| 1 | Safe loading Carriage including unloading and proper stacking of following materials from central store Barabanki / JE Store to site of work. |
| 2 | PCC Pole 8.5 Mtr long |
| 3 | PCC Pole 11 Mtr long |
| 4 | 33/11kv Pin Insulator . |
| 5 | 33/11kv Disc Insulator . |
| 6 | 33/11kv X-ARM |
| 7 | MS Earthing Rod |
| 8 | Transformer 25/63/100 KVA |
| 9 | Transformer 250 KVA |
| 10 | ABC Cable 3x50SQ. MM. |
| 11 | ABC Cable 3x95 SQ. MM. |
| 12 | ABC Cable 3x120 SQ. MM. |
| 13 | ABC Cable 1x25+1x16 SQ. MM. |
| 14 | 33/11 KV XLPE Cable 3x70++3x120+3x185,3x300 sqmm |
| 15 | ACSR Weasal Conductor/dog /rabit |
| 16 | LT D.B. Box |
| 17 | 11 KV CT/PT Unit |
| 18 | 11 KV Metering Cubical/pilfer |
| 19 | Stay Set Complete |
| 20 | Other Line Material |
| 21 | Dragging of pole from JE Dump Store to site |
| 22 | Erection of Stay set of 16x1800 mm rod duly painted with red oxide,anchor plate, and stay insulate etc. |
| 23 | Stringing and sagging of 11 KV line with ACSR Weasal/dog/rabit Conductor including nuzzling binding and jumpering (weasal conductor will be provided by the department) |
| 24 | Pipe Earthing ( Boring type 40 Feet) |
| 25 | Installation of Mounting of Following capacity of Transformer including its connection between 11 KV and LT Line mounting provinding Crimping type Aluminium lugs of required size.( All the material except transformer will be arranged by the contractor) |
| 26 | Mounting of 25/63/100 KVA Tranformer |
| 27 | Mounting of 250 KVA Tranformer |
| 28 | Installation of fixing 11 KV CT/PT with required meterial. |
| 29 | Installation of fixing 11 KV Pilfer Unit with required meterial. |
| 30 | Errection of Substation type double pole with PCC /STP 8.5/11/13 Pole Mtr. Long . including mounting of Top Channal Dropper Channel, base angle with clamps with nut & bolt, fitting of 33/11 KV pin & Pin insulator. |
| 31 | Errection of Substation type four pole with PCC /STP 8.5/11/13 Pole Mtr. Long . including mounting of Top Channal Dropper Channel, base angle with clamps with nut & bolt, fitting of 33/11 KV pin & Pin insulator. |
| 32 | Errection of single PCC /ST Pole for Stringing, jumpharing and sagging of conductor 1/6 of total length of poles |
| 33 | Stringing and Sagging of LT 1x16 ABC Cable (LT ABC Cable will be provided by the department) |
| 34 | Stringing and Sagging of LT 3x50 ABC Cable (LT ABC Cable will be provided by the department) |
| 35 | Stringing and Sagging of LT 3x95ABC Cable (LT ABC Cable will be provided by the department) |
| 36 | Stringing and Sagging of LT 3x120ABC Cable (LT ABC Cable will be provided by the department) |
| 37 | Installation of D.B. Box |
| 38 | Earthing of pole with MS Earthing. |
| 39 | Provinding & Fixing of various type materials. All materials shall be supplied by the contractor. |
| 40 | Nut & Bolt |
| 41 | PG CLAMP |
| 42 | Clamp for Top/ Dropper and T-off2/Stay/LT clamp /F-clamp GI PIPE CLAMP etc. |
| 43 | GI Pipe 3\\"&4'' DIA |
| 44 | D.O fuse set |
| 45 | basing angle |
| 46 | L T Insulator |
| 47 | Looping and Choopping of tree branches in laying on the route of line. |
| 48 | Laying of 11kv XLPE Cable 3x70, 120,185 Sq. By MM Manually |
| 49 | 11 KV XLPE Cable 3x70++3x120 hanging with pole |
| 50 | felling and heat treatment of cable box |
| 51 | Concreating and pilinthing of ST& PCC Pole 18x24 CM. |
| 52 | Wairmesh fencing of 11/.04 kv substation shall be made recatangular off size as per site requirment fabrication 45x45x5mm angle .. (All the material will be arranged by the contractor) |
| 53 | Construction of massionry type transformer plinth of sutable size. (All the material will be arranged by the contractor at his own cost). |
| 54 | Construction of LT Distribution Cum LT Protection Box in Rectangle Shape made of MS Angle For Installation of Henley Type Tailness Fuse Unit 300/500 AMP 650 Volt 3 nos Outgoing Circuits With 4 Nos.Bus Bar Proper Grouting of Structure by digging of pits with the help of cement, coresand and aggregate in the ratio 1:3:6 and fabrication of structure complete. |
| 55 | Fabricate with hole suitable size in steel items, receive from central store light as top channel/dropper channel sub station base angle etc. |
| 56 | Looping of cable and mounting of pole. |
| 57 | hiting and felling cable box |
| 58 | Gaurding of 11 KV Line |
| 59 | Dismentaling of 11 KV Line & poll |
| 60 | Other line work Please Enable Macros to View BoQ information |