| 1 | Stringing of one km 3 PH 11kV line with XLPE Insulated ACSR Raccoon or equivalant (3 conductors) after fitting insulators, binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches wherever necessary excluding cut point works. |
| 2 | Fitting one set (3No.) 11kV LA and giving connections excluding earthing. |
| 3 | Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. |
| 4 | Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point. |
| 5 | Providing bridging at Cut points for 3 PH 11kV line with XLPE Insulated ACSR Raccoon or equivalent (1 conductors) using IPC and respective conductors |
| 6 | Providing midspan joint for 11kV 99sqmm AAAC covered conductor (1 conductor) |
| 7 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5 m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. |
| 8 | Renewing one V Cross arm on the 11kV Pole including dismantling and conveyance. |
| 9 | Renewal of one damaged HT Pin insulator. |
| 10 | Straightening one slanted 11kV pole after unbinding the line and binding the line after work. |
| 11 | Additional rate for refitting/redoing one Disc set while renewing any type of 11kV cut pole. |
| 12 | Doing one cable end termination on 11kV 99sqmm AAAC covered conductor (1 conductor) and connecting to existing MVT or other terminals, including charges for cable jointer etc. complete as per the direction of the departmental officers. |
| 13 | Fiting One No MVT on existing cross arm excluding termination work (for One phase) of any rating for 11 kV AB Cable |
| 14 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 15 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 16 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 17 | Dismantling of suspension clamp suitable for LT AB cable |
| 18 | Erection of suspension clamp for LT ABC of any size |
| 19 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 20 | Additional rate for reinstalling LT line on the renewed 11kV pole having both HT and LT (HT/LT) lines. |
| 21 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 22 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 23 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires. |
| 24 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 25 | Insertion of one HT PSC pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 26 | Additional rate for refitting/redoing one Shackle Set, including reshacling one span, while renewing any type of LT pole. |
| 27 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 28 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 29 | Insertion of one LT PSC pole in existing three phase OH line including digging & back filling pit in ordinary soil, fitting cross arm, insulator, binding etc. excluding transportation of poles. |
| 30 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 31 | Providing WP support with PSC pole including digging & back filling pit in ordinary soil. excluding transportation of poles. |
| 32 | Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil. |
| 33 | Providing Strut using LT PSC pole including digging and back filling pit in ordinary soil. |
| 34 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 35 | Renewal of existing damaged/broken old 11kV Stay to the existing stay rod. Please Enable Macros to View BoQ information |