incluiding cost & conveyance of all materials, accessories, labour charges, materials and product conforming to ASTM D- 638-14, EN-477-95 and others applicable codes and standreds. |
| 22 | Supplying of M.S. Door, Window with grills, Grills, collapsible gates made out of M.S. Angle frame, M.S. Flat, Sheet etc of approved section & design, electrically welded properly with all necessary locking arrengement, and 1 coat red oxide primer includ |
| 23 | Fixing of vetrified tiles Plain/Ivory in floors treads or steeps and landing on 25 mm thick bed of cement mortar (1:4) (1 cement :1 course sand) and filling joints with pigment to match the shades of granite including rubbing and polishing complete as pe |
| 24 | Fixing Vetrified tile Plain/Ivory in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including cost, carriage, cost of all labour etc. complete. |
| 25 | Priming 1 coat with wall primer water bond cement primer including all labour, materials, T&P etc. complete. (Ceilling) |
| 26 | Wall painting 2 coats with plastic emulsion paint of approved shade on new work to give an even shade including cost of paint etc complete. |
| 27 | Painting 2 coats with one coat Primer any approved paint in iron works including sand papering, polishing surfaces, cost of paints, cost of all labour, T&P, etc complete in all floors as per direction of E.I.C. |
| 28 | Finishing to the exposed surfaces of wall with weather coat of any approved shade on new work 2 coats to give an even shade including cost of weather coat all cost of all labours and T&P etc. complete . |
| 29 | Supplying, fitting and fixing of P.V.C. rainwater down pipe 4” with necessary shoes and bends including cost, conveyance and taxes of all materials, labour, T&P etc. complete. Please Enable Macros to View BoQ information |