| 1 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay,stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil |
| 2 | Supplying and Filling with foundation and basement with M sandd inin 15cm. Thick layers well rammed & consolidated, including watering, complying with std.specification etc complete. |
| 3 | Refilling with Excavated Earth and well rammed & consolidated, including watering, complying with std.specification etc complete. |
| 4 | Plain Cement Concrete 1:5:10 (One cement, five sand and ten hard broken granite stone jelly) using 40mm HBG metel for foundation concrete including dewatering wherever necessary and laid in layers of not more than 15cm. thick complying with std specification. |
| 5 | Random Rubble masonry work Combination mortar 1:1:5 mix using selected stones and rough stones including dewatering wherever necessary proper setting,curing,etc., |
| 6 | Providing and laying in position, Standardised Concrete Mix M20 Grade in accordance with IS 456:2000 using 20mm and down graded hard broken granite stone jelly for all rcc works with minimumm cement content 325Kg/m3 and maximum water cement ratio of 0.55, including admixture(plasticiser /super plasticiser) in commanded proportions as per IS 9103 to acclerate, retard setting of concrete, improve workability with out i paring strength and durability with about (5 cum) 7730 Kg of20mm machine crushed stone jelly and with about (3.3 Cum) 5156 Kg of 10 12mm machine crushed stone jelly and with about (4.79cum) 7670 Kg of sand, but excluding cost of reinforcement grill and fabrication charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing etc and providing fixtures like fan clamps in RCC floor/ roof slabs wherver necessary without claming extra complete complying std specification and also directed by departmental officers. The coarse and fine aggregates to be used should comply with requirements of IS standard |
| 7 | A) For Sub Structure |
| 8 | Centering for soffits of reinforced cement concrete slabs, plain surface including strutting 3 meter height using MS plates of size 90cmx60cmand 10 gauge stiffen and with welded mild steel angles of size 25x25x3mm laid over silver oak |
| 9 | (A) For Basement |
| 10 | Supplying, Fabrication and placing in position of M.S. or RTS rods reforcement grill in position for all RCC works including cost of steel rods and binding wire etc., complete |
| 11 | Brick work in Lime Mortar 1:2 mix using country bricks 83/4\\"x43/8\\"x23/4\\" size inculding curing, scaffolding etc. [complete complying with std. specification |
| 12 | Ornamental Brick work in Lime Mortar 1:1.5 mix using country bricks 83/4\\"x43/8\\"x23/4\\" all vari vargams, moulds, sthambas, mukapatram, koodu, nasi, and all ornamental brick workcomplete panchavarnam agaraies, karnakoodus etc forming core walls rajagopuram/vimanams complete including labour chagersetc complete complying the std specifications. |
| 13 | Kalkaram |
| 14 | Vimanam 15' ht |
| 15 | Providing Vargapoochu over the core walls of 11.5Vimanams/Gopurams,with Lime Mortar 1:1:5 complete including Shaping the mukhapathram, mahanasi, koodu all ornamental works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough plastering with Combination Mortor 1:1:4and finshing with final ornamental plastering nayam theervani including cost and conveyance of all materials, labour there fore lifting of materials, all working in heights curing with water etc complete including all extra for folding and including clearing from the vimanams/gopurams 100 sft superficial area for kalkaram. |
| 16 | Kalkaram |
| 17 | Vimanam 15' ht |
| 18 | Plastering with LIME MORTAR 1:1.5 mix to 12mm thick 12 including cost and conveyance of all materials to site and all labour charges etc |
| 19 | Supplying and fixing teak wood temple type door including all materials, labour charges for manufacturing and fixing I position including all furniture fittings etc complete with std specifications. |
| 20 | Paving with cut stone flooring using cut stone of size 600MM x 600MM X 100MM thick and all the sides are machine cutting top surface is neatly dressed and pointing with lime mortar 1:1.5 including all materials and labour charges. |
| 21 | Supply of cut stone for carrying out Garpagraham, Arthamandapam, Maha Mandapam, Thirumathil and other Temple Structures upto 10 feet length |
| 22 | Pillar |
| 23 | Bodhival |
| 24 | Uthiram |
| 25 | Pavukkal |
| 26 | Labour charge for New stone dressing and Fixing, |
| 27 | Pillar |
| 28 | Bodhiyal |
| 29 | Uthiram |
| 30 | Pavukkal, |
| 31 | Painting two coats over the new plastered surface with water based emulsion paint including all materials and labour charges etc complete. |
| 32 | Painting two coats for new wood works such as other similar works etc, complete complying with std specification |
| 33 | Providing Scaffolding for vimanam raja gopuram with non flammebable materials wherever necessary for main form work and by providing coconut keeth as covering the areas & plat form for inspection etc all complete. |
| 34 | Providing new sudhai vigrahams in the vimamams andjagopurams with copper iron rod Reinforecement of suitable dia with binding wires wherever necessary, shapping the core with hroken bricks set in Combination mortor 1:1:3 finishing the same with Combination mortor 1:1:3 bringing to the correct shape (hskshana) in conformist with silpa sastra inclusive of specials 20 emaments, weapons.peedam etc., complete and providing C.M Inyam theervai wherever necessary inchusive of cost and Joonveyance of all materials, such as cement broken bricks, and oopper rods binding wire all labour for working in heights curing lifting of materials etc.,complete including cement painting 2coats over a primary coat |
| 35 | Size of I'-6\\" to 2'-6\\" |
| 36 | Size of 1-6\\" to 2'-6\\" |
| 37 | Weathering course with brick jelly lime concrete using 20mm brick jelly with pure slacked lime over R.C.C. roof slab in theproportion of 32:12.5 and well watering consolidated with wooden beaters to slop including cost and conveyance of materials to site and labour charges etc |
| 38 | Finising the top of the roof with one course of pressed tiles of size 20X20X2cm over a bed of Combination mortor 1:1:3 12mm thick mixed with water proof compound at 2% b weight of cement including cost and conveyance ofall materials to site and all labour charges etc |
| 39 | Painting with multicolour (Panchavarnam) good water based exterior emulson paints complete for the Vinamans/Gopurams, including cost and conveyance of all materials, lobour charges including Artist painter, working in heights, lifting of material. cost of brushes etc, complete-which including all extra for foldings-100sft, superficial area |
| 40 | Vimanam 15' ht |
| 41 | sub total |
| 42 | GST 18% Please Enable Macros to View BoQ information |