| Sl. No. | Item Description |
| 1 | Removing grass, gazer grass and disposing off out of building premises including making clean the ground by shovel and phavaras etc. complete. |
| 2 | Gently cleaning the surface of stone masonary with specialised water misting technique employing air water jet using a fine nossle sprinkling system calibrated to sprey fine mist along the stone surface without over wetting followed up by gentle brushing with soft nylon brushes and removing dirt, dist ,bird dropping,grease,oil,algae ,fungus ,monkey beats,vegetable growth, etc as specified.gentle surface cleaning using water misting and mild pH balanced surfactants as specified for indicated areas to remove the surface dirt,grit accretion by means of water misting and cleaning etc.complete as directed by engineer in charge |
| 3 | Specialised Stone cleaning to remove oil or emulsion paint,stains or dark patches,layers of impervious coatings,cementious layers,rust stains from surface of stone with chemicals ,thinners,solvents or soft teepol type soap solution or by pressure jet machine (As specified by consulting architect),A gentle use of air abrasive tools may be permitted as long as no damage to the original surface is ensured.it may include usage of mechanical tapping ,chemical surfactant or solvant,patent cleaning product or use of pressurised micro abrasive as necessary.test patches would need to be undertaken to asses efficeincy of technique prior to work.Removal to be followed by water washing.The surface shall finally be cleaned by hand rubbing and rinsing with clean water to obtain nearly original surface,colour and texture |
| 4 | Removing pointing and other epoxy-based hard material from joints and surface area of Basalt stone masonary manually with chisel and hammer or with the help of electric grinders wherever directed by Engineer In charge. Proper care should be taken not to damage the stone during removal. |
| 5 | Removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete |
| 6 | Dismantling brick masonry in lime or cement mortar and stacking the materils as directed with all leads, lifts etc |
| 7 | Dismantling the R.C.C. Work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed etc. complete |
| 8 | Dismantling stone masonry in lime or cement mortar including stacking the materils as directed with all leads, lifts etc. |
| 9 | Removing lime or lean cement concrete including stacking the spoils as directed with all leads, lifts etc, complete |
| 10 | Removing doors and windows with frames and stacking thematerials as directed with all leads, lifts etc. complete.complete. |
| 11 | Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works. |
| 12 | Providing and fixing Jute Kantan (Tarat) screen to the scaffolding for external guniting as directed including removing the same after the work is over etc. complete |
| 13 | Numbering the monument elements in proper order before lowering down with approved colour and shade as directed by Engineer in-charge, including ladder, scaffolding etc.complete. |
| 14 | Lowering down carefully existing stone masonry of the monument manually in proper order including shifting the stone elements up to a distance of 50 meter beyond the monument area and stacking them as directed by Engineer in-charge, removing building rubbish and cleaning the site etc. complete. |
| 15 | Providing Lime Pointing to stone work in lime mortar 1:1 in superstructure, as per detailed specifications and drawings or as directed including all face or visible work shall be pointed, unless otherwise specified and shall be done while the mortar is fresh, the mortar shall consists of lime and fine sand shall not be ground fine but sand should be finer, the joints of the pointed work shall be neatly defined by the pointing, the lines shall be regular and uniform in breadth and the joints shall be raised or flat as may directed, preparing the lime mortar with 640 gram pulp of wood apple (Belfruit) per cubic metre of lime mortar as a bonding material, watering and all work when handed over to be perfectly clean and free from all mortar stains etc. complete |
| 16 | Providing and grouting with lime and fine screened sand slurry in proporation of (1 : 1) with a proper jet pump pressure including cleaning and washing and packing the existing crack / holes in the brick or stone masnory with lime and finesand paste in proporation of (1:1) properly from down side, filling the slurry in cracks or holes including all necessary actions and required tools and machineries, scaffolding, curing etc. complete. for soil stabilization |
| 17 | Excavation for DEBRIES REMOVAL / ARCHAEOLOGICAL SCIENTIFIC CLEARANCE in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 0.00 to 1.50 m.) By Manual Means |
| 18 | Excavation for foundation in earth, soils of all types sand, gravel and soft murum,Including removing the excavated matreial upto a distance of 50 M beyond the building area stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling ,ramming, watering Including shoring and strutting etc.complete (Lift upto 1.50m ) |
| 19 | Excavation for foundation in earth, soils of all types sand, gravel and soft murum,Including removing the excavated matreial upto a distance of 50 M beyond the building area stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling ,ramming, watering Including shoring and strutting etc.complete ( Lift upto 1.50m to 3.0m ) |
| 20 | Filling in plinth and floors with contractors material/brought from outside and approved by Engineer in charge in layers of 15 cm to 20 cm including watering and compaction etc. complete. |
| 21 | Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete. |
| 22 | Providing and laying cast in situ 1:2:4 Lime Concrete of Trap stone metal for foundation and bedding as per detailed specifications and drawings or as directed including centring, formwork, laying/pumping, compacting, preparing the lime mortar in lime miller and then mixing with coursed aggregate in drum mixer, bailing out water, watering etc. complete |
| 23 | Providing Un-coursed Rubble Masonry of trap / granite stones in lime mortar 1:1½, in foundation and plinth as per detailed specifications and drawings or as directed including the stones to be set in the work as received from the quarry, after merely knocking off weak corners and edges with the masons hammer, the stones shall be carefully laid so as to break joints, no joint shall exceed 12.5 mm. (½″) in thickness, every stone shall be set flush in mortar, the face stone shall be for greater size, and good beds, one through stone shall be inserted at least every 0.80 sq. mete (1 square yard), the joints shall be racked out carefully at least 25 mm. (1″) where pointing or plastering to be done, striking joints where no pointing or plastering is to be done, preparing the lime mortar in lime miller, bailing out water, watering and all exposed masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete |
| 24 | Providing and fixing Random Stone Paving, Second Sort in lime mortar 1:1, with size of stone 0.45 m. x 0.60 m. x 0.15 m., as per detailed specifications and drawings or as directed including all stone slabs to of approved quality, hard, even, sound, durable and uniform thickness, the stones to be very finely chisel-dressed on the surface and the course to be of prescribed width, the joints running true, the stones to be laid with joints not exceeding 6 mm. (¼″) thick and to be evenly and firmly bedded flush in mortar on the concrete and no hollow left, side to be dressed true and as per shape at least half the depth from the face, preparing the lime mortar in lime miller, watering and all paving work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 25 | Providing and fixing Stone Paving, First Sort in lime mortar 1:1, with size of stone 0.90 m. x 0.60 m. x 0.2125m., as per detailed specifications and drawings or as directed including all stone slabs to of approved quality, hard, even, sound, durable and uniform thickness, the stones to be very finely chisel-dressed on the surface and the course to be of prescribed width, the joints running true, the stones to be laid with joints not exceeding 6 mm. (¼″) thick and to be evenly and firmly bedded flush in mortar on the concrete and no hollow left, side to be dressed true and as per shape at least half the depth from the face, preparing the lime mortar in lime miller, watering and all paving work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 26 | Re-setting Ashlar Fine Masonry of reuse-stones in lime mortar 1:1 in superstructure as per detailed specifications and drawings or as directed including the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course, the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 27 | Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with size of stone 0.60 m. x 0.45 m. x 0.23 m. in superstructure as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 28 | Providing coursed rubble masonry first sort of trap / granite / quartzite / gneiss stones in cement mortar 1:6 in superstructure including racking out joints on the inside when plastering is to be done, watering and scaffolding etc. complete. |
| 29 | Providing Ashlar Fine Stone Steps of trap / granite stones in lime mortar 1:1with size of stone 0.6m. x 0.400 m. x 0.220 m. as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, the stones shall be of exact size and shape, the shall be fine dressed on exposed surface, holes for balusters should be cut in the steps before they are laid, each stone shall rest at least 3.8 cm. (1½″) on that below it, the beds or joints being in no case more than 3 mm. (⅛″), preparing the lime mortar in lime miller, watering and all steps work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 30 | Providing and fixing mild steel grill work for windows, ventilators etc. 20 Kilogram/ One Square Metre as per drawing including fixtures, necessary welding and painting with one coats of anticorrosive paint and two coats of oil painting complete. |
| 31 | Providing Ashlar Fine Masonry of trap / granite stones for TADKHADA (BASESTONE) in lime mortar 1:1 with average size of stone 0.60 m. x 0.60 m. x 0.60 m. in superstructure as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete For Stone curved shape chajja for Temple. |
| 32 | Providing Ashlar Fine Masonry of trap / granite stones for Columns in lime mortar 1:1 with average size of stone 0.6 m. x 0.6 m. x 2.70 m in superstructure as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete For Stone curved shape chajja for Temple. NON SSR 11 |
| 33 | Providing Ashlar Fine Masonry of trap / granite stones for Beams/Ganesh Patti/Lintel/Chandrashila/Ardha-Chandrashila in lime mortar 1:1 with average size of stone 0.50 m. x 0.50 m. x 2.70 m. in superstructure as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete For Stone curved shape chajja for Temple. |
| 34 | Providing Ashlar Fine Masonry of trap / granite stones for CIRCULAR BRACKET in lime mortar 1:1 with average size of stone 0.70m. x 0.70 m. x 0.30 m. in superstructure as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete For Stone curved shape chajja for Temple. |
| 35 | Providing Ashlar Fine Masonry of trap / granite stones for FOURWAY BRACKET/RECTANGULAR BRACKET in lime mortar 1:1 with average size of stone 0.7m. x 0.70 m. x 0.30 m. in superstructure as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete For Stone curved shape chajja for Temple. NON SSR 11 |
| 36 | Providing Ashlar Fine Masonry of trap / granite stones for KARNSHILA CAP,KARNSHILA STONES in lime mortar 1:1 with average size of stone 1.85m. x 0.90m. x 0.30 m. in superstructure as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete For Stone curved shape chajja for Temple. |
| 37 | Providing Ashlar Fine Masonry of trap / granite stones for Cap Stone in lime mortar 1:1 with average size of stone 0.6m. x 0.60 m. x 0.508 m. in superstructure as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete For Stone curved shape chajja for Temple. |
| 38 | Providing Ashlar Fine Masonry of trap / granite stones for CHAJJA STONES in lime mortar 1:1 with average size of stone 0.90 m. x 0.60m. x 0.22 m. in superstructure as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete For Stone curved shape chajja for Temple. |
| 39 | Providing Ashlar Fine Masonry of trap / granite stones for KAKSHASHAN in lime mortar 1:1 with average size of stone1.85m. x 0.90m. x 0.30 m. in superstructure as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete For Stone curved shape chajja for Temple. |
| 40 | Providing Ashlar Fine Masonry of trap / granite stones for GALTHA in lime mortar 1:1 with average size of stone 0.70m. x 0.70m. x 0.30 m. in superstructure as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete For Stone curved shape chajja for Temple. NON SSR 11 |
| 41 | Providing Brick Masonry First Class in superstructure with size of brick 9″ x 9″ x 3″ in lime mortar 1:1½, as per detailed specifications and drawings or as directed including the bricks to be of uniform size, moulded ground, thoroughly well burnt and sound, ringing clearly when stuck with trowel, the bricks to be soaked in water for 12 hours before used, the bricks are to be laid flush in mortar in such bond as directed, as far as possible, bricks of uniform colour are to be selected for theface work when it is not to be plastered, the joints are not to exceed 12.5 mm. (½″), no bats or half brick to be used in the work, racking out joints where pointing or plastering to be done, striking joints where no pointing or plastering is to be done, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 42 | Providing Brick Arching First Class with Ornamental Work of bricks of size 9″ x 9″ x 3″ in lime mortar 1:1½ as per detailed specifications and drawings or as directed including the bricks to be of uniform size, thoroughly well burnt and sound, ringing clearly when stuck with trowel, the bricks to be soaked in water for 12 hours before used, the bricks to be laid in concentric half-brick ring, the joints are to be properly summered and not to exceed 17 mm. (⅔″) in thickness, the joints to be truly radial to the curve at all points, great care to be taken that the rings are bonded together properly,whenever the joints of any of the rings come to a summering or plane face, all arches to be turned on centrings, preparing the lime mortar in lime miller, cantering/scaffolding, watering and all arch work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 43 | Providing 12 mm. thick Rough Cast Lime Plaster and 10 mm thick in double coat in lime mortar 1:1/2 and 1:1(22 mm) lime putty fine coat on last layer in plinth, as per detailed specifications and drawings or as directed including all joints in masonry and brick work are to be racked out to a depth of at least 20 mm. and the wall to be washed with fresh water and thoroughly wetted for six hours before plastering, the plaster to be applied in an even and uniform coat well pressed in to the joints and to be well beaten for 1½ days with hand tappers, the plaster should also be well sprinkle during the proses of beating with a mixture of 1.10 jaggary and 640 gram pulp of wood apple (Belfruit) in 90 to 135 litre of water, the plaster being wetted occasionally with fresh water while the beating is in progress, all exposed angles and junctions with door frame to be carefully finished, all mouldings shall be worked true to template and drawn neat, clean and level, soffits of arches must true arch of circle, preparing the lime mortar in lime miller with 1.60 kg Gugal (a kind of fragrant gum) and 960 gram chopped hemp (fibre of bhendi or tag ) per cubic metre of lime mortar as a bonding material, of lime as a bonding material, watering and all work when handed over to be perfectly clean and free from all mortar stains etc. complete |
| 44 | Stucco work in lime, surkhi and sand (1:1:1) as per traditional practices and design, the mortar should be prepared by grinding mill only. The thickness varies from 10mm to 100mm as per design |
| 45 | Providing and applying integral fine coat, with addition of colour pigments, as paint to the plainlime stucco plaster in 2 layers, including scaffolding, curing, all leads and lifts, etc. complete. 1) The first coat to be laid is a mixture of fine lime and white washing lime in proportion of 2:1,made smooth with wooden rubbers and very lightly beaten. 2)The finishing coat consisting of fine lime, white washing lime, mixed with the appropriate pigment in 1:2:1 proportion is to be applied and well polished with trowels. |
| 46 | Carving ornamental work including moulding, grove, chisseling & dresing the same part with fine finishing as per existing/similar type of work of on the stone surface of any type & size or as directed by engineer in charge etc. complete. The charges for chisscling & dressing on stone surface for govering at the stone surface after chisling a fine surface rate for as per market rate. |
| 47 | Caving ornamental work on surface including moulding, grove, chisseling & dresing the same part with fine finishing as per existing/similar type of work of on the stone surface of any type & size or as directed by engineer in charge etc. complete.The charges for chiseling & dressing on stone surface for ornamental carving work surface etc. as per existing design. pattern and form as directed by engineer in charge |
| 48 | Providing Soil Bag Support First Time to the monument with contractor´s soil in proper layers carefully as directed by Engineer in-charge including filling, tying and conveying the bags, removing the soil bags after work up to a distance of 50 meter beyond the monument area and cleaning the site etc. complete.For Lowering Down |
| 49 | Providing Soil Bag Support Second Time to the monument with contractor´s soil in proper layers carefully as directed by Engineer in-charge including filling, tying and conveying the bags, removing the soil bags after work up to a distance of 50 meter beyond the monument area and cleaning the site etc. complete.For Restoring |
| 50 | Providing and laying cast in situ 1:1:4 Lime Concrete of broken brick metal for coping or waterproofing as per detailed specifications and drawings or as directed including centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required, with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate or surkhi in drum mixer, the concrete must be bitten for two days with pouring water as per specifications, scaffolding, watering and all concrete work when handed over to be perfectly clean and free from all mortar stains, etc. complete. |
| 51 | Providing and fixing frame with / without ventilator of size as specified with Country cut teak wood for doors and windows including chamfering, rounding, rebating, iron holdfast of size 300mm x 40mm x 5mm with oil painting, etc. complete |
| 52 | Providing and fixing Country cut teak wood double or single leaf panelled shutters, 35 mm thick style top and freze rail 95 x 35 thick with lock and bottam rail 195 x 25 mm thick and panels without ventilator as per detailed drawing excluding the door frame, stainless steel fixtures and fastening and finishing the wood work with oil painting 3 coats complete |
| 53 | Providing and applying melamine polish of required finish to the wood work byspray machine including knotting and preparing the even surface by scraping,applying French polish , scaffolding if required etc. complete.Note:The work to be executed on prior approval of Superintending Engineer will be necessary. |
| 54 | Applying breathable, non-reactive, antifungal, and water repellant Silane/ Siloxane chemical as approved by Archaeological Survey of India/ Engineer-in- charge, of approved brand and manufacture, diluted with solvent mineral Turpentine oil in the ratio of 1:12 (One part of approved chemical :12 Part of Turpentine oil), on the existing sand stone masonry surface with two or more coats to give uniform application of chemical on the surface, all complete as per direction of Engineer-In-charge (The rate is inclusive of all materials & labours involved except scaffolding). |
| 55 | Providing and laying in situ /Ready Mix cement concrete M-20 of trap / granite/quartzite/ gneiss metal for R.C.C. work in foundations like raft, strip foundations,grillage and footings of R.C.C. columns and steel stanchions etc. including bailingout water, Steel centering formwork, laying/pumping cover blocks, compaction andcuring roughening the surface if special finish is to be provided (Excluding reinforcementand structural steel) etc. complete, with fully automatic micro processor based PLC withSCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc.complete. With fine aggregate (Crushed sand VSI Grade |
| 56 | Providing and laying Cast in situ/Ready Mix cement concrete M-20 of trap /granite /quartzite/ gneiss metal for R.C.C. columns as per detailed designs and drawing oras directed including steel centering, formwork, cover blocks, laying/pumping, compactionfinishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness togive a smooth and even surface or roughening if special finish is to be provided and curing etc. complete.(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) |
| 57 | Providing and laying Cast in situ/Ready Mix cement concrete M-15 of trap/ granite/quartzite/gneiss metal for coping to plinth or parapet, moulded or chamfered as per drawing or as directed including steel centering, plywood/ steel formwork compacting,roughening themif special finish is to be provided, finishing uneven and honey combed surface and curing etc. complete.The Cement Mortar 1:3 plaster is considered for rendering uneven and honey combed surface only.Newly laid concrete shall be covered bygunny bag,plastic, tarpaulinetc. (Wooden centering will not be allowed.) With fine aggregate (Crushed sand VSI Grade) |
| 58 | Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, complete |
| 59 | Providing and fixing mild steel grill gate with angle iron frame 65mm x 65mm x 10mm with iron bars at 150mm C/C and diagonal flats as per the detailed drawing including hinges, pivot block locking arrangement, welding riveting and oil painting of three coats of approved shade Weight of gate 35 Kilogram/Smt |
| 60 | Disposing of dismantling materials of R.C.C./ stone / brick masonry / derbies, excavated material / soil / murum / rubbish material or vegetation / grass / shrubs etc., from work site beyond the 2km. |
| 61 | Carrying of detailed topographic survey by using total station along the existing or new road including taking L-section and cross section at every 30 meter ROW ,taking at least 10 spot levels per cross section, picking up all existing details inside the Row like electric telephone line , encroachments, structures etc. connecting all the primary total station control points by G.I.S.Bench marks level or whichever available with department using auto level and preparing Auto CAD plan by using above data taking out 1 set of black and white printout on 50 micron polyster film sheet A2 size and 2 sets of coloured printout on A2 size submitting soft copy all data on CD. Plain Terrain New Alignment |
| 62 | SITC of LED Post top Lantern/ Handi type 50 w |
| 63 | Preparing and carrying out videography, Documentary & Shooting of still photographs of Extra copies - 5\\" X 7\\" Size outdoor and indoor of roads, bridges, other structures and programme, including preliminarys survey, still shots moving shooting, necessary board for video shooting hiring of vehicle, equipment for video shooting, transportation of all equipment, persons, required for shooting, lighting arrangement as may be necessary, editing, mixing, titling, lettering, sounding including cost of coloured cassette of approved quality etc. complete Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |