| 1 | Repairing Work of 11/0.4 KV 100 KVA Transformer. |
| 2 | New copper coil. |
| 3 | Return old copper coil. |
| 4 | Oil dehydration Work of transformer. |
| 5 | Providing and filling of transformer oil. |
| 6 | Providing and replacement of damaged LT bushing. |
| 7 | Providing and replacement of damaged HT bushing. |
| 8 | Repairing work of oil tank. |
| 9 | Oil tank will repair at Site (in case miner Leakage). |
| 10 | Oil tank will repair in workshop (in case major Leakage). |
| 11 | Replacement of new oil tank. |
| 12 | Providing and filling of 250 gm silika gel box. |
| 13 | Providing and filling of 500 gm silika gel box. |
| 14 | Providing and filling of 1000 gm silika gel box. |
| 15 | Replacement of new radiator. |
| 16 | Replacement of new tape changer. |
| 17 | Replacement of damaged M.S or C.I LT box. |
| 18 | Replacement of damaged analogue temperature gauge size-200 mm. |
| 19 | Replacement of damaged temperature probe. |
| 20 | Transportation From site to Contractor Workshop. (including Loading/Unloading ,Before and After Repairing |
| 21 | Repairing Work of 250 KVA/ 11/0.4 KV Transformer. |
| 22 | New copper coil. |
| 23 | Return old copper coil. |
| 24 | Oil dehydration Work of transformer. |
| 25 | Providing and filling of transformer oil. |
| 26 | Providing and replacement of damaged LT bushing. |
| 27 | Providing and replacement of damaged HT bushing. |
| 28 | Repairing work of oil tank. |
| 29 | Oil tank will repair at Site (in case miner Leakage). |
| 30 | Oil tank will repair in workshop (in case major Leakage). |
| 31 | Replacement of new oil tank. |
| 32 | Providing and filling of 250 gm silika gel box. |
| 33 | Providing and filling of 500 gm silika gel box. |
| 34 | Providing and filling of 1000 gm silika gel box. |
| 35 | Replacement of new radiator. |
| 36 | Replacement of new tape changer. |
| 37 | Replacement of damaged M.S or C.I LT box. |
| 38 | Replacement of damaged analogue temperature gauge size-200 mm. |
| 39 | Replacement of damaged temperature probe. |
| 40 | Transportation From site to Contractor Workshop. (including Loading/Unloading ,Before and After Repairing |
| 41 | Repairing Work of 400 KVA/ 11/0.4 KV Transformer. |
| 42 | New copper coil. |
| 43 | Return old copper coil. |
| 44 | Oil dehydration Work of transformer. |
| 45 | Providing and filling of transformer oil. |
| 46 | Providing and replacement of damaged LT bushing. |
| 47 | Providing and replacement of damaged HT bushing. |
| 48 | Repairing work of oil tank. |
| 49 | Oil tank will repair at Site (in case miner Leakage). |
| 50 | Oil tank will repair in workshop (in case major Leakage). |
| 51 | Replacement of new oil tank. |
| 52 | Providing and filling of 250 gm silika gel box. |
| 53 | Providing and filling of 500 gm silika gel box. |
| 54 | Providing and filling of 1000 gm silika gel box. |
| 55 | Replacement of new radiator. |
| 56 | Replacement of new tape changer. |
| 57 | Replacement of damaged M.S or C.I LT box. |
| 58 | Replacement of damaged analogue temperature gauge size-200 mm. |
| 59 | Replacement of damaged temperature probe. |
| 60 | Transportation From site to Contractor Workshop. (including Loading/Unloading ,Before and After Repairing |
| 61 | Repairing Work of 630 KVA/ 11/0.4 KV Transformer. |
| 62 | New copper coil. |
| 63 | Return old copper coil. |
| 64 | Oil dehydration Work of transformer. |
| 65 | Providing and filling of transformer oil. |
| 66 | Providing and replacement of damaged LT bushing. |
| 67 | Providing and replacement of damaged HT bushing. |
| 68 | Repairing work of oil tank. |
| 69 | Oil tank will repair at Site (in case miner Leakage). |
| 70 | Oil tank will repair in workshop (in case major Leakage). |
| 71 | Replacement of new oil tank. |
| 72 | Providing and filling of 250 gm silika gel box. |
| 73 | Providing and filling of 500 gm silika gel box. |
| 74 | Providing and filling of 1000 gm silika gel box. |
| 75 | Replacement of new radiator. |
| 76 | Replacement of new tape changer. |
| 77 | Replacement of damaged M.S or C.I LT box. |
| 78 | Replacement of damaged analogue temperature gauge size-200 mm. |
| 79 | Replacement of damaged temperature probe. |
| 80 | Transportation From site to Contractor Workshop. (including Loading/Unloading ,Before and After Repairing |
| 81 | Repairing Work of 250 KVA/ 33/0.4 KV Transformer. |
| 82 | New copper coil. |
| 83 | Return old copper coil. |
| 84 | Oil dehydration Work of transformer. |
| 85 | Providing and filling of transformer oil. |
| 86 | Providing and replacement of damaged LT bushing. |
| 87 | Providing and replacement of damaged HT bushing. |
| 88 | Repairing work of oil tank. |
| 89 | Oil tank will repair at Site (in case miner Leakage). |
| 90 | Oil tank will repair in workshop (in case major Leakage). |
| 91 | Replacement of new oil tank. |
| 92 | Providing and filling of 250 gm silika gel box. |
| 93 | Providing and filling of 500 gm silika gel box. |
| 94 | Providing and filling of 1000 gm silika gel box. |
| 95 | Replacement of new radiator. |
| 96 | Replacement of new tape changer. |
| 97 | Replacement of damaged M.S or C.I LT box. |
| 98 | Replacement of damaged analogue temperature gauge size-200 mm. |
| 99 | Replacement of damaged temperature probe. |
| 100 | Transportation From site to Contractor Workshop. (including Loading/Unloading ,Before and After Repairing |
| 101 | Repairing Work of 400 KVA/ 33/0.4 KV Transformer |
| 102 | New copper coil. |
| 103 | Return old copper coil. |
| 104 | Oil dehydration Work of transformer. |
| 105 | Providing and filling of transformer oil. |
| 106 | providing and replacement of damaged LT bushing. |
| 107 | providing and replacement of damaged HT bushing. |
| 108 | Repairing work of oil tank. |
| 109 | Oil tank will repair at Site (in case miner Leakage). |
| 110 | Oil tank will repair in workshop (in case major Leakage). |
| 111 | Replacement of new oil tank. |
| 112 | Providing and filling of 250 gm silika gel box. |
| 113 | Providing and filling of 500 gm silika gel box. |
| 114 | Providing and filling of 1000 gm silika gel box. |
| 115 | Replacement of new radiator. |
| 116 | Replacement of new tape changer. |
| 117 | Replacement of damaged M.S or C.I LT box. |
| 118 | Replacement of damaged analogue temperature gauge size-200 mm. |
| 119 | Replacement of damaged temperature probe. |
| 120 | Transportation From site to Contractor Workshop. (including Loading/Unloading ,Before and After Repairing for Each Unit of Hospitals in Moradabad Division) |
| 121 | Repairing Work of 630 KVA/ 33/0.4 KV Transformer |
| 122 | New copper coil. |
| 123 | Return old copper coil. |
| 124 | Oil dehydration Work of transformer. |
| 125 | Providing and filling of transformer oil. |
| 126 | providing and replacement of damaged LT bushing. |
| 127 | providing and replacement of damaged HT bushing. |
| 128 | Repairing work of oil tank. |
| 129 | Oil tank will repair at Site (in case miner Leakage). |
| 130 | Oil tank will repair in workshop (in case major Leakage). |
| 131 | Replacement of new oil tank. |
| 132 | Providing and filling of 250 gm silika gel box. |
| 133 | Providing and filling of 500 gm silika gel box. |
| 134 | Providing and filling of 1000 gm silika gel box. |
| 135 | Replacement of new radiator. |
| 136 | Replacement of new tape changer. |
| 137 | Replacement of damaged M.S or C.I LT box. |
| 138 | Replacement of damaged analogue temperature gauge size-200 mm. |
| 139 | Replacement of damaged temperature probe. |
| 140 | Transportation From site to Contractor Workshop. (including Loading/Unloading ,Before and After Repairing for Each Unit of Hospitals in Moradabad Division) |
| 141 | Providing & Fixing of New Transformers, Servos & VCB. |
| 142 | Supply of new 250 KVA / 33/0.4 KV AS PER I.S.-1180 PART II , 2014 WITH ALL STANDERD ACCESSORIES |
| 143 | Installation of New Transformer including loading, unloading separate earthing of Nutrel and body (03 No.) and HT/LT side Connection extra etc. |
| 144 | Supply of new 400 KVA / 33/0.4 KV AS PER I.S.-1180 PART II , 2014 WITH ALL STANDERD ACCESSORIES |
| 145 | Installation of New Transformer including loading, unloading separate earthing of Nutrel and body (03 No.) and HT/LT side Connection extra etc. |
| 146 | Supply of new 630 KVA / 33/0.4 KV AS PER I.S.-1180 PART II , 2014 WITH ALL STANDERD ACCESSORIES |
| 147 | Installation of New Transformer including loading, unloading separate earthing of Nutrel and body (03 No.) and HT/LT side Connection extra etc. Please Enable Macros to View BoQ information |