| 1 | M&L for preventive and comprehensive maintenance as per Original Equipment Manufacturer's (OEMs) reccommendations through the OEM of M/S Blue Star or authorized service dealer of M/S Blue Star (As per MOU) of floor mounted Package type air cooled AC plant of capacity 3x18 TR by cleaning of airfilters, condensor cleaning with coil cleaner,cleaning of all dampers for optimum cooling in every room, duct inspection and cleaning from inside, checking and rectification of control wiring, greasing of blower motor, checking of all safety measures,topping of required refrigerant gas and compressor oil it retained as required, balancing of blower etc and including repair/replacement of unserviceable spare parts as and when required i.e compressor of the package unit, micro processor control unit, indoor blower motor, outdoor fan motor, fan motor blade, condensor coils, airfilters, dampers, liquid line gas filter, charging valve, contractors, blower motor bearing, required size V-belts, leak test by nitrogengas andcharging the refrigerantas required at site including test run for 24 hrs to achieve satisfactoryservice and designed condition test results in presence of Engineer-in-Charge, complete all as specified and directed.[Package type air cooled AC plant of capacity 3x18 TR Model – DPA216R3-I (Make:Bluestar) installed in NGCCM ]. |
| 2 | M&L for Preventive and comprehensive maintenance as per Original Equipment Manufacturer's(OEMs) reccommendations through the OEM of M/S Blue Star or authorized service dealer of M/S Blue Star (As per MOU) of central AC chiller plant of capacity 3x100 TR, water cooled screw chiller type by checking the functioning of Chiller unit/Air Handling unit/Pumps /Cooling tower/Controls and all such equipment covered installed, Descaling of condensers/ chemical cleaning of evaporator coils/replacement of pre filters based as per requirement, descaling of cooling tower and replenishing as required refrigerant gas and compressor oil in the system as per requirement respectively, servicing/replacing and descaling of chiller plant any type of spare parts of chiller unit as and when required i.e compressors, thermostat, cut outs, micro processor unit control modules of the plant, control boards, pressure transducer, sensors, capacity transducer, phase protector, timer, chillers/condensing unit water cooled screw chiller compressors, evaporators, expansion valves, water cooled condensers, oil cooler, oil pipings, oil filters, refrigerant pipings, refrigerant filters, solenoid and automatic control valves, cooling tower nozzle, condensor water pump with motors, electrical control wiring and including coil changing, cleaning of AHU drain, AHU V belts, replacement of hessian cloth with chain,heat varnishing, baking,connecting plates,checking of all electrical connections (removing of carbon deposits if any), pre-filter and micro filrter cleaning,greasing of all bearings etc.,complete with the following all as specified and directed.[Water cooled screw chiller type Model – LCWX1-0345D – 3x100 TR (Make:Bluestar) installed in WSA]. |
| 3 | M&L for Preventive and comprehensive maintenance as per Original Equipment Manufacturer's(OEMs) reccommendations through the OEM of M/S Blue Star or authorized service dealer of M/S Blue Star (As per MOU) of Air cooled scroll chiller Plant of capacity 3x80 TR with multiple hermatic scroll compressors type by checking the functioning of Chiller unit/Air Handling unit/Pumps /Cooling tower/Controls and all such equipment covered installed, Descaling of condensers/ chemical cleaning of evaporator coils/replacement of pre filters based as per requirement, descaling of cooling tower and replenishing as required refrigerant gas and compressor oil in the system as per requirement respectively, servicing/replacingand descaling of chiller plant any type of spare parts of chiller unit as and when required i.e compressors, thermostat, cut outs, micro processor unit control modules of the plant, control boards, pressure transducer, sensors, capacity transducer, phase protector, timer, chillers/condensing unit water cooled screw chiller compressors, evaporators, expansion valves, water cooled condensers, oil cooler, oil pipings, oil filters, refrigerant pipings, refrigerant filters, solenoid and automatic control valves, cooling tower nozzle, condensor water pump with motors, electrical control wiring and including coil changing, cleaning of AHU drain, AHU V belts, replacement of hessian cloth with chain,heat varnishing, baking,connecting plates,checking of all electrical connections (removing of carbon deposits if any), pre-filter and micro filrter cleaning,greasing of all bearings etc.,complete with the following all as specified and directed. [Air cooled scroll chillers Model – XAC2YS-080A – 3 x 80 TR (Make:Bluestar) installed in DARIN-III]. |
| 4 | M&L for Preventive and comprehensive maintenance as per Original Equipment Manufacturer's(OEMs) reccommendations through the OEM of M/S Blue Star or authorized service dealer of M/S Blue Star (As per MOU) of central AC chiller plant of capacity 3x26 TR, water cooled screw chiller type by checking the functioning of Chiller unit/Air Handling unit/Pumps /Cooling tower/Controls and all such equipment covered installed, Descaling of condensers/ chemical cleaning of evaporator coils/replacement of pre filters based as per requirement, descaling of cooling tower and replenishing as required refrigerant gas and compressor oil in the system as per requirement respectively, servicing/replacingand descaling of chiller plant any type of spare parts of chiller unit as and when required i.e compressors, thermostat, cut outs, micro processor unit control modules of the plant, control boards, pressure transducer, sensors, capacity transducer, phase protector, timer, chillers/condensing unit water cooled screw chiller compressors, evaporators, expansion valves, water cooled condensers, oil cooler, oil pipings, oil filters, refrigerant pipings, refrigerant filters, solenoid and automatic control valves, cooling tower nozzle, condensor water pump with motors, electrical control wiring and including coil changing, cleaning of AHU drain, AHU V belts, replacement of hessian cloth with chain,heat varnishing, baking,connecting plates,checking of all electrical connections (removing of carbon deposits if any), pre-filter and micro filrter cleaning,greasing of all bearings etc.,complete with the following all as specified and directed.[Water cooled screw chiller type Model – XWCS2026AR2 – 3x26 TR (Make:Bluestar) installed in OT AT 12 AFH ]. |
| 5 | Note applicable for item No 01 to 04(i) All equipment under contract will be serviced during the contract period as per standard checklists.(ii) All breakdown calls will be attended to during the contract period.(iii) Cost of spare parts/consumables required shall be borne as per type of contract and shall be applicable to allactivities specified under Section II of this annexure (subject to standard exclusions).(iv) Risk Protection Contract (RPC): Cost of necessary spare parts and consumables to be borne by BSL.(v)The compressor will be checked for its proper functioning and if any defect is found, the same will be repaired/replaced.(vi) Safety controls such as pressure cut-outs will be tested for proper functioning and in case of any malfunction, they will be either repaired or replaced accordingly.(vii) Air filters will be inspected and cleaned or replaced, if necessary. Cost of filters will be borne by the customer.(viii). Cooling coil will be inspected and cleaned, if necessary. |
| 6 | (ix) The blower motor will be checked and any defects noticed will be attended to.(x) The driver set of the blower section will be inspected, belt tension adjusted, and belts changed, if necessary.(xi). Any defect in the electrical items and control wiring will be attended to.(xii) Refrigerant gas will be topped up in the system as and when necessary.(xiii). Activities applicable to Water Cooled Units: (a). Condenser water pumps with motors will be checked for satisfactory functioning. Any repairs to them, if necessary, will be carried out by us.(b). Cooling tower nozzles will be inspected and attended to for proper spray and replaced, if necessary.(c). We will carry out cleaning of the cooling tower sump once a year. (xiv) Comprehensive maintenance is to be carried out by OEM i.e. M/s Blue Star or authorized service dealer of M/S Blue Star only. The contractor shall be required to submit a MOU with OEM for the same and it will be an essential requirement in Technical Evaluation stage. The tenderer shall required to upload MOU with OEM otherwise bids shall not be qualify for opening of finance bid. (xv). Activities applicable to Air Cooled Units:(a). The condenser fan motor will be attended.(b). The condenser coil will be inspected and cleaned.(c) Any repairs in the condenser coil will be attended.(d) Repairs to refrigerant piping due to system problems will be attended . |
| 7 | Dismantling/ taking out and opening the complete monoblock pump set of 3 HP, 5 HP & 7.5 HP capacities in AC plant, repair and replacement of unserviceable parts such as bearing set, glan dori, bush, coupling, Impeller after complete repair and reinstallation at existing location including testing complete all as specified and directed.Note : (i) Spare parts reqd for replacement will be paid separately under relevant items.(ii) Stud,nuts,bolts, Washer and welding as required is included under this item. |
| 8 | Supply only ball bearing suitable for 3HP/ 5 HP/ 7.5 HP capacity motor as per existing complete all as specified and as directed. |
| 9 | Repair of cover housing including repair to main shaft for various capacities as per existing complete all as specified and as directed. |
| 10 | Supply only gun metal bush of pump suitable for 3 HP / 5 HP/ 7.5 HP motor as per existing complete all as specified and as directed. |
| 11 | Supply only pump Impeller suitable for 3 HP / 5 HP/ 7.5 HP motor as per existing complete all as specified and as directed. |
| 12 | Dismantling of defective PCB of AC plant of any make from 10 to 25 TR unit and transporting to workshop for necessary repair transporting back to site and refixing to existing location for proper functioning of the unit complete all as specified and as directed. |
| 13 | Dismantling of defective PCB of AC plant of any make from 30 to 50 TR unit and transporting to workshop for necessary repair transporting back to site and refixing to existing location for proper functioning of the unit complete all as specified and as directed. |
| 14 | Dismantling of defective PCB of AC plant of any make above 50 TR unit and transporting to workshop for necessary repair transporting back to site and refixing to existing location for proper functioning of the unit complete all as specified and as directed. |
| 15 | Dismantling and taking out unserviceable motor of any component of AC plant capacity 3 HP/5 HP/7.5 HP and transporting to contractor workshop for cutting the wornout winding, cleaning the slots and rewinding the same in copper wire of suitable gauge including taping, varnishing, insulating, re-assembling and reinstallation at existing location and testing on full load for satisfactory performance complete all as specified and as directed. |
| 16 | Dismantling and taking out unserviceable motor of any component of AC plant capacity 12.5 HP/15 HP and above and transporting to contractor workshop for cutting the wornout winding, cleaning the slots and rewinding the same in copper wire of suitable gauge including taping, varnishing, insulating, re-assembling and reinstallation at existing location and testing on full load for satisfactory performance complete all as specified and as directed. |
| 17 | M&L for taking down unserviceable duct of GI sheet and Supply,assembly and erection of GI sheet with TDF flangerectangular/ square duct made out of 'L' shaped hollow profile,duly factory boxed , incl all accessories such as Corner, Cleat,Carriage bolt, Gasket and appropriate sealant on longitudinal joints etc complete of size 22 Gauge complete all as specified and as directed. |
| 18 | M&L for taking down unserviceable glass wool, false ceiling board and supply and fixing of nitirle insulation thickness 25 mm, after complete the work false ceiling fixed as per existing all as per specified and including the following :- (a) Cleaning the duct surface (to be insulated) by scrapping carefully with wire brush etc, all duct joints are sealed against any leakage, applying rubbed based adhesive CPRX compound, sealing of all joints and circular overlaps with cloth including use of hard chemical adhesive.(b) Tightening nuts & bolts, joints to rectify the duct sag to duct insulated. |
| 19 | Supply only Expansion Valve for chiller unit of central AC plant complete all as specified and as directed. |
| 20 | S&F in replacement of water flow switch for Condenser/Chiller pipeline with contol wiring complete all as specified and as directed. |
| 21 | S&F in replacement of V belt for AHU motor as per existing size of central AC plants complete all as specified and as directed. |
| 22 | M&L for carrying out pressure leak test by nitrogen gas in Central/Package type AC Plant different capacity of TR compressor including connected condenser unit, chiller unit & connected pipes of the system of AC plant for leak proof including taking out nitrogen gas (residual) after leak repair and testing complete all as specified and as directed.Note:- T&P including nitrogen gas shall be arranged by the contractor under his own arrangement. |
| 23 | Maintenance of AC plant of 09 TR/25TR/26TR/40 TR capacity each with connected accessories such as compressor, Humidity control, Air handling unit, cooling tower, pump etc complete as directed by Engineer-in-Charge inclusive of cost of any minor spares such as gland, nut, bolt, washers, gasket etc complete all as specified and as directed. |
| 24 | M&L for servicing of Main Electric Panel board/Control panel board of Central/Package type AC Plant by cleaning the panel with blower, replacement of Unsv burnt wire, cables with existing size & length including proper numbering, replacement of u/s fuse link, lugs, washer, nuts, bolts, checking proper electrical connection, connectivity, cleaning of contactors by contact cleaner etcand find out defective parts and making the panel functional by replacing the unserviceaable item inclusive of mior item like thimbles, tags, nut, bolts, washers, wire pieces etc complete all as specified and as directed.Note:-Defective parts shall be measured and paid seperately under respective item. |
| 25 | Supply only MCB 6-32 Amp, SP, 'C' series complete all as specified and as directed. |
| 26 | Supply only MCB TPN 40 to 63Amp , 'C' series complete all as specified and as directed. |
| 27 | Supply only MCB TPN 10 to 32 Amp , 'C' series complete all as specified and as directed. |
| 28 | Supply only Add on Auxiliary contact block (MNX A-2 /MNX A-1/TA1-DN22/LAN-11) complete all as specified and as directed. |
| 29 | Supply only Voltage selector switch complete all as specified and as directed. |
| 30 | Supply only HRC fuse link RH type having breaking capacity 80 KA ( 2-32 Amps) complete all as specified and as directed. |
| 31 | Supply only Fuse bases for HRC fuse upto 32 Amp complete all as specified and as directed. |
| 32 | Supply only Contactor 3 phase having current rating 9 to 12 A complete all as specified and as directed. |
| 33 | Supply only Contactor 3 phase having current rating 18 to 22 A complete all as specified and as directed. |
| 34 | Supply only Contactor 3 phase having current rating 25 to 32A complete all as specified and as directed. |
| 35 | Supply only Thermal Over Load Relay (Auto/Manual reset) suitable for contractor (Relay range 2.5 to 13 Amps ) complete all as specified and as directed. |
| 36 | Supply only Thermal Over Load Relay (Auto/Manual reset) suitable for contractors (Relay range 23 to 40 Amps) complete all as specified and as directed. |
| 37 | Supply only PVC connector 15 to 60 Amps complete all as specified and as directed. |
| 38 | Supply only Single phase preventer suitable for 3 HP to 25 HP Elect motor sets complete all as specified and as directed. |
| 39 | Supply only RYB Phase/On/Trip indicating lamps (as per colour code) complete all as specified and as directed. |
| 40 | Supply only thermostat expansion valve suitable for capacity up to 90 TR complete all as specified and as directed.. |
| 41 | Supply only strainer drier 5/8\\"complete all as specified and as directed. |
| 42 | Supply only LP/HP cut out complete all as specified and as directed.Make:- Indfoss/Ranco as approved. |
| 43 | Supply only main thermostate Temperature range 50-300 Degree C, 15A, 230-250 V, ACcomplete all as specified and as directed. |
| 44 | Supply only canvas cloth on duct with provision of zips at out side of package unit complete all as specified and as directed. |
| 45 | Supply only fins for cooling tower as per ground data sample complete all as specified and as directed. |
| 46 | Supply only copper tubing 12.5 mm dia for 09 Tonne capacity complete all as specified and as directed. |
| 47 | Supply only microbased sensors of LWT /EWT as per sample complete all as specified and as directed. |
| 48 | S&F in replacement of V belts ISI marked of compressor and AHU as per existing size and type complete all as specified and as directed. |
| 49 | S&F of Micro drive 15 Kw/20 HP Integrated Brake Chopper-Built-in brake chopper as an option,Three Phase,Standards IOs-6DI, 2DO out of 6DI, 2AI, 1AO, 2RO,Built In Harmonic Filter-Dual DC link inductor,Built In RFI Filter-Class A2 ,A1 and A3 , programing and testing of Micro Drive model No. 132F0059 Danfoss FC051P15KT4E20H3BXCXXXSX complete all as specified and as directed. |
| 50 | Descaling of shell & tube type condenser by opening of condenser Unit cover from both ends followed by un screwing of existing water supply line (Inlet/Out let) of any size including reconnecting properly by puttying necessary gasket after decaling is complete all as specified and directed for the following condenser including evapovrating coils, housing , cleaning of air filter with chemical etc through OEM of following condensor :- |
| 51 | Condenser Unit 25 TR at MLH (Medium lift helicopter) Lab |
| 52 | Condenser Unit 15 TR chiller simulator |
| 53 | Condenser Unit 10 TR AT SES AC PLANT |
| 54 | Condenser Unit 39 TR AT SHAMSHER AC PLANT |
| 55 | Cleaning and de scaling of existing water supply line from FRP to cooling tower including fins of FRP of any size by un screwing , running ,joints to valves by pouring and flowing decaling liquid. The process will continue till scales are removed including reconnection , running joints and valves etc for following sizes of FRP through OEM :- |
| 56 | 25 TR capacity – MLH (Medium lift helicopter) Lab AC plant |
| 57 | 15 TR capacity at Simulator chiller A/c plant |
| 58 | 10 TR capacity – SES |
| 59 | 39 TR capacity – at Shamsher Auditorium |
| 60 | Supply and charging of R -407 gas complete all as specified and as directed. |
| 61 | Supply and charging of R-134a gas complete all as specified and as directed. |
| 62 | Supply and charging of compressor oil N-68 complete all as specified and as directed. |
| 63 | S&F Solenoid valve , 230 volt, 3 way pilot control type suitable for Chiller & AHU unit for Central AC Plant of capacity 25 TR complete all as specified and as directed. |
| 64 | M&L for servicing, cleaning & greasing of AHU with complete accessories such as cooling coil, air filters, greasing of blower motor, blower/drum, blower shaft, checking of electric control cable connections & cleaning of Pot Strainer/Y strainer of chillier/condenser line including replacement of strainer (jali) if required etc complete all as specified and as directed. Note : Cooling coils shall be cleaned with jet spray of suitable pressure. |
| 65 | S&F Mini Hepa filter 1220x610x70 mm complete all as specified and as directed. |
| 66 | S&F Mini Hepa filter 1220x270x70 mm complete all as specified and as directed. |
| 67 | S&F Mini Hepa filter 610x305x70 mm complete all as specified and as directed. |
| 68 | S&F air filter of size 600mm X 600 mm as per sample complete all as specified and as directed. |
| 69 | S&F glass wool for package type unit complete all as specified and as directed. |
| 70 | S&F Pre Filter 10 micron of 600mmX 600 mm as per sample complete all as specified and as directed. |
| 71 | S&F Pre Filter 10 micron of 600mmX 300 mm as per sample complete all as specified and as directed. |
| 72 | M&L for painting of complete AC plant(Compresser,condenser ,Water pipe line , Cooling tower and all piping) with two coat of synthetic enamel paint(Blue colour) including preperation of surfaces complete all as specified and as directed. |
| 73 | M&L for rewinding of Condenser Fan motor,1HP with superior quality of super enameled copper wire of matching size as per original data including varnishing, insulating complete all as specified and as directed. |
| 74 | S & F and programing and testing of Control card PCV of 65 TR Chiller AC Plant Chiller Carel Controller WSA AC Plant of Make : Blue Star complete all as specified and as directed. |
| 75 | S&F and Testing of Compressors for Darin-III AC Plant as per existing TR Model No- SY300A4MBB , DANFOSS complete all as specified and as directed . |
| 76 | S & F in replacement MCCB 250 Amps , 4 pole, 415 volts , 50 Hz , 25 KA breaking capacity with adjustable thermal magnetic release, with spreader links on both sides with existing size and make as suitable to fit in the existing LT FPB complete all as specified and as directed |
| 77 | S & F in replacement MCCB 200 Amps , 4 pole, 415 volts , 50 Hz , 25 KA breaking capacity with adjustable thermal magnetic release, with spreader links on both sides with existing size and make as suitable to fit in the existing LT FPB complete all as specified and as directed |
| 78 | S & F in replacement MCCB 160 Amps , 4 pole, 415 volts , 50 Hz , 25 KA breaking capacity with adjustable thermal magnetic release, with spreader links on both sides with existing size and make as suitable to fit in the existing LT FPB complete all as specified and as directed Please Enable Macros to View BoQ information |