| 1 | Collection of Field Maps and Revenue records: Towards the charges for collection of field maps, patta, chitta, land owners details, etc., pertaining to both sides of approved alignment as instructed by the Department Officers for survey numbers involved from the starting chainage to ending chainage of this project for the proposed alignment for formation of corridor. (Field work to collect details) |
| 2 | Conversion of Individual FMB into Auto CAD File: Identification of respective lands that are corridored by the Transmission Line by Transect Walking System aiding with GPS devices along the center line of the corridor. Preparation of rough alignment sketch by denoting the Survey Numbers of the land that pass through. Based on the sketch, conversion of indivdual FMB Sketch with Ladder measurements that are corridored by the Transmission Line to be done within the Tolerance Limit in AutoCAD. Tolerance Limit shall be applied as per the Survey of India's Guidelines. |
| 3 | Combining FMB Sketches and converting into KML File: As per prevailing practices/guidelines, width markings to be carried out on either side from mid-line for entire individual FMB Sketches that pass through the Transmission Line Corridor. Further, entire Individual FMB sketches to be combined for forming alignment Topo Drawing. Profiling of the combined FMB Sketches in the field by providing Control Points at every 2km interval using DGPS Instrument. With Reference to the Control Points, the entire Transmission Line Corridor to be compiled as KML File. |
| 4 | Conducting Topographical Surveying: Towards the charges for conducting topographical survey along the Transmission Line to ascertain a corrider width by using Total station (Detailed field survey), If necessary drone can be used with necessary permission if any, including taking of all existing features in the field. The base area of all the towers to be surveyed, Total land area of all the Land owners to be surveyed with the reference of survey stones. Cost of leads, lifts, conveyance, survey tools & plants, hire charges, all labour charges, head loads etc., to be accompanied by the contractor itself. |
| 5 | Sub-Division Work: Towards the charges for marking Transmission Line Corridor, Tower Base in the individual FMB sketches and combined FMB Sketches. Calculation of land areas of Tower base, Transmission Alignment along with Corridor Width and identification of land owners. Sub-division sketches to be formed based on the identified land areas. |
| 6 | Print: Individual FMB, Combined FMB Sketch, Patta, Sub-division FMB, Topo Map - 6 Sets Colour print. |
| 7 | Marking of Village Topo-map: Marking of corridor from the centre point of location to be marked in the village Topo-map by using AutoCAD software by using guidelines of the Survey of India. |
| 8 | Preparation and submission of documents for fixing land value: Preparation and submitting of 8 sets of documents required for arriving land compensation for all survey numbers in Tower locations / Transmission Corridor, including obtaining sales value from Registeration department for fixing the market value of lands for survey numbers and assisting the revenue officials at the collectorate land section as per the guidelines of the revenue department and as per the instruction of engineer in charge. |
| 9 | Clearing Light jungle for carrying out the Stub-setting & stringing work with all lead, lift including cost of T & P, labour etc. complete |
| 10 | Conducting check survey, pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour,all lead, all lift and all head load etc complete. |
| 11 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.In Hard gravelly soil |
| 12 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.In soft distengrated rock not requiring blasting |
| 13 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.In medium rock and dense medium rock not requiring blasting |
| 14 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.In Hard rock requiring blasting |
| 15 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.In Hard rock requiring Wedging and chesiling |
| 16 | Dewatering charges during excavation and concreting with 5HP diesel engine including all charges for fuel, engine oil, pump operator etc., complete. |
| 17 | Providing shoring and shuttering during excavation and concreting works using country wood planks and scantlings including cost of all materials and all albour charges, lead and lift etc., complete as directed by the Engineer incharge at site. |
| 18 | Fixing of stub and cleat with supply of template for GCR tower to site and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template ,labour, fabrication charges etc complete. |
| 19 | Fixing of stub and cleat with supply of template for HCR tower to site and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template ,labour, fabrication charges etc complete. |
| 20 | Fixing of stub and cleat with supply of template for KCR tower to site and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template ,labour, fabrication charges etc complete. |
| 21 | Fixing of stub and cleat with supply of template for QD tower to site and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template ,labour, fabrication charges etc complete. |
| 22 | PCC 1:3:6 using 20 mm metal without form work for tower foundation padding concrete including cost of cement of approved cement and all materials , labour, lead,lift and also below ground level curing , steel formwork charges, consolidation, hire charges for T&P etc complete.as directed by the Engineer at site. |
| 23 | PCC 1:2:4 using 20mm HBG metal for foundation with steel form work for frustum shaped foundation including cost of cement of approved brand including all materials labour etc., complete, labour, lead, curing , steel formwork charges, consolidation, hire charges for T&P etc complete. |
| 24 | RCC 1:1.5:3, using 12 to 20mm HBG metal for foundation , Frustum and chimney concrete with form work for frustum shaped foundation including cost of cement of approved brand including all materials labour, lead,lift curing , consolidation, hire charges for T&P, etc complete.as directed by the Engineer at site.but excluding the cost of steel reinforcement. |
| 25 | RCC 1:1.5:3, using 12 to 20mm HBG metal for retaining wall raft for around the tower including cost of cement of approved brand including all materials labour, lead,lift curing , consolidation, hire charges for T&P, etc complete.as directed by the Engineer at site. but excluding the cost of steel reinforcement. |
| 26 | RCC 1:1.5:3, using 12 to 20mm HBG metal for retaining wall for around the tower including cost of cement of approved brand including all materials labour, lead,lift curing , consolidation, hire charges for T&P, etc complete.as directed by the Engineer at site.but excluding the cost of steel reinforcement. |
| 27 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift,labour, cost of binding wire, etc., complete.As directed by the Engineer at site. |
| 28 | Back filling of tower pits after laying of stub-setting, concreting with excavated earth, watering and consolidation including all labour etc., complete for GCR (Dry tower) |
| 29 | Back filling of tower pits after laying of stub-setting, concreting with excavated earth, watering and consolidation including all labour etc., complete for GCR (wet tower) |
| 30 | Back filling of tower pits after laying of stub-setting, concreting with excavated earth, watering and consolidation including all labour etc., complete for HCR (Dry tower) |
| 31 | Back filling of tower pits after laying of stub-setting, concreting with excavated earth, watering and consolidation including all labour etc., complete for HCR (wet tower) |
| 32 | Back filling of tower pits after laying of stub-setting, concreting with excavated earth, watering and consolidation including all labour etc., complete for KCR (Dry tower) |
| 33 | Back filling of tower pits after laying of stub-setting, concreting with excavated earth, watering and consolidation including all labour etc., complete for KCR (Wet tower) |
| 34 | Back filling of tower pits after laying of stub-setting, concreting with excavated earth, watering and consolidation including all labour etc., complete for QD (wet tower) |
| 35 | Providing Pipe type earthing to towers including all materials G.I pipe 3 m length required length of Earth wire and welded with washer at end connecting with Tower leg and all lead, lift etc., complete.As directed by the Engineer at site. |
| 36 | Removal of excavated earth from the tower location including cost of all materials, lead, lift, labour and Transporting charges etc., complete. |
| 37 | Transportation from source to site and sorting out of tower parts, erection of GI tower angles, fabrication of tower angles (if required) and punching of bolts and nuts immediately after erection of towers, tightening , punching , final checking, providing holes wherever necessary and final checking etc., including cost of materials, T & P,labour, lead, lift, painting of bolts for identification including cost of all labour charges etc., complete. etc complete. as per approved drawing and specification For Double Circuit Towers |
| 38 | Transportation from source to site and sorting out of tower parts, erection of GI tower angles, fabrication of tower angles (if required) and punching of bolts and nuts immediately after erection of towers, tightening , punching , final checking, providing holes wherever necessary and final checking etc., including cost of materials, T & P,labour, lead, lift, painting of bolts for identification including cost of all labour charges etc., complete. etc complete. as per approved drawing and specification For Multi Circuit Towers |
| 39 | PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials, labour, lead, lift, etc complete . |
| 40 | Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials, labour, lead, lift etc complete |
| 41 | Labour charges for cutting, uprooting and removing of large trees from the line including the hire charges for T & P etc. complete |
| 42 | Labour charges for cutting, uprooting and removing of small trees from the line including the hire charges for T & P etc. complete |
| 43 | Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete. |
| 44 | Transporting from source to site and Hoisting of 7 units of single suspension insulators and fixing of SS fittings for Panther with all allied hardwares including all cost of labour,lead, lift, T & P etc complete. |
| 45 | Transporting from source to site and Hoisting of 8 units of single Tension insulators and fixing of SS fittings for Panther with all allied hardwares including all cost of labour,lead, lift, T & P etc complete. |
| 46 | Labour charges for releasing & Re-Stringing of 6 Nos ACSR Panther conductor in between angle point towers with intermediate suspension towers including sorting out of conductor at site, transport charges from all Stores, labour for paving out using rollers fixed on ground without conductor shall not touch the ground during entire operation, rough sagging and single tensioning , final checking as directed by the Engineers incharge concerned with necessary trusstles etc including cost of all materials, labour lead lift t&p including cost of all materials, labour lead lift t&p etc complete. for Kms. For span under LC condition |
| 47 | Labour charges for Stringing of 6 Nos ACSR Panther conductor in between angle point towers with intermediate suspension towers including sorting out of conductor at site, transport charges from all Stores, labour for paving out using rollers fixed on ground without conductor shall not touch the ground during entire operation, rough sagging and single tensioning , final checking as directed by the Engineers incharge concerned with necessary trusstles etc including cost of all materials, labour lead lift t&p including cost of all materials, labour lead lift t&p etc complete. for Kms. For span under LC condition |
| 48 | Labour charges Stringing of 6 Nos ACSR Panther conductor in between angle point towers with intermediate suspension towers including sorting out of conductor at site, transport charges from store labour for paving out using rollers fixed on ground without conductor shall not touch the ground during entire operation, rough sagging and single tensioning , final checking as directed by the Engineers incharge concerned with necessary trusstles etc including cost of all materials, labour lead lift t&p including cost of all materials, labour lead lift t&p etc complete. for Span |
| 49 | Labour charges Stringing of 6 Nos ACSR Panther conductor in between angle point towers with intermediate suspension towers including sorting out of conductor at site, transport charges from store labour for paving out using rollers fixed on ground without conductor shall not touch the ground during entire operation, rough sagging and single tensioning , final checking as directed by the Engineers incharge concerned with necessary trusstles etc including cost of all materials, labour lead lift t&p including cost of all materials, labour lead lift t&p etc complete. for Km |
| 50 | Labour charges for stringing of OPGW wire with fixing of hardware fittings and accessories etc. complete for the line including sorting out of conductor at site, transport charges from store , labour for paving out using rollers fixed on ground without conductor shall not touch the ground during entire operation, rough sagging and single tensioning , final checking as directed by the Engineers incharge concerned with necessary trusstles etc including cost of all materials, labour lead lift t&p clipping providing jumpers, fixing of alu.earth bonds etc with all labour lead lift, testing and commisioning etc complete. (including OPGW - Erection of 48 Fibre with accessories per KM including testing and commissioning) |
| 51 | Labour charges for fixing of number plate, danger board, phase plate etc., complete. |
| 52 | Supply, fabrication and fixing of name board with 18 gauge plate including cost of materials, labour for writing name of the line etc complete |
| 53 | Painting with two coats of anticorrosive paint over tower leg at a height of 45cm including all cost of materials, labour, lead lift etc complete |
| 54 | Providing independent temporary guys for sets of cross arm of each 3 Nos including digging of trench for a size of 6' x 2' x 6', supplying and placing in the digged pit of RSJ/Concrete Block/Wooden log of 50kgs weight,tying the cross arm with the wooden log/RSJ/Concrete with the help of GI earthwire, distance of 1 1/2 x Height of tower, refilling the trench and relaesing after completion of work etc complete. |
| 55 | Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead, lift etc complete |
| 56 | Releasing and lowering & re-hoisting of 7 units of single Suspension insulator with fittings including all labour lead lifts, and T & P etc complete. |
| 57 | Releasing, lowering & re-hoisting of 8 units of single tension insulator with fittings including all labour lead lifts, and T & P etc complete. |
| 58 | Providing special trussels for Road crossing including cost of all materials, labour, lead lift etc. Complete. |
| 59 | Releasing of OPGW cable in the existing line including all labour lead lifts, and T & P etc complete. |
| 60 | Labour charges for dismantling of Existing GI tower Parts and Angles including cost of materials,T & P,labour, lead, lift etc complete. |
| 61 | Fabrication, galvanisation and supply of standard HTS towers part as per department approved drawing/design including stacking of tower parts, transporting of tower parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 and for galvanishing as per IS 2633 and 6745 (Latest code), The governing standards for towers should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arange for inspection of towers at purachase factory at his own cost). |
| 62 | Fabrication, galvanisation and supply of standard MS towers part as per department approved drawing/design including stacking of tower parts, transporting of tower parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 and for galvanishing as per IS 2633 and 6745 (Latest code), The governing standards for towers should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arange for inspection of towers at purachase factory at his own cost). |
| 63 | Supplying, Transportation from source to site , fabrication, galvanising of standard Bolts and nuts of various sizes and various lengths as per department approved drawing including all taxes and duties, lead, lift and head load, freight charges etc., the raw material standard should be as per IS 2633 and 6745 and as per specification as per IS code directed by department engineer at site. |
| 64 | Supply of line materials ACSR Panther conductor as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site. |
| 65 | Supply of line materials OPGW 48 fiber cable as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site. |
| 66 | Supply of line materials 90 KN ordinary disc insulator for Suspension as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site. |
| 67 | Supply of line materials 120 KN ordinary disc insulator for Tension as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site. |
| 68 | Supply, transport and fixing of Single Tension fittings for panther as per IS standard and departmental specifications by the engineer incharge at site. |
| 69 | Supply, transport and fixing of Single Suspension fittings for Panther as per IS standard and departmental specifications by the engineer incharge at site. |
| 70 | Supply, transport and fixing of SB damber for panther as per IS standard and departmental specifications by the engineer incharge at site. |
| 71 | Supply, transport and fixing of PA rod for Panther as per IS standard and departmental specifications by the engineer incharge at site. |
| 72 | Supply, transport and fixing of Mid span joint for Panther as per IS standard and departmental specifications by the engineer incharge at site. |
| 73 | Supply, transport and fixing of Repair sleeve for Panther as per IS standard and departmental specifications by the engineer incharge at site. |
| 74 | Supply,Transport of Number Plate as per IS standard and departmental specifications by the engineer incharge at site. |
| 75 | Supply,Transport of Phase Plate as per IS standard and departmental specifications by the engineer incharge at site. |
| 76 | Supply,Transport of Danger Board as per IS standard and departmental specifications by the engineer incharge at site. |
| 77 | Supply, transport and fixing of PG Clamp as per IS standard and departmental specifications by the engineer incharge at site. |
| 78 | Supply, transport and fixing of 16 mm dia. U Bolt and Nuts/ Hanger rods as per IS standard and departmental specifications by the engineer incharge at site. |
| 79 | Supply,Transport and fixing of D shackle for Panther as per IS standard and departmental specifications by the engineer incharge at site. Please Enable Macros to View BoQ information |
| 80 | Supply,Transport and fixing of D shackle for Panther as per IS standard and departmental specifications by the engineer incharge at site. Please Enable Macros to View BoQ information |