| 1 | PART-A (Bldg.) |
| 2 | 1.8Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils |
| 3 | 3.1.6 & 3.1.2 Providing & Laying in position cement concrete i/c curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering – All work up to plinth level.: (A) 1:4:8 (1 cement:4 course sand: 8 graded stone aggregate 40 mm nominal size). |
| 4 | 6.1.6/B-6Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in: Cement Mortar 1:6 (1- Cement: 6- Sand). |
| 5 | 4.1Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix |
| 6 | 4.9Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. |
| 7 | 4.13.2 Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) Hot rolled deformed bars (IS : 1139). |
| 8 | 12.3.2/B-12Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish: (A) 20mm thick |
| 9 | 9.2/B-9Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete: |
| 10 | 14.2.1Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. 1: 3: 6 or richer mix. |
| 11 | 14.3Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. |
| 12 | 14.7.3Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar |
| 13 | 14.9.2Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge: In cement mortar |
| 14 | PART- B (Item Rate Basis) |
| 15 | Disposal of rubbish un-wanted material dismanted material, away from site at appropirate place including all lead and lift, loading unloading, transportation labour etc. As per direction of Engineer in charges. Please Enable Macros to View BoQ information |