|
| 1 | [4.1]Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. [Through Rate] |
| 2 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] |
| 3 | [10.8]Providing and laying of conglomerate floor 40mm thick cement concrete topping 1:2:4 [Through Rate] |
| 4 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] |
| 5 | [17.6]Construction of Embankment with Material obtained from Borrow pits NA Construction of Embankment CBR 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications. [Through Rate] |
| 6 | [7.21.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate] |
| 7 | [11.6.1]15 mm cement plaster on the rough side of single or half brick wall of mix : 1. 1:4 (1 cement: 4 fine sand) [Through Rate] |
| 8 | [11.25.2]Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand): 2. Raised and cut pointing [Through Rate] |
| 9 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] |
| 10 | [11.93.1]Finishing walls with water proofing cement paint of required shade : 1. New work (Two or more coats applied @ 3.84 kg/10 sqm) [Through Rate] |
| 11 | [11.97.3]Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications : 3. Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 litre/10 sqm over an under coat of primer applied @ 0.80 litre/10 sqm of approved brand and manufacture [Through Rate] |
| 12 | [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate] |
| 13 | [6.29.1]Centering and shuttering including strutting, propping etc. and removal of form work for : 1. Foundations, footings, bases for columns [Through Rate] |
| 14 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] |
| 15 | [4.4.1]Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. 1. All kinds of soil [Through Rate] |
| 16 | [26.14]`Supplying and planting in prepared pits and watering, healthy , vigorous growing , permanent trees including ,application of 10 ml chlorpyriphos 20% EC, planting desired disease free, 200 cm to 220 cm height ,5 cm to 6 cm calliper size stem , full of foliage ornamental tree sapling each to be supplied in 30cm x 30cm poly bags, [Through Rate] |
| 17 | [26.3.1]Supplying at site good earth /soil-less media and/ or organic matter, preparation of top dressing mixture or pot media 0.00 0.00 0.00 1. Supplying at site of work well-decayed farm-yard manure from any available source, approved by the Engineer-in-charge including screening through sieve of I.S.designation 16 mm with 5 km lead and supply of good earth making mixture in ratio of 1:2 [Through Rate] |
| 18 | [26.7]Grassing of play grounds with doob grass including uprooting rank vegetation and weeds by digging area to a depth of 30 cm , removing all weeds and other growth with roots by forking repeatedly, ploughing and dragging with ‘swagha’ breaking of clods, removal of rubbish, dressing and supplying doob grass roots, and planting at 10 cm apart in both directions , watering weeding including supplying and spreading of farm-yard manure at the rate of 0.18 cum per 100 sqm fertilizers DAP 50 g per sqm etc and maintenance till weed free turf is formed [Through Rate] |
| 19 | [26.8]Maintenance of grassy grounds including fertilizer application of 50 g DAP and 50 g Urea, watering, weeding, top dressing with good earth and manure mixture @ 0.0125 cum, maintaining fine level, regular mowing and removal of rubbish with all lifts and leads. [Through Rate] |
| 20 | [26.13.3]Digging holes in all kinds of soil, and refilling the same, with the excavated earth, mixed with well decayed farmyard manure (cost of well decayed farm yard manure to be paid separately) 3. Hole 0.75 metre dia and 0.75 metre deep [Through Rate] |
| 21 | [26.13.4]Digging holes in all kinds of soil, and refilling the same, with the excavated earth, mixed with well decayed farmyard manure (cost of well decayed farm yard manure to be paid separately) 4. Hole 0.60 metre dia and 0.60 metre deep [Through Rate] |
| 22 | [26.15.1]Maintenance of tree including fertilization, application of insecticide, watering, weeding, training, pruning, 1. Maintenance of tree for one year for the 1st three years of age including weeding, hoeing , plant protection , watering from Deptt. source , application of 10 ml chlorpyriphos four times, 0.0289 cum FYM each,50 gm urea and 50 g DAP twice ,replacement of casualty ,disposal of debris and other activities.etc. [Through Rate]. |
| 23 | [26.18]Supply and planting of disease free healthy , vigorous growing more than 75 cm height permanent shrubs in already prepared pits, supplied in 25 cm x 20 cm poly bags , application of 10 ml chlorpyriphos 20% E.C. termiticide each and watering supplied through the tractor tanker. [Through Rate]. |
| 24 | [26.53]Watering of trees, shrubs, ground covers etc. through tractor tanker of 5000 litre capacity including cost of water with all leads and lifts and including cost of water, fuel ,filling of tanker, watering at site with all leads and lifts as per direction of officer - in-charge.(for 1 No. Tree 30 litres water per plant 27 no . irrigations per year , shrub 20 litres/ per plant 27 no irrigations per year , lawn 2.5 cm layer or 25 litre/sqm 50 no irrigations per year , ground cover / flower bed / rose bed 2.5 cm layer or 25 litre/sqm 40 no. irrigations per year , hedge for 2.5 cm layer or 25 litre/sqm 40 no. irrigations per year , Pot plant 3 litre water daily 250 irrigations per year [Through Rate] |
| 25 | [26.62]PCC tree-guard with appropriate reinforcement with MS bars of 8mm, 6mm and 4mm, having four panels of equal size and specification, consisting of overall height of 1800 mm and overall width of 620 mm including all carriage. All materials required to be as per BIS specifications. [Through Rate] |
| 26 | Prov. and fixing of G.I. barbed wire fencing complete in all respects. |
| 27 | Supply of RCC pole of CC 1:2:4 size 1.30 Mtr. high 4`x4` at bottom and 3`x3` at top complete in all respects. Please Enable Macros to View BoQ information |