| 1 | M&L for preparation of old plastered or unplastered surfaces of walls including cornices etc by brooming down or steel wire brushing scraping down smook soot, moulds, moss and efflorescent salt, trading oil and greasy spots and applying one coat of white lime wash at any height including scaffolding etc complete all as specified and directed by Engineer-in-charge. |
| 2 | .-ditto- all as per ser item No 1 (here-in-before) but on ceiling. |
| 3 | M&L for preparation of old plastered or unplastered surfaces of walls including cornices etc by brooming down or steel wire brushing, scraping down smook soot, moulds, moss and efflorescent salt, trading oil and greasy spots and applying two coats of white lime wash at any height including scaffolding etc complete all as specified and directed by Engineer-in-charge. |
| 4 | M&L for preparation old painted surfaces of any description of wood or wood based surfaces exc 10cm width or girth and applying one coat of synthetic enamel paint of any tint etc complete all as specified and directed by Engineer-in-charge. |
| 5 | .-ditto- all as per ser item No 04 (here-in-before) but on steel surfaces. |
| 6 | M&L for preparation of old plastered surfaces of walls and applying one coat of Oil Bond Distemper (OBD) with roller finish at any height including scaffolding etc complete all as specified and directed by Engineer-in-charge. |
| 7 | .-ditto- all as per ser item No 6 (here-in-before) but on ceiling. |
| 8 | M&L for preparation of old plastered surfaces of walls and applying two coats of Oil Bound Distemper (OBD)with roller finish at any height including scaffolding etc complete all as specified and directe by Engineer-in-charge. |
| 9 | M&L for complete removal of existing treatement of walls and applying two coats of Oil Bound Distemper (OBD) over 1 mm layer of putty to make the surface even and smooth with roller finish at any height including scaffolding etc complete all as specified and directe by Engineer-in-charge. |
| 10 | M&L for preparation of old plastered or unplastered surfaces of walls including cornices etc and applying one coat of cement paint at any height including scaffolding etc complete all as specified and directed by Engineer-in-charge. |
| 11 | M&L for preparation of plastered surfaces of walls plastered, old/new surfaces, unplastered surface & applying two coats of cement paint etc complete all as specified and directed by Engineer-in-charge. |
| 12 | M&L for complete removal of existing treatement and applying two coat of luster paint over one or more coat of putty not less than 2 mm thick to get the surface even and smooth with roller finish at any height including scaffolding etc complete all as specified and directed by Engineer-in-charge. |
| 13 | M&L for complete removal of existing treatement, Washing, rubbing down and stopping of distempered and painted surfaces and applying two coats of apex utima emulsion exterior paint over a coat of akali resistant primer |
| 14 | .-ditto- all as per ser item No 13 (here-in-before) but applying one coat of apex ultima weather proof paint |
| 15 | M&L for 2 mm thick wall care putty etc complete all as specified and directed |
| 16 | M&L for rendering, 10 mm thick on brick / concrete surfaces in cement mortar 1:6 surfaces finished even and smooth without using extra cement including taking down cement mortar plaster on brick or stone walls, raking out joints, hacking for key complete all as directed |
| 17 | M&L for preparation of newly plastered surface of wall and apply two coats of OBD complete all as directed. |
| 18 | M&L for rendering, 15 mm thick on stone/brick / concrete surfaces in cement mortar 1:4 finished even and fair without using extra cement etc including taking down cement mortar plaster on brick or stone walls, raking out joints, hacking for key complete all as specified and directed by Engineer-in-Charge |
| 19 | M & L for preparation of new plastered surfaces of wall and applying two coats for cement based paint complete all as directed. |
| 20 | M&L for complete removal of exsting treatment, Washing, rubbing down and stopping of distempered and painted surfaces on plastered surfaces and applying a layer of POP finish with crack seal/wall surfaces at any height including scaffolding etc complete all as specified and directed by Engineer-in-charge |
| 21 | M&L for preparation of old decorated surfaces of wood of any description exc 10cm width/girth and applying one coat of French polishing on surfaces of any description, width or girth including cleaning and preparing the surface including a coat of wood filler on old works |
| 22 | M&L for aplying one coat of 'Tile guard' of approved shade over any type of roof surfaces including preparations at any height including scaffolding and safety measures etc complete all as specified and directed by Engineer-in-charge. Make : Asian paint or equivalent in Nerolac/ Berger |
| 23 | M&L for aplying one coat of 'Floor guard' of approved shade over any type of concrete/tile surfaces in floor/kerb stone including preparation etc complete all as specified and directed by Engineer-in-charge. Make : Asian paint or equivalent in Nerolac/ Berger |
| 24 | M&L for writing letters or figure (Block Roman, Italic or Indian) n.exc 30cm high etc complete all as specified and directed by Engineer-in-charge. |
| 25 | M&L for commas, shortlines, dashes, hyphens, brackets etc painted with thick paint so that they stand out boldly and solidly without showing signs of brush marks etc complete all as specified and directed by Engineer-in-charge. |
| 26 | Notes for painting items : The following Precautionary measures shall be ensured by the contractor during execution of work:-(i) Contractor shall deposit full quantity of materials (Proprietory Materials required) required for painting works covered under subject contract in the custody of Engineer-in-Charge / Office in Charge of unit.(ii) The materials as required shall be issued to contractor by JE / Engineer-in-Charge on daily basis and the empty containers / bags shall be deposited in the store of Engineer-in-Charge by the Contractor, for verification as per standard consumption / coverage prescribed by the manufacturers.(iii) The empty containers / bags and surplus materials if any shall be removed from the site / store once work is certified as completed by GE with prior permission of Engineer-in- Charge. (iv) While painting internally / externally contractor shall take full care of existing bldg structures of nearby area by providing tarpoline etc (v) Contractor should clean all internal / external floor / doors / windows glass panes etc which are effected by painting to the satisfaction of Engineer-in-Charge Please Enable Macros to View BoQ information |