| 1 | Supplying and fixing Single headed hydrant valve(landing valve) with 1 No. 63 mm dia instantaneous FM Gunmetal/Stainless Steel coupling and cast iron wheel, ISI marked, conforming to IS 5290 (type A) with blank Gunmetal/Stainless Steel cap and chain as required :SS (Grade 304) |
| 2 | Providing & fixing 63 mm dia 15 m long re-inforced rubber lined(RRL) woven jacketed hose tested to bursting pressure 32 kg/sqcm including gunmetal male and female instanteneous type coupling approved by fire authority, machine would with G.I wire complete in all respects. Hose shall conform to I:S 636 type II and coupling to IS: 903-1985 with ISI certification (Two per hydrant Station) etc complete as per direction of the Engineer-in-charge. |
| 3 | Providing and fixing standard size SS branch pipe with gunmetal nozzle 16 mm dia outlet with standard male instantaneous spring lock type 63 mm dia coupling. Branch pipe and nozzle shall confirm to IS: 903-1985. etc complete as per direction of the Engineer-in-charge. |
| 4 | Providing, fixing, fixing of 100 mm Butterfly valve with fitting like Flange with nut,bolts and gasket of approved make |
| 5 | Providing, fixing, fixing of 100 mm NRV with fitting like Flange with nut,bolts and gasket of approved make |
| 6 | Servicing of fire pumps & motors with necessary cleaning, greasing, oiling, checking of base alongwith checking of electrical connections to the pump sets etc. Complete as per direction of the Engineer-in-charge. |
| 7 | Motor Driven Hydrant pump (75HP, 2955 rpm, 3 phase induction motor) |
| 8 | Motor Driven Sprinkler pump (75HP, 2955 rpm, 3 phase induction motor) |
| 9 | Motor Driven Jockey pump |
| 10 | Servicing & maintenance of Engine driven Fire Pump by changing of Engine oil in/c necessary filters cleaning, greasing, oiling, checking of base, motor along with checking of bodily electrical connections to the Pump sets etc complete as per direction of the Engineer-in-charge. |
| 11 | Checking, servicing, gland packing and minor repairing of Non Return valves, Butterfly valve, Sluice gate valves of the full system. |
| 12 | Checking ,servicing and maintenance of panel– Auto pump controller panel maintenance to ensure automatic functional of the set of pumps as per standard guideline including supply of materials/spares including new Battery towards rectification of the same |
| 13 | Supply, Installation, Testing commissioning of ISI marked carbon di-oxide (CO2) type fire extinguisher including all fixtures and accessories complete with all respect as per approved make as required |
| 14 | 2 Kg capacity |
| 15 | 3 Kg Capacity |
| 16 | 4.5 Kg Capacity |
| 17 | Supply, Installation, Testing commissioning of ISI marked ABC stored pressure type Fire Extinguisher including all fixtures and accessories complete with all respect as per approved make as required. |
| 18 | 2 kg capacity |
| 19 | 4 Kg Capacity |
| 20 | 6 Kg capacity |
| 21 | Supply, Installation, Testing commissioning of Dry Chemical Powder (DCP) Fire Extinguisher including all fixtures and accessories complete with all respect as per approved make as required. |
| 22 | 4 Kg Capacity |
| 23 | 6 Kg capacity |
| 24 | 10 Kg capacity |
| 25 | Supply, Installation, Testing commissioning of Wet chemical fire Extinguisher including all fixtures and accessories complete with all respect as per approved make as required. |
| 26 | 6 Litres capacity |
| 27 | SITC of Water type Extinguisher including all fixtures and accessories complete with all respect as per approved make as required. |
| 28 | 9 Litres capacity |
| 29 | Design, supply, installation, testing and commissioning of CO2 GAS fire Suppression System with following capacity CO2 cylinder, and required length of automatic bursting tube inside LT panel as specified i/c required modification and making good the same the LT panel as required for installation of complete system along with the complete items as per the specifications, approved make, as required as per site. |
| 30 | Preparation of fire safety plan, evacuation plan etc., submission of online application on behalf of department and necessary coordination with fire department (except fees which will be paid by owner department) towards obtaining fire N.O.C for ABV-RCC, Agartala from fire department. |
| 31 | Operation of complete fire fighting system of ABV-RCC, Agartala (24 hours x 365 Days x 3 shifts) as per the direction of the Engineer in charge. |
| 32 | Comprehensive Annual Maintenance Contract (CAMC) of complete fire fighting system installed at ABV-RCC, Agartala as per the direction of the Engineer-in-charge Please Enable Macros to View BoQ information |