| 1 | Demolishing reinforced cement concrete manually / by mechanical means including stacking of steel bars properly and disposal of unserviceable materialwith all lifts and upto 50 m lead etc. complete as per direction of the Engineer- in-charge. |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. - All kinds of soil |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level: 1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size) |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement -All work upto plinth level: 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stoneaggregate 20 mm nominal size) |
| 6 | Reinforced cement concrete work in walls (anythickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars,piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcemen 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) |
| 8 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D ormore |
| 9 | First class brick work in foundation and plinth including cost of all materials as required complete:- In cement mortar 1:4 ( 1 cement : 4 fine sand ). |
| 10 | 12 mm cement plaster of mix12.1.1 Cement mortar 1:4 (1 cement : 4 fine sand) in/cl neat cement punning. |
| 11 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --All work upto plinth level:1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate20 mm nominal size) |
| 12 | Centering shuttering including struttings, propping etc. and removal of form work for: Suspended floors, roofs, landings, balconies and access platform with timber planks |
| 13 | Providing structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete as required. |
| 14 | Providing and placing gunny/ polythene (of minimum wall thickness of 500 micron) bags filled with sand (of minmum qty of 0.034 cum) and properly manually stitched to avoid any leakage of sand as per specification. |
| 15 | Flat brick soling Providing and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. |
| 16 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m : All konds of soil. |
| 17 | Pumping out water caused by springs,tidal or river seepage broken water mains or drains and the like. Please Enable Macros to View BoQ information |