| 1 | Realignment of a 40M long span of 11KV ACSR 50mm² conductor laid between the tapping point of incoming 11KV feeder No 03 of Kathi-darwaza Receiving Station and two pole structure located adjacent to the Panel Room for 11KV Switchgear Panel. |
| 2 | P/F of 9 Mtr Long Pole (ST-410 SP33) for realignment and providing sufficient clearance between the ACSR conductor and roof of the under-construction Operator/site office |
| 3 | Painting with Red Oxide |
| 4 | Painting with Aluminium Paint, Two Coats |
| 5 | Cement bottoming 1:2:4 mix as per Standards 0.5cum /pole including shuttering |
| 6 | P/F of 11 KV 50 mm2 ACSR Conductor (Rabbit), required in addition to the existing/laid conductor due to realignment of the line. |
| 7 | P/F of GI V cross-arm/ MS Channel with top Bracket including clamp etc for various installations |
| 8 | 11kV Polymeric composite Disc Insulator 12kV, min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 9 | 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lightening Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 10 | P/F of Galvanised Nuts and Bolts |
| 11 | P/F of Danger Plates with Clamps |
| 12 | Additional Works for existing two pole Structure for 11KV outgoing feeder for stage 1st Pump House consists of providing and fitting of the following items |
| 13 | 11 kV Isolator, Double Break,3-pole, 630Amp, horizontal mounting Type, with Earth Switch. |
| 14 | 11 KV Gapless Surge Arrestor,9 kV ,10 kA, LA with polymer housing, Stn. Type |
| 15 | Earthing Complete by GI Pipe 40 mm or GI Rod 20mm 3 mtr long through GI Strip (25x3) mm |
| 16 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6) mm, nut- bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
| 17 | Wedge Connectors / PG Clamps |
| 18 | Galvanised Nuts and Bolts |
| 19 | Danger Plates with Clamps |
| 20 | Additional Works for existing two pole Structure for 11KV outgoing feeder for stage 2nd Pump House consists of providing and fitting of the following items |
| 21 | Extraction of Existing 9 Mtr HT Poles. Job includes removal of ACSR Conductor and other allied fittings from the existing poles. Extraction of the poles shall be carried out by manual means as well as mechanical means by using Hydra Crane |
| 22 | Erection of extracted/ departmental Poles at desired places as per relevant standards. Job includes, digging of Pit of 1.5 M deep, fitting of Conductor (departmental) alongwith all allied fittings. |
| 23 | Earthing Complete by GI Pipe 40 mm or GI Rod 20mm 3 mtr long through GI Strip (25x3) mm |
| 24 | P/F of GI V cross-arm/ MS Channel with top Bracket including clamp etc for various installations |
| 25 | Galvanised Nuts and Bolts |
| 26 | Danger Plates with Clamps |
| 27 | Red Oxide |
| 28 | Aluminium Paint |
| 29 | Additional Works for Laying and fitting of existing 11KV HT XLPE Aluminium Cables |
| 30 | Providing and Fitting of Mid Span Straight Through Cable jointing Kit for 11kV XLPE Cable.1C, 630mm2 |
| 31 | Providing and Fitting of Heat shrinkable End Termination Cable Kit for 11kV XLPE Cable.1C, 400mm2 -630mm2 |
| 32 | Additional works for 100KVA 33/0.44KV Auxiliary Power Transformer |
| 33 | P/F of 9 Mtr Long Pole (ST-410 SP33) for installation of 33/044 kV 100 kVA HT Transformer. |
| 34 | Additional works for 1.0 MVA 11/0.44 kV Sub-Station for Stage 2nd |
| 35 | Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe(Rod) of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body, G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts, refilled with earth enhancement materials and earth Chamber made of brick masonry with RCC slab cover. |
| 36 | Re-Commissioning of 1.6 MVA 33/11 KV HT Transformer |
| 37 | Filtration of existing/ reclaimed T-oil on site at suitable temperature (inclusive of all logistics and charges for filtration plant, etc)(Process loss maximum of 5% allowed) |
| 38 | Providing of transformer oil conforming to IS 335 (Preferred make: Power oil/ Indian Oil Servo/ HPCL) |
| 39 | Providing of CRC2-26 power spray for electrical preventive maintenance contact cleaning, etc. |
| 40 | Providing and fitting of Transformer Winding Temperature Indicator (Guage) to 1.6 MVA HT Transformer. Job includes all allied jigs and fixtures. |
| 41 | Providing and fitting of Transformer Oil Temperature Indicator (Guage) to 1.6 MVA HT Transformer. Job includes all allied jigs and fixtures. Please Enable Macros to View BoQ information |