| 1 | Servicing of Fire Pumps(Main Pump,Jockey Pump& Diesel Pump)including Dismantling if required,checking,bearings,seals,lubrication,alignment,pressure settings,suction& delivery lines,and operational testing to ensure readiness as per IS standards as per Direction of Engineer-in-charge. |
| 2 | Cleaning,Flushing & Testing of Yard Hydrants and Landing valves including removal of rust,dirt,scale,checking spindle operation,washers,caps,leakage testing and ensuring smooth operation under working pressure.as per Direction of Engineer-in-charge. |
| 3 | Servicing of Hose Reels,Canvas Hoses & Nozzles including cleaning,coupling checks ,rubber washer replacement if required,pressure testing,rewinding,lubrication of moving parts and ensuring operational readinessas per Direction of Engineer-in-charge. |
| 4 | Refilling, Testing & certification of Fire Extinguishers(ABC/CO2/Water type as applicable)including hydrostatic testing (if necessary),refilling with approved extinguishing media,replacement of seals,safety pins,hose pipes and pressure testing as per Direction of Engineer-in-charge. |
| 5 | Pressure Testing of Fire Fighting Pipeline NetworkIncluding isolation of system, filling, pressurization, leak detection, rectification support and recording of test results as per applicable IS codes as per Direction of Engineer-in-charge |
| 6 | Trial Run, Testing & Re-Commissioning of Complete Fire Fighting SystemIncluding synchronized operation of pumps, hydrants, hose reels, pressure switches and demonstration of system performance to client authority as per Direction of Engineer-in-charge. |
| 7 | Supply & Installation of ISI Marked Landing Valves (63 mm)Including fixing, threading, gasket replacement, pressure testing and ensuring leak-proof operation complete in all respects as per Direction of Engineer-in-charge |
| 8 | Supply of Canvas Fire Hoses (63 mm dia)With male & female instantaneous couplings, conforming to IS 636 Type-A, complete with pressure testing and commissioning as per Direction of Engineer-in-charge |
| 9 | Supply & Installation of Fire Bucket Stand with Buckets (Minimum 4 buckets per stand) fabricated from MS, painted red, including fixing at designated locations as per Direction of Engineer-in-charge |
| 10 | Checking, Maintenance & Reactivation of Control Panels Including electrical connections, auto/manual changeover logic, indication lamps, alarms, relays and functional testing of pump automation system as per Direction of Engineer-in-charge. |
| 11 | Repairing of Existing Hose BoxesIncluding dent removal, hinge repair, locking arrangement, repainting with fire-red enamel paint, replacement of glass/acrylic sheets where required as per Direction of Engineer-in-charge. |
| 12 | Supply, Installation, Testing & Commissioning (SITC) of 150 mm Foot ValvesIncluding dismantling old valves if any, installation with strainer, alignment and operational testing as per Direction of Engineer-in-charge |
| 13 | Maintenance / New Welding of Hydrant PipelineIncluding cutting, edge preparation, welding of MS pipes, leak arresting, repainting with anti-corrosive paint and pressure testing of repaired sections as per Direction of Engineer-in-charge Please Enable Macros to View BoQ information |