|
| 1 | Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually/by machanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge: In cement mortar |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 3 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - |
| 6 | -All work upto plinth level: |
| 7 | 1:4:8 ( 1 Cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 8 | 1:2:4 ( 1 Cement: 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) |
| 9 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. Thermo-Mechanically Treated bars |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete. |
| 11 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level :. 1:1.5:3 (1 cement: 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 12 | 62 mm thick cement concrete flooring with concrete hardener topping under layer 50 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) and top layer 12mm thick cement hardener consisting of mix 1:2(1 cement hardener mix : 2 graded stone aggregate 6mm nominal size) by volume. Hardening compound is mixed @ 2 litre per 50kg of cement or as per manufactures specifications. This includes cost of cement slurry,but excluding the cost of nosing of steps etc. complete. |
| 13 | 12 mm cement plaster of mix: 1:4 (1 cement : 4 fine sand) |
| 14 | Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5 sq. metres and under including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to thedumping ground within 50 metres lead : With cement mortar 1:4 (1 cement: 4 fine sand) |
| 15 | Providing and applying white cement based putty of average thickness 1mm,of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. |
| 16 | Finishing walls with Deluxe Multi surface paint system for interiors and exteriors using Primer as permanufacturers specifications : Two or more coats applied @ 1.25 ltr/10 sqm. over and including one coat of Special primer applied @0.75 ltr/10 sqm. |
| 17 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture. Please Enable Macros to View BoQ information |