| 1 | DAILY OPERATION/MONITORING/MAINTAINING OF EFFLUENT TREATMENT PLANT, PERIODIC TESTING OF POLLUTION PARAMETERS AS PER KSPCBREQUIREMENTS AT KAMCO, ATHANI |
| 2 | ETP OPERATIONMonitoring and maintaining ofeffluent water quality at the required levelCollection of effluent water sample, analysisand submitting Certificate of Analysis in triplicate with following parameters: 1.pH (Tolerance Limit:6 to 9) using PH Meter2.Total Suspended Solids(TL:100 mg/L) 3.Total Dissolved Solids4.BOD(3 days at 27 deg.C,TL:30mg/L) 5.Oil & Grease(TL:10 mg/L) 6.Chemical Oxygen Demand 7.Sulphide8.Total Kjeldhal Nitrogen 9.Ammoniacal Nitrogen |
| 3 | Periodic testing of Stack Emission: Analysis of Stack Emission at 3 Locations:KMB Painting Booth, Engine Painting Booth, DG Set and submitting of Certificate of Analysis with following paramaeters:1. Temperature2. Rate of Emission: Volume & Velocity 3.Particulate Matter(TL: 250mg/N CM) 4.Sulphur Dioxide |
| 4 | Periodic Testing of Ambient Air: Analysis Ambient air at 4 Locations: Near DG Room,Near Front Gate, Near Tiller Despatch Area& Near West Side compound wall and submitting of Certificate of analysis with the following 4 parameters( TL: 200 mg/CM)1. SPM 2.RPM3. Sulphur Dioxide4. NOX |
| 5 | Sound Level Monitoring: Measuring of sound Level at 4 locations: Near DG room, Near front gate, Near Tiller dispatch area & Near west side compound wall and submitting report ( TL: Shall not exceed thestandard applicable for the adjoining area) |
| 6 | Ground water Analysis (10 Parameters)- 4 locationsParameter to be tested:1. Colour,2. Odour3. Turbidity4. pH5. Total Dissolved Solvents6. Total Hardness(as CaCO3)7. Calcium (as Ca)8. Magnesium(as Mg)9. Chloride(as Cl)10. Iron(as Fe) |
| 7 | Soil Analysis – 6 Parameters1. pH Value using PH Meter2. Alkalinity3. Phosphate4. Chloride5. Zinc6. Iron |
| 8 | DAILY OPERATION/MONITORING/MAINTAINING OF EFFLUENT TREATMENT PLANT, PERIODIC TESTING OF POLLUTION PARAMETERS AS PER KSPCBREQUIREMENTS AT KAMCO, PALAKKAD |
| 9 | ETP OPERATIONMonitoring and maintaining of effluent water quality at the required levelCollection of effluent water sample, analysis and submitting Certificate of Analysis in triplicate with following parameters:1.pH (Tolerance Limit:6 to 9)2.Total Suspended Solids(TL:100 mg/L)3.BOD(3 days at 27 deg.C,TL:30mg/L)4.Oil & Grease(TL:10 mg/L) |
| 10 | Periodic testing of Stack Emission: Analysis of Stack Emission at 3 Locations:KMB Painting Booth, Engine Painting Booth, DG Set and submitting of Certificate of Analysis with following paramaeters:1.Temperature2.Rate of Emission: Volume & Velocity3.Particulate Matter(TL: 250mg/N CM) 4, Sulphur Di Oxide |
| 11 | Periodic Testing of Ambient Air: Analysis Ambient air at 4 Locatiions: Near DG Room, Near Front Gate, Near Tiller Despatch Area & Near West Side compound wall and submitting of Certificate of analysis with the following 4 parameters( TL: 200 mg/CM)1. SPM2.RPM3.Sulphur Dioxide4.NOX |
| 12 | Sound Level Monitoring: Measuring of sound Level at 4 locations: Near DG room, Near front gate, Near Tiller dispatch area & Near west side compound wall and submitting report ( TL: Shall not exceed the standard applicable for the adjoining area) |
| 13 | DAILY OPERATION/MONITORING/MAINTAINING OF EFFLUENT TREATMENT PLANT, PERIODIC TESTING OF POLLUTION PARAMETERS AS PER KSPCBREQUIREMENTS AT KAMCO, MALA |
| 14 | ETP OPERATIONMonitoring and maintaining ofeffluent water quality at the required levelCollection of effluent water sample, analysis and submitting Certificate of Analysis in triplicate with following parameters:1. pH (Tolerance Limit:6 to 9)2. Total Suspended Solids(TL:100 mg/L) 3.BOD(3 days at 27 deg.C,TL:30mg/L) 4.Oil & Grease(TL:10 mg/L)5.Chemical Oxygen Demand 6.Zinc as Zn7.Iron as Fe |
| 15 | Periodic testing of Stack Emission: Analysis of Stack Emission at 5 Locations: 1.Painting Booth 1 (Stack 1)2. Painting Booth 1 (Stack 2)3. Painting Booth 2 (Stack 1)4. Painting Booth 2 (Stack 2)5. 320 KVA DG Setsubmitting of Certificate of Analysis with following Paramaeters:1. Temperature2. Rate of Emission: Volume & Velocity 3.Particulate Matter(TL: 250mg/N CM) 4.Sulphur Dioxide |
| 16 | Periodic Testing of Ambient Air: Analysis Ambient air at 3 Locations:. Near Main Gate. Near Compressor Room. Near store Roomsubmitting of Certificate of analysis with the following 4 parameters( TL: 200 mg/CM)1. SPM2. RPM3. Sulphur Dioxide4. NOX |
| 17 | Sound Level Monitoring: Measuring of sound Level at 2 locations:3. 320 KVA DG set4. 1m away from boundary (Near Main Gate)submitting report ( TL: Shall not exceed the standard applicable for the adjoining area) |
| 18 | DAILY OPERATION/MONITORING/MAINTAINING OF EFFLUENT TREATMENT PLANT, PERIODIC TESTING OF POLLUTION PARAMETERS AS PER KSPCBREQUIREMENTS AT KAMCO, KALAMASHERI |
| 19 | ETP OPERATIONMonitoring and maintaining ofeffluent water quality at the required levelCollection of effluent water sample, analysis and submitting Certificate of Analysis in triplicate with following parameters:1. pH (Tolerance Limit:6 to 9)2. Total Suspended Solids(TL:100 mg/L) 3.BOD(3 days at 27 deg.C,TL:30mg/L) 4.Oil & Grease(TL:10 mg/L)5.Chemical Oxygen Demand 6.Zinc as Zn7.Iron as Fe |
| 20 | Periodic testing of Stack Emission: Analysis of Stack Emission at 2 Locations:1. 125 KVA DG set2. Paint Boothsubmitting of Certificate of Analysis with following Paramaeters:1. Temperature of Emission2. Velocity of Emission3. Volume of gas discharged 3.Particulate Matter(TL: 250mg/N CM) |
| 21 | Periodic Testing of Ambient Air: Analysis Ambient air at 2 Locatiions:1. Near Main Gate2. Near Tiller Paint booth submitting of Certificate of analysis with the following 4 parameters( TL: 200 mg/CM)1. SPM2. RPM3. Sulphur Dioxide4. NO2 |
| 22 | Sound Level Monitoring: Measuring of sound Level at 2 locations:1. 125 KVA DG set2. Near front gatesubmitting report ( TL: Shall not exceed the standard applicable for the adjoiningarea) Please Enable Macros to View BoQ information |