| 1 | Earth work in excavation in foundation in hard soil withi 50mt initial lead and lift of 1.5 mt icluding all leads and lifts including rough dressing and breaking clods deposited the excavatied materials away from work site |
| 2 | Filling foundation and Plinth with sand well water rammed including cost and carriage all taxes complete |
| 3 | Cement Concrete M10 (1:3:6) using 4cm size BHGCB metal including cost conveyance royalties taxes of all materials etc complete |
| 4 | Cement Concrete (1:2:4) using 12mmm HGCB chips including all cost etc |
| 5 | RCC work of M 25 grade with 20mm and down grade black CBHG chips RCC in Sub Structure |
| 6 | Plinth Band |
| 7 | Column and Beam |
| 8 | Lintel Band |
| 9 | Chajja |
| 10 | Roof Slab |
| 11 | Supplying fitting and placing uncoated HYSD bar reinforcement complete as drawing and technical specification |
| 12 | 20mm thick cement plaster grading plaster (1:4) |
| 13 | Brick masonary in CM (1:6) in superstructure including all cost etc complete |
| 14 | Superstructure |
| 15 | Brick masonary in CM (1:4) in superstructure including all cost etc complete |
| 16 | 12mm thick cement plaster in CM (1:6) over Brick masonary including cost of all materials |
| 17 | 16mm thick cement plaster in CM (1:6) over Brick masonary including cost of all materials etc |
| 18 | 6mm thick CP with CM (1:4) over RCC surface including deep chiping and including all cost etc complete |
| 19 | Finishing wall surface of wall with Acrylicputty water based |
| 20 | Finishing wall surface of wall with wall primer |
| 21 | Wall painting two coats with plastic emulsion paint |
| 22 | Providing and fixing GI window Grill including fixing etc all comp |
| 23 | Priming one coat with any approved primer red oxide |
| 24 | Painting two coat with any approved paint on new wood and Iron work |
| 25 | Supplying fitting and fixing of two track UPVC sliding window of approved make with 6mm thick glass of approved quality complete with frame shutters and all fitting and fixtures |
| 26 | Supplying and fitting fixing of Un-plasticised poly vinyl chloride UPVC FENESTA NCL VEKA LTD Three track -Three panel sliding window-60-series duly manufactured using UPVC reinforced profiles of 108mmx45mmx2.5mm of outer frames and window sash of 39 mmx58mmx2.5mm capable of mounting single glazing system, structurally reinforced with hot dip galvanised up to 50 microns of minimum thickness of 1.5 mm prefabricated and welded through fushion welding the window frame shall be fitted with 6mm thick clear touchenced glass of SAINT -GOBAIN make duly fixed with EPDM wheathering seal resistance and the system is to be installed using Unreinforced large coupler at the site using anchoner fasteners, silicon rubber sealant , easy glazing/deglazing at site etc, including cost and conveyance of all materials, accessories , labour charges, materials and product confirming to ASTM D 638 -14, EN-477-95 and other applicable codes and standards. |
| 27 | Supplying fitting and fixing of stainless steel of 304 grade in hand railing using 50 mm dia of 2 mm thick circular pipe with Balustrade of size 32 mm x 32 mm x 2 mm etc complete. |
| 28 | Supplying fixing of Industrial Tiles in floors |
| 29 | Supplying fixing Vetrified Tiles in Floor |
| 30 | Supplying fixing Vetrified Tiles iin Dado |
| 31 | Supplying fixing Ceramic wall Tiles |
| 32 | Supplying fixing Granite Tiles 20mm thick floor |
| 33 | Cost of Bala Painting |
| 34 | Add PH Item |
| 35 | Display and unforseent item |
| 36 | Contigency Please Enable Macros to View BoQ information |