|
| 1 | Earth work in Hard soil with in 50m initial lead & 1.5m Initial lift Inclunding Rough dressing & Brecking clods etc complete |
| 2 | Sand filling in foundation with well watered & rammed with all cost of carriage & royality etc. comlete. |
| 3 | C.C (1:3:6) with using 4cm size C.B.G metal with all cost of carriage & royality. |
| 4 | Fly ash brick masonry in CM (1:6) for f&p including necessary scaffolding ,raking out joints, curring etc complete as per specfication and direction of the engineer in-charge |
| 5 | Fly ash brick masonry in CM (1:6) for super structure including necessary scaffolding ,raking out joints, curring etc complete as per specfication and direction of the engineer in-charge |
| 6 | R.C.C m20 with 20mm and down grade HGCB chips including hosting and layering, all cost conveyance,royalty (excluding cost of steel) |
| 7 | Labour for cutting bending and binding and placing in position of reinforcenent steel for rcc work,incuding cost of baiding wire etc complete |
| 8 | Rigid Centering shuttering a) Foundation upto plinth |
| 9 | Rigid Centering shuttering b) Column and Beam |
| 10 | Rigid Centering shuttering c) Lintel |
| 11 | Rigid Centering shuttering d) Chajja and Slab |
| 12 | 20mm thick cp (1:4) as grade plaster |
| 13 | 16 MM THICK CP(1:6) over brick masonary work incuding necessary scaffolding,currng ctc complete (inside) |
| 14 | 12 MM THICK CP(1:6) over brick masonary work incuding necessary scaffolding,currng ctc complete |
| 15 | 6 mm Thick Plaster on RCC work |
| 16 | Fixing tile (vitrified ) on floor 20mm thick bed in cm(1:4) jointed with neat cement slury mixed ith pigment to match the shades |
| 17 | Fixing tile (vitrified ) in wall in 12mm thick bed in cm(1:3) jointed with neat cement slury mixed ith pigment to match the shades |
| 18 | Cost of window grill (including labour charge) |
| 19 | Cost of M S Door (including labour charge) |
| 20 | Finishing surface of walls with cement based wall putty (water bsed) of appoved make and finished smooth and even surface to receive painting including cost of all materials taxes labour t&p |
| 21 | Finishing walls with wall primer |
| 22 | Painting 2 coat with plasic paint |
| 23 | Finishing walls with weather proofing paint |
| 24 | Priming one coat to D & W |
| 25 | Painting two coat to iron work |
| 26 | Supplying,fitting and fixing of Stainless steel Please Enable Macros to View BoQ information |