Tender For Item Rate Boq Boq_Ver3.0 Item Rate Normal Inr Only Inr Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Ce/Nctps-I Nctps-I-Cm Circle - Cm-Ii- Strengthening Of Southern Side Bund Of Secondary Pond At Ash Dyke (Ch.120.00M To, Thiruvallur-Tamil Nadu
TDR : 54648839
Tender Notice
BOQ
16 Days Left
Thiruvallur
Tamil Nadu
Tender For Item Rate Boq Boq_Ver3.0 Item Rate Normal Inr Only Inr Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Ce/Nctps-I Nctps-I-Cm Circle - Cm-Ii- Strengthening Of Southern Side Bund Of Secondary Pond At Ash Dyke (Ch.120.00M To
Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: CE/NCTPS-I NCTPS–I-CM Circle – CM-II- Strengthening of Southern side bund of secondary pond at ash dyke (Ch.120.00m to Ch.224.00m). Contract No: CE/SE/CM/NCTPS-I/ 180/2025-26 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Scope of Work Item Code / Make Quantity Units HSN / SAC CODE Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE for Work portion in figures to be entered by the Bidder Rs. P BASIC RATE for Labour charges of Erection portion Rs. P BASIC RATE for consumables charges of erection portion Rs. P Packing & Forwarding Charges in percentage Freight & Insurance charges in precentage GST in percentage IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
2
NCTPS–I-CM Circle – CM-II- Strengthening of Southern side bund of secondary pond at ash dyke (Ch.120.00m to Ch.224.00m).
3
Excavation and transporting of excess earth/silt available at the ash dyke and depositing and leveling on the upstream side slopes of secondary pond and compacting to achieve the desired density including cost of all materials, labour charges, T&P etc., complete and as directed by the departmental Engineer at site. (Earth/silt will be supplied by TANGEDCO at free of cost from Ash dyke).
4
Providing, laying and fixing of RTS rod including cost of Material, transporting, cutting, bending, placing in position, tools and plants etc complete as directed by the Engineer at site.
5
Providing RCC 1:2:4 using 6mm to 12mm HBG broken stone for southern side slope of bund in the secondary pond at Ash dyke including cost of all materials, lead, lift, shuttering charges, curing charges etc., complete as directed by the Engineer at site (Excluding cost of reinforcement). Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.