| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 3 | Erecting one LT PSC Pole in position including digging & back filling pit in ordinary soil. |
| 4 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 5 | Providing End Caps |
| 6 | Providing Strut using LT PSC pole including digging and back filling pit in ordinary soil. |
| 7 | Providing Stay for LT poles including digging & back filling pit in ordinary soil. |
| 8 | Installing One No. Insulation piercing connector of size Main :16 to 95 , Tap : 1.5 to 16 Sq. mm |
| 9 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 10 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 11 | Insertion of one HT PSC pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 12 | Installation of Pre-insulated straight through joints for 16sqmm cable |
| 13 | Installation of Pre-insulated straight through joints for 70sqmm cable |
| 14 | Installation of Pre-insulated straight through joints for 50sqmm cable |
| 15 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 16 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 17 | Providing Fly stay for LT pole using LT PSC pole including digging and back filling pit in ordinary soil. |
| 18 | Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 19 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 20 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 21 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 22 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 23 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 24 | Erection of suspension clamp for LT ABC of any size Please Enable Macros to View BoQ information |