Tender For Miscellaneous Work For Housekeeping Such As False Ceiling & Repairing Of First Aid Stations At 500Mh Pit Bottom & At 8Th Dip Near Assembly Station, Maintenance Of Control Office & Cleaning/Cutting Of Three Settling Pond At Pit Top And Pain, Moonidih-Jharkhand
TDR : 54652786
Tender Notice
BOQ
Expired
Moonidih
Jharkhand
Tender For miscellaneous Work For Housekeeping Such As False Ceiling & Repairing Of First Aid Stations At 500Mh Pit Bottom & At 8Th Dip Near Assembly Station, Maintenance Of Control Office & Cleaning/Cutting Of Three Settling Pond At Pit Top And Pain
Name of Work:- Misc. work for housekeeping such as false ceiling & repairing of first aid stations at 500MH pit bottom & at 8th dip near assembly station, maintenance of control office & cleaning/cutting of three settling pond at pit top and Painting of bypass gallery & conference hall in 500MH pit bottom of Moonidih colliery, W J Area
Sl. No.
Item Description
1
Misc. work for housekeeping such as false ceiling & repairing of first aid stations at 500MH pit bottom & at 8th dip near assembly station, maintenance of control office & cleaning/cutting of three settling pond at pit top and Painting of bypass gallery & conference hall in 500MH pit bottom of Moonidih colliery, W J Area
2
Providing & fixing BWP false ceiling in first aid station in 500MH pit bottom: 9'0\\"'x12'0\\"+2'0\\"x12\\"0\\"=132.00Sq.ft/10.76=12.27m2
3
Providing and fixing precoate GI sheet of pit top control room=10'0\\" x 18'0\\"=180sq.ft/10.76=16.73m2
4
Painting with synthetic enamel paint over new surface of circulars pipes at pit top beside control room:2x(18+10)+(4x10)=96'/3.28=29.27mt Area=22/7x0.04x29.27=3.68m2
5
Painting with synthetic enamel paint in bypass gallery at 500MH pit bottom 2x(12'+20')x8'+2x(6'+12')x10'=872sqft less3x(3.5'x6.5')-2x(3'x6.5')=-107.25sqft=764.75sqft/10.76=71.14m2 + gallery=2x20'x6'=240Sqft/10.76=22.30m2 Total 71.14+22.30=93.44m2
6
Providing and fixing cystern at ppit top control room -1no
7
Cleaning two no settling tank near washary railway siding by cutting silted muk= 1) 20m x 19m x 2.50m=950.00m3 2) 20 x 13m x 2.5m=650.004m3 Total=1600.00m3
8
Cutting soft earth/soil for preparing new settling tank near Shaft no 2= 16m x10m x 2.20=352.0m3
9
Disposal of excaveted mulma/muck Qnty as of Sr. no.6 +7=1600.00+352.00= 1952.00m3m3
10
Dismentalling old & damaged floor (PCC)of first aid Stations at 500MH Pit bottom =4.30*3.20*0.05=0.65=0.65m3
11
Dismentalling old & damaged brick work of sitting platform of first aid Stations at 500MH Pit bottom=4.30*1.00*0.05=2.15m3
12
PCC 1:2:4 in floor(4\\") of first aid Stations at 500MH Pit bottom =4.50*3.10*0.10=1.40m3
13
Brick work 1:4 for platform of first aid stations: 4.20*1.10*0.85=3.93m3
14
Add CP 15% as per clause 4.17.1 of Civil Eng. Manual & BCCL SOR
15
CMPF, Pension and admin. Charge of Employee Un Skilled surface
16
CMPF, Pension and admin. Charge of Employee Un Skilled ug
17
CMPF, Pension and admin. Charge of Employee Skilled Surface
18
CMPF, Pension and admin. Charge of Employee Skilled ug
19
Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.