|
| 1 | Excavtion in soil using Hydraulic Excavator and Toppers with disposal upto 1000m Excavtion for roadwork in soil with hydraculic excavator of 0.9 cum bucket capacity inculiding cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and trasporting to the embankment location with a lift upto 1.5m amd lead upto 1000m as per technical Specifcation clause 302.3 |
| 2 | Construction of embankment with approved materials obtained from roadway CuttingConstruction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 |
| 3 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site. spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1 (3.14) |
| 4 | Granular Sub-Base with Coarse Graded Material (Table:- 400.1) Construction of granular sub-base by providing coarse graded material, spreading in uniform layers on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. |
| 5 | Providing, laying, spreading and compacting stone aggregates of specific sizes to Water Bound Macadam (45-63) specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled 80-100 kN static roller in stages to proper grade and Camber MORD Specification 405.2 |
| 6 | WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. |
| 7 | Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 |
| 8 | Providing and applying tack coat with bitumen (VG-10) using Bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared granular surfaces treated cleaned by air compressor as per Technical Specification Clause 503 |
| 9 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates and using (VG-10) bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical specification clauses 508. |
| 10 | Providing, laying seal coat by means with VG-10 Bitumen sealing the void in a bituminous surface laid to the specified levels grade cross fall usingType C as per Technical specification clauses 510. |
| 11 | Part-AMaintainance Charge including @ All Items total work amount etc as per Direction of E/I for the period of Five Years from the actual completion of work. (Total Amount for PC Work Sl No. 1 to 10 =6207506.00) |
| 12 | Maintainance of First Year(@ 0.00% of Total Work Amount of item 1 to 10) |
| 13 | Maintainance of Second Year (@ 0.75% of Total Work Amount of item 1 to 10) |
| 14 | Maintainance of Third Year (@ 1.50% of Total Work Amount of item 1 to 10) |
| 15 | Maintainance of Fourth Year (@ 2.25% of Total Work Amount of item 1 to 10) |
| 16 | Maintainance of Fourth Year (@ 1% of Total Work Amount of item 1 to 10) Note - 1- Rates are inclusive of all taxes but excluding GST which shall be paid extra as applicable 2- Labour cess @ 1% will be deducted from contractor's bill at the time of payment 3- Maintenance will be calculated on value of actual work done. Please Enable Macros to View BoQ information |