| 1 | Earth work excavation in all type of soil and depositing on bank with in a lead of 50m and lift of 1.5m including back filling. Rate is inclusive of demolishing bituminous surface/ concrete/ rubble/ soling stone etc if any as directed by Engineer-in-charge. |
| 2 | Providing and laying in position cement concrete of grade 1:4:8 using 40mm nominal size stone aggregate including cost and conveyance of all materials, cost of cement , labour for mixing, laying, consolidating curing, formwork etc. complete |
| 3 | Fabrication of reinforcement for RCC work including cost and conveyance of all materials, labour for, uncoiling, straightening, cutting,bending,laying & tying with 22G binding wire etc.complete including cost of steel (mild steel or tor steel) and cost of binding wire |
| 4 | Providing and laying reinforced cement concrete 1:2:4 using 20mm downgraded broken granite metal in ground floor upto 5m height including cost of cement, cost and conveyance of all materials, labour for mixing, laying, consolidating, curing, cost of dewatering,formwork etc. complete but excluding cost of reinforcement. |
| 5 | Fabrication of all types of structural steel works by straightening,cutting & welding using all types of steel sections plates,flats, angles, of any size and weight as per approved drawing or as instructed,erecting in position to line and level by welding/bolting embedding in concrete including painting with one coat of Zinc chromate primer ,hire charges for toolsand plants,cost of electrodes,other incidentalsetc. complete all as directed by the Engineer-incharge. |
| 6 | Supplying, fabricating and erecting of mild steel tubular (round, square and rectangular hollow tubes) of any size and weight by straightening, cutting and welding usingas per approved drawing or as instructed, erecting in position to line and level by welding/bolting embedding in concrete including applying one coat of zinc chromate primer & two coats synthetic enamel paint, hire charges for tools and plants, cost of electrodes, wastage, other incidentals etc. complete all as directed by the Engineer-in- charge. |
| 7 | Providing, supplying & installation of roofing sheet of 0.5mm thickGalvalume sheet prepainted with AZ coating of 150GSM with an overlap of 150mm at ends & two corrugation /manufacturers directions at sides fixing with self tapping screws through out the purlin, at the overlapping & at the intermediate crust with sealing washers, including ridge plain (600mm) and cost & conveyance of all materials labour etc.(Finished area of roof sheet before laying ridges/valleys/crimped sheets will only be measured and considered for payment. Overlaps will not be measured) Please Enable Macros to View BoQ information |