| 1 | Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge. |
| 2 | Filling in foundatin and plinth with sand watered and rammed etc including all cost conveyance roalty ,labour and T&P etc. complete as directed by the Engineer - in Charge |
| 3 | Cement concrete (1:4:8)with 4cm size hard granite metal per 1cum |
| 4 | Providing R.C.C. M20 using 20mm & down grade size hard grinite chips with lowering,laying the concrete & curing, etc. compacting to required depth & levels, including supply of all materials, labour, T&P required for the work including cost, conveyance, royalities & all taxes of all materials etc. complete including centering & shuttering as per drawing specification & direction of Engineer-in-charge. Clumn Base |
| 5 | Providing R.C.C. M20 using 20mm & down grade size hard grinite chips with lowering,laying the concrete & curing, etc. compacting to required depth & levels, including supply of all materials, labour, T&P required for the work including cost, conveyance, royalities & all taxes of all materials etc. complete including centering & shuttering as per drawing specification & direction of Engineer-in-charge. Plinth Bend |
| 6 | Providing R.C.C. M20 using 20mm & down grade size hard grinite chips with lowering,laying the concrete & curing, etc. compacting to required depth & levels, including supply of all materials, labour, T&P required for the work including cost, conveyance, royalities & all taxes of all materials etc. complete including centering & shuttering as per drawing specification & direction of Engineer-in-charge.Column Beam ss |
| 7 | Providing R.C.C. M20 using 20mm & down grade size hard grinite chips with lowering,laying the concrete & curing, etc. compacting to required depth & levels, including supply of all materials, labour, T&P required for the work including cost, conveyance, royalities & all taxes of all materials etc. complete including centering & shuttering as per drawing specification & direction of Engineer-in-charge. Lintel |
| 8 | Providing R.C.C. M20 using 20mm & down grade size hard grinite chips with lowering,laying the concrete & curing, etc. compacting to required depth & levels, including supply of all materials, labour, T&P required for the work including cost, conveyance, royalities & all taxes of all materials etc. complete including centering & shuttering as per drawing specification & direction of Engineer-in-charge.Chajja |
| 9 | Providing R.C.C. M20 using 20mm & down grade size hard grinite chips with lowering,laying the concrete & curing, etc. compacting to required depth & levels, including supply of all materials, labour, T&P required for the work including cost, conveyance, royalities & all taxes of all materials etc. complete including centering & shuttering as per drawing specification & direction of Engineer-in-charge. Roof Slab |
| 10 | Supplying ,fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification. |
| 11 | Brick work with Fly ash bricks of 23 Cm. x 11 Cm. x 8 Cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in foundation and plinth per cum. Foundation and Plinth |
| 12 | Brick work with Fly ash bricks of 23 Cm. x 11 Cm. x 8 Cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in foundation and plinth per cum. Super Structure |
| 13 | Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum |
| 14 | Cement punning per Sqm. |
| 15 | 12mm. thick cement plaster (1:6) for brick work |
| 16 | 16 mm. thick cement plaster (1 :6) over brick or stone masonry per 1Sqm. |
| 17 | Iron work for door, window, grills, RS ,welding, Labour, carrrage placing in position etc complete . |
| 18 | Supplying, fitting and fixing vetrifed tile in floors of size 600mm x 600mm of approved make conforming to IS: 13755 laid on 20 mm thick cement mortar (1:4) (1 cement :4 course sand ) and filling joints with white cement of approved quality including cost of all materials , labour T & P etc required for the work all complete as per direction of Engineer-in Charge.(For New work only) |
| 19 | Fixing tiles in dados striking and rises of steps on 12mm cement plaster ( 1:3 ) jointed with neat cement slury mixed with pigment to match the shade of the tiles including rubbing and polishing complete excluding cost of precast tiles per 1sqm (data for 10sqm) |
| 20 | Finishing wall surface with plastic emulsion paint of approved shade on new work of two coats over one coat of primer including cost of paints & primer and labour charges etc complete. |
| 21 | Finishing surface of walls with Cement based wall putty (Water based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes, labour T&P etc complete. |
| 22 | Finishing wall surface with weather coat paint of approved shade on new work of two coats over one coat of primer including cost of paints & primer and labour charges etc complete. |
| 23 | Painting two coats with enamel paints over one coat of primer with approved quality paints & primer to Wood/Iron work including cost of paints & primer,T&P and labour charges etc complete. |
| 24 | Provision for P.H., Sanitary fittings & other unforseen items including all cost complete etc.(as per actual Voucher) |
| 25 | Provision for Electrification including all cost complete etc.(as per actual Voucher) |
| 26 | Provision for Photograph (Prestage/middle stage/Final stage), Display board & unforeseen item. Please Enable Macros to View BoQ information |