| 1 | HSR Item 5.7.4-Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortarHSR Rate(Rs.) 585.00 Through Rate |
| 2 | HSR Item 4.12.1-Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soilHSR Rate(Rs.) 78.00 Through Rate |
| 3 | HSR Item 6.1.6-Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)HSR Rate(Rs.) 2442.00 Through Rate |
| 4 | HSR Item 7.21.2-Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand)HSR Rate(Rs.) 3968.00 Through Rate |
| 5 | HSR Item 7.22.2-Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 2. Cement mortar 1:6 (1 cement : 6 coarse sand)HSR Rate(Rs.) 4488.00 Through Rate |
| 6 | HSR Item 11.5.2-12 mm cement plaster of mix : 2. 1:3 (1 cement: 3 fine sand)HSR Rate(Rs.) 126.00 Through Rate |
| 7 | HSR Item 11.6.1-15 mm cement plaster on the rough side of single or half brick wall of mix : 1. 1:4 (1 cement: 4 fine sand)HSR Rate(Rs.) 138.00 Through Rate |
| 8 | HSR Item 6.30.3-Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platformHSR Rate(Rs.) 208.00 Through Rate |
| 9 | HSR Item 6.16-Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).HSR Rate(Rs.) 6113.00 Through Rate |
| 10 | HSR Item 6.33.6-Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or moreHSR Rate(Rs.) 66.00 Through Rate |
| 11 | HSR Item 9.33-Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm ( plus 0.05 %) total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length up to 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete up to any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.HSR Rate(Rs.) 504.00 Through Rate |
| 12 | HSR Item 13.30.1-Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. 1. Hot finished welded type tubesHSR Rate(Rs.) 105.00 Through Rate |
| 13 | HSR Item 13.18-Providing and fixing hard drawn steel wire fabric 75 mm X 25 mm rectangular mesh with 3.25 mm dia wire fixed on steel windows of standard rolled sections with 3 mm thick flat iron cover moulding of 12.5 mm width fixed with machine screws welded complete in all respect.HSR Rate(Rs.) 894.00 Through Rate |
| 14 | HSR Item 11.68.3-Applying priming coat: 3. With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel worksHSR Rate(Rs.) 19.00 Through Rate |
| 15 | HSR Item 11.82.1-Painting the wooden / metal surface with synthetic enamel paint of approved brand and manufacture to give an even shade : 1. Two or more coats on new workHSR Rate(Rs.) 49.00 Through Rate |
| 16 | HSR Item 11.60-Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.HSR Rate(Rs.) 59.00 Through Rate |
| 17 | HSR Item 11.95.1-Finishing walls with Acrylic Smooth exterior paint of required shade : 1. New work (Two or more coat applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)HSR Rate(Rs.) 88.00 Through Rate |
| 18 | HSR Item 10.37.1-Providing and fixing of Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) : 1. 25 mm thickHSR Rate(Rs.) 790.00 Through Rate |
| 19 | HSR Item 30.27.1-Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade: 1. One or more coats on old workHSR Rate(Rs.) 42.00 Through Rate Please Enable Macros to View BoQ information |