| 1 | Dismanteling & removing cement concrete including stacking the useful materials for reuse and removing the debris with in 50. m Lead. (per 1 Cum.) |
| 2 | Earth work Excavation in all kinds of soil within intial lead and lift including rough dressing and levelling the ground etc. complete. |
| 3 | Carriage of Excavated earth by mechanical means within 5 km lead including loading and unloading with all cost conveyance T & Psundries etc complete as per direction of Engineer- in-charge. |
| 4 | Filling sand in foundation well watered & rammed including cost, conveyance, royalty I taxes etc. complete of all materials to work site as the specification approved by the department and direction of Engg-in-charge. |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass |
| 6 | Columns, Pillars, Piers, Abutments, Posts and Struts |
| 7 | PCC in prop. (1:4:8) in foundation and bed using 4 cm size h.g C.B metal of approved quality and approved quarry including hoisting, lowering, laying concrete and compacting the same to required level, with compaction, watering and curing including cost, conveyance, royalties and taxes of all materials with cost of all labours, sundries and T & p such as hire charges of concrete mixer, concrete vibrator required for the work etc complete as per the specification and direction of ElC |
| 8 | Reinforced Cement concrete work of M-25 grade concrete with 20 mm down graded crusher broken hard granite chips (per Cum) (Data per 15 cum.) |
| 9 | Supplying fitting & placing uncoated HYSD reinforcement |
| 10 | Fixing of foundation bolt MS 25 X 1000 mm |
| 11 | Design, supply, fabrication, assembly, hoisting, and erection of MS Tubular Structure (MS) conforming to IS 2062 Grade YST 210–310. The tubular structure shall be made from steel hollow sections, ISI marked (TATA /JINDAL /APPOLO make), conforming to IS 1161 / IS 4923, Grade YST 240–310, |
| 12 | Hoisting of joists and trusses and placing them in position, complete (labour only), including cost of conveyance, royalties, taxes, labour, T&P, and all incidental charges, as per the direction of the Engineer-in-Charge. |
| 13 | Painting two coats over one coat of primer on new woodwork or ironwork, including the cost of primer and paint, for I-section members, base plates, trusses, and other steel components, complete as per the direction of the Engineer-in-Charge. |
| 14 | Design, supply, fabrication, and installation of tensile fabric membrane roofing structure using PTFE membrane, including membrane panels, steel cables, GI corner fittings, and all associated accessories.The membrane fabric shall be PVDF Type III, manufactured by Serge Ferrari or Verseidag, with the following minimum technical specifications:• Minimum Weight: 1140 g/m²• Minimum Tensile Strength (Warp / Weft): 6000 / 5500 N per 5 cm• Minimum Tear Strength (Warp / Weft): 350 / 350 N• Fire Resistance Rating: Euro Class B-s1, d0• DIN Standard: DIN 4102 B1• Microorganism Resistance: High resistance• Warranty: 15 years (100%) |
| 15 | Supply and fixing of 2.00 mm thick MS sheet with CNC profile cutting as per the approved concept design, including surface preparation, application of primer, and two coats of paint finishing, complete with all materials, labour, tools & plants, and incidental charges, finished in all respects as directed by the Engineer-in-Charge. |
| 16 | Supplying and fixing of 2mm thickness PVC wire mesh (50mm spacing) chainlink make TATA clading with MS framework in square/ round shape with 600mm dia x 4500 height etc all as per instruction of Engineer in charge |
| 17 | Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm,refilling the excavated earth after breaking clods and mixing with Farm yard manure in the ratio of 8:1(8 parts of staked volume of earth after reduction by20%:one part of stacked volume of FYM after reduction by 8%),flooding with water,filling with earth necessary,watering and finally fine dressing,levelling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and levelling as directed,within alead of 50 m,lift upto 1.5 m complete(cost of manure,earth to be paid separately) |
| 18 | Supplying and staking of Farm yard Manure(cowdung based) from approved source carriage upto 5 km lead complete(Manure measured in stacks will be reduced by 8% for payment),trench to be filled with soil&FYM in 1:8,reqt of FYM |
| 19 | Screened the FYM through sieve of I.S. designation 20 mm |
| 20 | Supplying and staking of garden soil/good earth at site including royality and carriage upto 10 km lead complete(earth measured in stacks will be reduced by 20% for payment),cost for1cum |
| 21 | Mixing earth and FYM in the required proportion specified or directed by Horticulture officer incharge |
| 22 | Spreading of Sieved FYM & soil in required thickness as per direction of Horticulture officer-in-charge(cost of FYM,good earth to be paid separately |
| 23 | Supply of ornamental creepers and Shrubs |
| 24 | Bignonia venusta (Golden shower) of height 30 cm to 45 cm. in 20 cm size of Earthen pot/Plastic pot |
| 25 | Clerodendrum inerme having ht. 25 cm to 30 cm multi branched in 25 cm size of Earthen Pot / Plastic Pot. |
| 26 | Plantation of Ornamental tree,palm,shruba and hedges at site including watering,removal of unservicable materials as per direction of HO incharge(excluding cost of plants&water) Cost of Planting Shrub |
| 27 | Maintenance for 1 year of structure including washing, painting & watering, training, weeding and manure application Please Enable Macros to View BoQ information |