|
| 1 | Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. |
| 2 | Earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm. including watering and ramming etc.layer by layer complete .(payment to be made on the basis of measurement of finished quantity of work). |
| 3 | Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant IS codes. |
| 4 | Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes. |
| 5 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction. |
| 6 | Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor). |
| 7 | 125 mm thick Brick work with 1st class bricks in cement mortar (1:4) |
| 8 | Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame excluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be corrected up to three decimals). |
| 9 | Panel shutters of door and window, as per design (each panel consisting of single plank without joint), including fitting and fixing the same in position butexcluding the cost of hinge and other fittings.In ground floor.(In case of non-supply of single plank, penal rate of reduction of 20% will bemade) |
| 10 | Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface]. |
| 11 | supplying, fitting and fixing M.S. clamps for door and window frame made of flat bent bar , end bifurcated with necessary screws etc. by cement concrete (1:2:4) as per direction . ( cost of concrete will be paid separately). |
| 12 | Iron butt hinges of approved quality fitted and fixed with steel screws, with ISI mark. |
| 13 | Galvanized corrugated iron sheet work (excluding the supporting frame work) fitted and fixed with 10 mm. dia J or L hook-bolts, limpet and bitumen washers and putty complete with 150 mm. end lap and one corrugaion minimum side lap. ( payment to be made on area of finished work). (GCI sheet to be supplied by contractor). |
| 14 | M.S. structural works in roof trusses with tubular sections conforming to IS: 806-1968 & IS: 1161- 1998 cnnected to one another with bracket, gusset cleats as per design, direction of Engineer-in-charge complete including cutting to requisite size, fabrication with necessary metal arc welding conforming to IS: 816-1969 & IS: 9595 using electrodes of approved make and brandconforming to IS:814- 2004, haulage, hoisting and erection allcomplete.The rate includes the cost of rolled steel section, consumables suchas electrodes, gas and hire charge of all tools and plants and labourreqired for the work including all incidental chages such aselectricity charges, labour insurance charges etc.Payment to be made on the basis of calculated weight of structuraltubular memebrs as specified in relevent IS code in finished work.Payment for gusset, bracket, cleat may be made by adding the actualweight of such items with weight of finished structural members. Therates are considered for a height of erection 8 m. / 2nd floor levelfrom the ground. Add 1.5 % extra over the rate for each additionalfloor or 4m. beyond the initial 8 m. or part thereof. |
| 15 | GST @ 18% |
| 16 | Cess @ 1.0% Please Enable Macros to View BoQ information |