| 1 | CONSTRUCTION CROSS REGULATOR |
| 2 | Earth work in excavation of foundation including cost digging & refilling the trenches with its proper disposal.as directed by Engineer-in-charge. |
| 3 | Earth work in making coffer dam by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. |
| 4 | Earth work in making canal section including cost of all lead lift material labour T&P etc.as directed by Engineer-in-charge. |
| 5 | Laying C.C. (M-10) below foundation including cost of all lead lift material, labour T&P etc.as directed by Engineer-in-charge. |
| 6 | Laying C.C. 1:2:4 (M-15) in wing wall with crushed stone grit size 20-40 mm and chopan coarse sand and including cost of all lead lift material, labour T&P etc.as directed by Engineer-in-charge. |
| 7 | Laying R C.C. 1:1.5:3(M-20) in below parapet wing with crushed stone grit size 4.75- 20 mm and chopan coarse sand and including cost of all lead lift material, labour T&P etc.as directed by Engineer-in-charge. |
| 8 | Centering & shuttering including cost of all complete.as directed by Engineer-in-charge. |
| 9 | Laying C.C. 1:1:2 (M-25) in raft, abt, Pier including cost of all lead lift material, labour T&P etc.as directed by Engineer-in-charge. |
| 10 | Brick Work in 1:3 C:M in parapet, with coarse sand &cement including cost of all lead lift material, labour T&P etc.as directed by Engineer-in-charge. |
| 11 | Providing and fixing in position 12 mm thick bitumen impregnated fiber board conforming to IS: 1838, including cost of primer, sealing compound Grade-A in expansion joints.as directed by Engineer-in-charge. |
| 12 | S/L 40-60 Kg boulder for pitching including cost of all lead, lift, material, labour, T&P etc.as directed by Engineer-in-charge. |
| 13 | S/L Filter media corse sand including cost of all lead lift material labour T&P etc.as directed by Engineer-in-charge. |
| 14 | S/L Filter m edia Crushed stone 10mm to 20mm including cost of all lead lift material labour T&P etc.as directed by Engineer-in-charge. |
| 15 | S/L Filter m edia Crushed stone 20mm to 40mm including cost of all lead lift material labour T&P etc.as directed by Engineer-in-charge. |
| 16 | Supplying & driving Z type Sheet pile including cost of all lead lift material labour T&P etc. as directed by Engineer-in-charge. |
| 17 | Dewatering including cost of all Pumps lead lift material labour T&P etc |
| 18 | laying PVC seal including cost of all lead lift material labour T&P etc.as directed by Engineer-in-charge. |
| 19 | Cutting bending and binding of steel bar for reinforcement including cost of lead and lift etc.as directed by Engineer-in-charge. |
| 20 | Cement Pointing 1:2 CM as directed by Engineer-in-charge. Please Enable Macros to View BoQ information |