| 1 | GENERAL SUMMARY |
| 2 | Lump sum price worked out by the contractor against Schedule ‘A’ Part- I (BUILDING WORKS) for the following building works:- |
| 3 | (a) Lump sump amount worked out by the contractor for Design, development of structural drawings as per the architectural drawing Nos CWE/ARCH/34/2026 Sheet No. 1/3, CWE/ARCH/34/2026 Sheet No. 2/3, CWE/ARCH/34/2026 Sheet No. 3/3 and Provision of Guard room with toilet facility at BFFR as per architectural drawings, structural drawing, TD drawings, schedule of finishes incl ATT, WPT mosquito proofing with kota stone flooring (Gd Room), ceramic tiles (toilet) and all other services & given specifications, etc complete all as specified and as directed. NOTE:- The structural design and drawing shall be got vetted from any IITs/NITs before execution of work by the contractor. |
| 4 | Lump sum price worked out by the contractor for EXCAVATION AND EARTH WORK as listed in Schedule ‘A’ Part- II (Ref prepriced schedule attached seperately) |
| 5 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS as listed in Schedule ‘A’ Part-III (Ref prepriced schedule attached seperately) |
| 6 | Lump sum price worked out by the contractor for INTERNAL WATER SUPPLY WORKS as listed in Schedule ‘A’ Part-IV (Ref prepriced schedule attached seperately) |
| 7 | Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY WORKS as listed in Schedule ‘A’ Part-V (Ref prepriced schedule attached seperately) |
| 8 | Lump sum price worked out by the contractor for HARD STANDING/PATH/ROAD WORKS as listed in Schedule ‘A’ Part-VI (Ref prepriced schedule attached seperately) |
| 9 | Lump sum price worked out by the contractor for HOT WATER SUPPLY WORKS as listed in Schedule ‘A’ Part- VII (Ref prepriced schedule attached seperately) |
| 10 | Lump sum price worked out by the contractor for SEWAGE DISPOSAL WORKS as listed in Schedule ‘A’ Part- VIII (Ref prepriced schedule attached seperately) |
| 11 | SCH 'A' Pt - IX (MISCELLANEOUS PARTS) |
| 12 | M&L for concealed point wiring with 1.5 Sqmm PVC-FRLSH insulated, sheathed, copper conductor, stranded 1100 volt grade cable in & incl PVC conduit, including modular metal flush boxes & modular white cover plate with frame as per site requirement all fittings such as tees, bends, elbows, etc. of External diameter 20mm all as per site requirements PVC insulated & sheathed 1100 volt grade copper conductor, stranded 1.5 sqmm. cable as continuous earth lead complete all as specified and directed. |
| 13 | For one light, fan point controlled by one switch complete all as specified and directed |
| 14 | For one 5 Amp independent socket point controlled by one switch complete all as specified and directed |
| 15 | For one 3 pin ,5 Amp socket point with other switch on the same board complete all as specified and directed |
| 16 | All as per item No 9.10 here in before but for power point wiring using with 2.5 sqmm PVC-FR LSH insulated ,sheathed, copper conductor stranded 1100 volt grade cable and 2.5 sqmm PVC insulated ,sheathed, copper conductor stranded 1100 volt grade cable as continuous earth lead complete all as specified and directed. |
| 17 | S&F HDPE double wall corrugated sewage pipe of 150 mm internal bore, SN-8, ISI marked as per IS 16908 Part-II-2013 laid in trenches, jointed and tested as per manufacturer instruction complete all as specifed and directed. |
| 18 | Soakage well excavation , in any type of soil foundation in pcc 1:3:6 walls of honey combed masonary with top ring of M-25 concrete including intrcepting chamber and screen chamber made of brick masonary in CM , rcc cover slab in m25/SFRC cover interconnecting pipes of Rcc /DWc complete filled with brick bats of size 1.80mx3.00m effective depth |
| 19 | Supply, installation, commissioning and testing off grid connected ground/roof top solar PV generation 3 KW with battery including degradation, civil and general works, mounting structure, power conditioning unit, cable and transformers and prelim & Op. expenses complete all as specified and as directed with following connected items:-(i) Module 545WP/550WP mono cystline - 06 Nos(ii) Off grid MPPT PCU 3KVA - 01 No(iii) Solar C10 rating 150AH battery - 04 Nos(iv) GI structure for module mounting - 01 set(v) DCDB/ACDB - 01 No(vi) Earthing - 02 Nos(vii) DC cable/AC cable - As per site requirement(viii) Other balance system/ Installation - 01 No Please Enable Macros to View BoQ information |