| 1 | 33kV 3C, 400sqmm UG Cable Supply of 33kV, 3Core, 400sqmm Aluminium, XLPE insulation UG Cable with spare (SC rating of cable in kA- 37.7kA and SC rating of Armour in kA-20kA) |
| 2 | Supply of Straight through jointing kits Heat Shrinkable type suitable for 33kV, 3Core, 400sqmm, aluminium UG Cable kits |
| 3 | Supply of Outdoor termination kits Heat Shrinkable type suitable for 33kV, 3Core, 400sqmm, HT UG Cable kits |
| 4 | Supply of materials for High Density Polyethelene (HDPE) pipe 200mm diameter, PE 80- PN8 for laying of 33kV UG cable |
| 5 | ERECTION Laying, Commissioning & Testing of 33kV, 3Core, 400sqmm, XLPE insulation (extruted type) UG cable with spare by open trench method. |
| 6 | Erection of Straight through jointing kits/Outdoor termination kits/ indoor termination Kits Heat Shrinkable type suitable for 33kV, 3Core, 400sqmm, aluminium UG Cable kits |
| 7 | Laying of 200mm dia PE 80-PN8, HDPE pipe inside open trench. |
| 8 | Civil Earth work excavation of soil |
| 9 | Earth work excavation of hard rock |
| 10 | Back filling with excavated soil outside and above the trench |
| 11 | Supply and erection of GI Pipe of dia. 150mm, Class-B (8Mtr.) |
| 12 | Supply and Erection of Cable Route Marker along the cable route at an interval of 30mtrs with civil works |
| 13 | Part - 1 :- 11kv O/H line length with 50 mtr span using 100 sq mm PSC pole 10meter long 330 kg |
| 14 | PSC Pole Clamp (GI) |
| 15 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 1.2 mtr., 2 no's channel required =( 2x9.56x1.2) |
| 16 | Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 8 no's required = (8x2.36x0.280) |
| 17 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 0.306 mtr., 2 no's channel required =(2x9.56x0.306) |
| 18 | Danger Plate, 1 no's. |
| 19 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 20 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 21 | Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 22 | 11 KV pin insulator polymer |
| 23 | H W fitting(B&S) 70KN, 3Bolt |
| 24 | Disc insulator (B&S) 70 KN polymer |
| 25 | Earthing of Support ( Coil Type ) |
| 26 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 27 | Wedge connector for 100 sqmm AAA conductor |
| 28 | Polycarbonate bird guard |
| 29 | GI Nut , Bolt & Washer of different sizes (3.55 Kg each Cut Pole) |
| 30 | Black Paint |
| 31 | Yellow Colour Paint for Background |
| 32 | CIVIL and Service WorksConcreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr |
| 33 | No. of Cut Point with 90 Degree Angle(Ref. Drawing No.- TPCODL-MVD-0005)H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair) |
| 34 | H.T. Stay set (Complete ) |
| 35 | H.T. Stay Insulator Type-C |
| 36 | 7/10 SWG Stay Wire 15kg /stay |
| 37 | GI Nut , Bolt & Washer of different sizes (7.433 Kg each Cut Pole) |
| 38 | 11kV Line Length with 50 Mtr. Span using 100 SQ.MM. -AAA ConductorPSC pole 10meter long 330 kg |
| 39 | PSC Pole Clamp (GI) |
| 40 | 11 KV V cross Arm (10.2 K.g. each ) |
| 41 | Top bracket 100x50X6 mm GI channel (2kg each) |
| 42 | Danger Plate, 1 no's. for each pole |
| 43 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 44 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 45 | Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 46 | 11 KV pin insulator polymer, 3 Nos. required for each support |
| 47 | Earthing of Support ( Coil Type ) |
| 48 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 49 | GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point) |
| 50 | 100 mm2 AAAC |
| 51 | Black Paint |
| 52 | Yellow Colour Paint for Background |
| 53 | Polycarbonate bird guard |
| 54 | Civil and servicesConcreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr |
| 55 | No. of DP required With AB Switch (Ref. Drawing No.- TPCODL-MVD-0001WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.) |
| 56 | Top Channel 100X50X6mm, 9.56 KG/Mtr., each channel length 3 mtr., 2 no's channel required =( 2x9.56x3) |
| 57 | Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 58 | AB switch Mounting Channel 75X40X4.8mm, 7.14KG/Mtr, each channel length 3 Mtr., 2 no's channel required =( 7.14x3x2) |
| 59 | AB Switch Side Support Channel 100X50X6mm,9.56 KG/Mtr., each channel length 0.35 mtr., 2 no's channel required =( 9.56x2x0.35) |
| 60 | Channel Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each channel length 0.8 Mtr., 1 no's channel required =( 7.14x0.8x1) |
| 61 | Double Pole Belting Channel 75X40X 4.8mm., 7.14KG/Mtr., each channel length 3.0 Mtr., 4 no's channel required =( 7.14x3x4) |
| 62 | 50x50x6mm.GI Bracing Angle, 4.5Kg./mtr., each angle length 3.512 mtr., 4 nos angle required = (4.5x3.512x4) |
| 63 | Danger Plate, 2 no's. |
| 64 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 65 | H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair) |
| 66 | H.T. Stay set (Complete ) |
| 67 | H.T. Stay Insulator Type-C |
| 68 | 7/10 SWG Stay Wire 15kg /stay |
| 69 | Gi Pipe Earthing 40mm. 3 Mtr. Long |
| 70 | 50x6mm GI Flat for earthing, 2.36kg/mtr., (12.5 Mtr. For L.A, 3 Mtr for AB Switch Body, 2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 20.5x2.36 |
| 71 | GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required =(2x3kg) |
| 72 | Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 73 | Lightning Arrester(12KV,10KA) (Station Class,class-2) |
| 74 | AB Switch (11KV,400A.3pole,50Hz) |
| 75 | 11 KV pin insulator polymer |
| 76 | H W fitting(B&S) 70KN, 3Bolt |
| 77 | Disc insulator (B&S) 70 KN polymer |
| 78 | Wedge connector for 100 sqmm AAA conductor |
| 79 | Polycarbonate bird guard |
| 80 | GI Nut , Bolt & Washer of different sizes (13.718 Kg each DP with AB Switch) |
| 81 | Black Paint |
| 82 | Yellow Colour Paint for Background |
| 83 | Civil and servicesFixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 84 | Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr |
| 85 | Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr |
| 86 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flataround pipe . |
| 87 | 11 Kv Line Length In KM with 50 Mtr. Span (Ref. Drawing No.- TPCODL-MVD-0003)9 Mtr. long 300 Kg. PSC Pole |
| 88 | LT Stay set Complete |
| 89 | 7/12 SWG GI stay wire, Grade -2 |
| 90 | LT stay Clamp ( 1.40Kg/pair) |
| 91 | LT Stay insulator |
| 92 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 93 | EYE hook for XLPE Aerial bunched Cable |
| 94 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 95 | Suspension Clamp with EYE hook for ABC |
| 96 | 4C×50 mm² (P)+1C×50 mm²(M)+1CX16 mm²(Street Light) (LT AB Cable) |
| 97 | Insulated piercing connector.Type-A-main 50 to 150 sq.mm & Tap-50 to 150 sq.mm |
| 98 | Pipe Earthing (each 5th pole to earth) |
| 99 | Coil Earthing |
| 100 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 101 | Danger plate (LT) |
| 102 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 103 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 104 | Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 105 | GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole) |
| 106 | Black Paint |
| 107 | Yellow Colour Paint for Background |
| 108 | Civil and servicesFixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.) |
| 109 | Concreting ratio 1:1.5:3 (500mmX500mmX1500mm) = 0.375Cu.mtr |
| 110 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flataround pipe . |
| 111 | 11kV 3C, 400sqmm UG CableSupply of 11kV, 3Core, 400sqmm Aluminium, XLPE insulation UG Cable with spare (SC rating of cable in kA- 37.7kA and SC rating of Armour in kA-20kA) |
| 112 | Supply of Straight through jointing kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm, aluminium UG Cable kits |
| 113 | Supply of Outdoor termination kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm, HT UG Cable kits |
| 114 | Supply of materials for High Density Polyetheline (HDPE( piope 200mm diameter, PE 80-PN8 for laying of 11kV UG cable. |
| 115 | Supply of materials for High Density Polyethelene (HDPE) pipe 200mm diameter, PE 80- PN8 for laying of 11kV UG cable |
| 116 | Erection of Straight through jointing kits/Outdoor termination kits/ indoor termination Kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm, aluminium UG Cable kits |
| 117 | Installation, Laying, Comissioning & Testing of 11kV, 3Core, 400sqmm, XLPE insulation UG cable by HDD method with HDPE Pipe (200mm dia PE 80-PN8) including HDPE Pipe |
| 118 | Laying of 200mm dia PE 80-PN8, HDPE pipe inside open trench. |
| 119 | Supply & erection of GI pipe of dia 150mm, class-B (8mtr.) |
| 120 | Supply & erection of cable route maker along the cable route at an interval of 3 months with civil work |
| 121 | 1.1kv XLPE insulation armoured U/G cable along with Multimeter panel and Lt feeder pillar Supply of 1.1KV 4core 35 sqmm XLPE insulation armoured U/G cable along |
| 122 | ERECTION Installation, Laying, Comissioning & Testing of LT XLPE insulation UG cable by HDD method with HDPE Pipe (110mm dia PE 80-PN8) including HDPE Pipe |
| 123 | Supply and erection of double Compression flameproof type glanding for armoured Cable 3.5/4C 16-35 sqmm including making hole in Base plate and dressing of cab le along wiht vermin proofing properly supply to be done as per TPCODL Spec and approved make dowells |
| 124 | Dismantling Portion Dismentling of 9/8 Mtr PCC/ Joist Pole |
| 125 | Dismentling of 11/13 mtr Joist /WPB pole 150X150MM / 160X160MM |
| 126 | Dismentling of Various size LT AB CABLE |
| 127 | Dismentling of ACSR /AAAC 80/ 100mm2 form overhead line |
| 128 | Dismentling of ACSR /AAAC 34/ 55mm2 form overhead lineN:B:. Salvage Value @ 8% to be deducted from the contractor's Bill. Please Enable Macros to View BoQ information |