| 1 | Earth work in excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.All kinds of soil |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) includinggetting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, asdirected by Engineer-in-charge.All kinds of soil |
| 3 | Dry stone pitching (any thickness) excluding cost of stones.On Horizontal |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) including manufactured sand derived from Recycled Concrete Aggregate (RCA) upto 25% : 4 graded stone aggregate20 mm nominal size including Recycled Concrete Aggregate (RCA) upto 25%) |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 manufactured sand derived from Recycled Concrete Aggregate (RCA) : 6 graded stone aggregate 40 mm nominal size RecycledAggregate (RA)) |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 cement : 4 manufactured sand derived from Recycled Concrete Aggregate (RCA) : 8 graded stone aggregate 40 mm nominal size Recycled Aggregate (RA) |
| 7 | Centering and shuttering including strutting, propping etc. and removal of formwork for :Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. |
| 8 | Carriage of material by MT from source to site of work, incl. loading, unloading complete a)Solling Stone an avg lead 15 km |
| 9 | b)Cement an avg lead 22 km |
| 10 | c)Sand an avg lead 15 km |
| 11 | d)Stone Agg an avg lead 15 km |
| 12 | Carriage of material by Head load from source to site of work, incl. loading, unloading complete a)Stone agg an avg lead 200 mtrs |
| 13 | b)Solling Stone an avg lead 200 mtrs |
| 14 | c)Cement an avg lead 200 mtrs |
| 15 | d)Sand an avg lead 200 mtrs |
| 16 | Providing and fixing of Steel manual gate of required size as per the site Please Enable Macros to View BoQ information |