| 1 | PART-A (Bldg.) |
| 2 | 12.3.2/B-12Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finished: (A) 20mm thick |
| 3 | 14.2.1Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. 1: 3: 6 or richer mix. |
| 4 | 14.7.3Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar |
| 5 | 14.3Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. |
| 6 | 4.13.2 Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) Hot rolled deformed bars (IS : 1139). |
| 7 | 5.2.2/B-5Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in : cement mortar 1:6 (1- cement: 6- coarse sand). |
| 8 | 10.22/B-10Providing Gola 75mmX75mm in cement conc. 1:2: 4 (1 cement : 2 coarse sand : 4 stone aggregate 10mm and down gauge) i/c finishing with cement mortar 1:3 (1 cement : 3 fine sand as per standard design. |
| 9 | 3.8/B-3P/F precast cement concrete coping 1:2:4 mix 50 mm thick complete as per specifications: |
| 10 | 12.22.1 Providing and applying white cement based putty over plastered surface to prepare the surface even and smooth complete.(A) New plastered surface (three or more coats) |
| 11 | 12.37.1 /B-12Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade including all scaffolding: (A) New work (two or more coats) over and i/c scrapping and priming coat with cement primer. |
| 12 | 12.42/B-12Finishing walls with Acrylic Smooth exterior paint of required shade including all scaffolding New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm ). |
| 13 | 12.46.1Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: (A) Two or more coats on new work. |
| 14 | 4.9Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. |
| 15 | 4.10.1Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :(A) Walls (any thickness) including attached pilasters, buttresses plinth and string course. |
| 16 | (B) Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajjas, lintel, beam, plinth beam etc. (4.10.2) |
| 17 | (C) Columns, pillars, posts and struts etc. (4.10.3) |
| 18 | 15.28.1Nano technology water proofing, thermal insulation protection coating : Nano technology water proofing, thermal insulation protection coating 12 layer process for increasing life of building and damage control for roof.-- before coating scaling, cleaning, and preparing surface for treatment. Opening all joint and cracks and filling them with nano technology crack filling hydrophobic chemical with 2/3 coats. then after drying doing a PCC coat on cracks. One coat of nano technology hydrophobic/oiliophobic primer. Nano technology water proofing treatment in3 coats non silicon based applied with fiber mesh sheets in medium. Nano technology thermal insulation coating highly elasticity in nature with 3 coats with 1000 micron width.2top coats of anti stain, anti slippery, natural transparent high shine chemical for better life of the treatment. |
| 19 | 13.29Repair to damaged RCC slabs, beams and columns etc for strengtheing with cement mortar 1 : 2 in following stepsi) Choping losse and cracked concrete to required depth, cleaning the exposed surface of steel and concrete with wire brush and sand papering , cleaning of concrete surface with water as necessary and getting dried.ii) Applying Epoxy primer on the exposed steel bars.iii) Applying Epoxy hardener and resin mix (as per manufectured's specification) on concrete and steel bars with brush.iv)Speading dry cement mortar 1 : 2 mix over epoxy treated wet surface and allow it to dry for one day.v) Plastering the surface with cement sand mortar 1 : 3 upto depth of 30mm complete.vi) Cure the plastered surface for 15 days All work including scaffolding etc. complete in all respect. |
| 20 | PART- B (Item Rate Basis) |
| 21 | Disposal of rubbish un-wanted material dismanted material, away from site at appropirate place including all lead and lift, loading unloading, transportation labour etc. As per direction of Engineer in charges. |
| 22 | Dismantling and dismembering of Nelco OLD tower of height approx upto 30 mtr. using gas cutter all T&P crane, all machinery, necessary scaffolding for protection of existing structure i/c cost of labour, T&P complete following all safety precautions and depositing it to ACOS campus i/c transportation, loading, unloading complete as per direction of Engineer in charge Please Enable Macros to View BoQ information |