| 1 | Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary). (Payment to be made on area cleared) |
| 2 | Dismantling all types of plain cement concreteworks, stacking serviceable materials at site andremoving rubbish as directed within a lead of 75m.In ground floor including roof.(a) upto 150 mm. thick |
| 3 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm. |
| 4 | Filling in foundation or plinth by Fine sand in layers not exceeding 150 mm. as directed and consolidating same by thorough saturation with water ramming complete, including the cost of supply of sand. (Payment to be made on measurement of finished quantity)(B) Do - by fine sand |
| 5 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand . |
| 6 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.a) Pakur Variety |
| 7 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel (JSW/JSPL/SHYAM/SRMB/BMASL/ELECTROSTEEL/SSL) |
| 8 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety |
| 9 | Brick work with 1st class bricks in cement mortar (1:6) (a) In Super Structure |
| 10 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (In ground floor)(f) 25 mm to 30 mm shuttering without staging in foundation .(Build/Page-42 Item No-36/f) |
| 11 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface(i) With 1:6 cement mortar(b) 20 mm thick plaster G.F |
| 12 | Neat cement punning about 1.5mm thick in all,dado,windowsill,floor etc.NOTE:Cement 0.152 cu.m per100 sq.m. |
| 13 | (a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. |
| 14 | A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(a) On steel or other metal surface :With super gloss (hi-gloss) -, (iv) Two coats (with any shade except white) |
| 15 | M.S. gate of Jail type as per approved design made of strong M.S.frame work, intermediate stiffeners and round / square bars orangles. M.S. sheet (not less than 14 gauge) gussets, cleats etc.including necessary riveting, bolting, welding, locking and hangingarrangements, fitting and fixing complete as per direction of theEngineer-in -charge. |
| 16 | M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 1ST floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof.II) For Structural Works in Roof Trusses etc. using joists, channelsand angles of specified section weighing less than 22.5 kg/ m(Build/Page-99 & 100 Item No-1) (3rd Corrigenda) |
| 17 | Supplying, fitting & fixing Zn-Al alloy (55% Al & 45% Zn) coating of 150 grams per sq. metre (followed by colour coated on both side) steel sheet work having minimum yield strength of 550 Mpa of trapizoidal profile of approved make (excluding the supporting frame work) fitted and fixed with 55 mm & 25 mm self tapping screw, EPDM Washer 16 mm dia & 3 mm th. washer etc. complete with 150 mm end lap and one corrugation minimum side lap. (Payment to be made on area of finished work).(i) In Roof:- a) With 0.5 mm thick sheet |
| 18 | Supplying, fitting, fixing bolts with nuts, washer:(ii) 20 to 25 mm dia bolt:(c) Length above 150mm(Build/Page-103 Item No-7) |
| 19 | Holding down bolt with nut including 100 x 100 x 6 mm plate washer at bottom fitted complete and packing the hole with cement concrete or cement grout as directed.(ii) 20 mm dia bolt.(a) 300 mm long(Build/Page-102 Item No-6) |
| 20 | Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992(A) (i) Single Socketed 3 Meter Length(a) 75 mm |
| 21 | (ii) Double Socketed 3 Meter Length, (b) 110 mm |
| 22 | Cross Tee with Door(b) 110 mm |
| 23 | plain Tee (b) 110 mm |
| 24 | Door Tee (b) 110 mm |
| 25 | plain Y (b) 110 mm |
| 26 | Vent cowl 110 mm dia |
| 27 | Door Bend (T.S.) (b) 110 mm |
| 28 | pipe Clip (b) 110 mm |
| 29 | GST 18% |
| 30 | Cess 1% Please Enable Macros to View BoQ information |