| 1 | (A) Erection of Pipe Pole 8 Meter |
| 2 | Drawing of Rabbit Conductor ( 2240 Mtrs) |
| 3 | Supply & Erection of Stay Set. |
| 4 | Supply & Erection of Shackle Insulator |
| 5 | Supply & Erection of Cradle Guard |
| 6 | Fabrication and Erection of iron material. |
| 7 | Supply & Erection of Nut and Bolt |
| 8 | Fabrication and Erection of M.S. Clamp |
| 9 | Dismantling of Pipe Pole 8 Meter |
| 10 | Dismantling of Rabbit Conductor |
| 11 | Dismantling of of iron material. |
| 12 | Tree Branch Cutting |
| 13 | Transporting of Pole |
| 14 | (B) Dismantling of Rail Pipe Pole 12 Meter |
| 15 | Dismantling of Dog Conductor |
| 16 | Dismantling of Iron material. |
| 17 | Dismantling of Disc and Pin Insulator |
| 18 | Erection of Rail /Pipe Pole 12 Meter |
| 19 | Drawing of Dog Conductor ( 3150 Mtrs) |
| 20 | Fabrication and Erection of iron material. |
| 21 | Supply & Erection of Disc Insulator |
| 22 | Supply & Erection of Pin Insulator |
| 23 | Supply & Erection of Stay Set. |
| 24 | Supply & Erection of Nut and Bolts |
| 25 | Supply & Erection of Chemical Earth Pit |
| 26 | Supply & Erection of A.B. Switch |
| 27 | Dismantling of Cable 120 Sq.mm |
| 28 | Laying of Cable 120 Sq.mm |
| 29 | Tree Branch Cutting |
| 30 | Transporting of Pole |
| 31 | Supply and Fitting of G.I. Strip 25 X 5 mm for Connection Transformer and Switches |
| 32 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |