| 1 | Carriage of following material from store center PVVNL to site & vice-versa of work including loading & unloading at both ends maximum distance up to 100 Km. as per direction of Supervising Engineer. |
| 2 | PCC/STP Pole 8.5/11/13 Mtr Long. |
| 3 | Line material such as HT/LT Cross Arms, HT/LT pin insulator, HT/LT pin, HT/LT disc insulator with fitting, ACSR conductor, MS channel, TPMO, Fuse set, Earthing, J Hook, GI wire for guarding, MS Nuts & bolts, suspension clamp etc. |
| 4 | Erection of PCC/STP pole 8.5/11/13 mtr long after digging a pit of size 1.6 mtr deep in all type of Soil including grouting ratio (1:4:8) & back filling of the pole with proper ramming after completion of work. (as per UPPCL Respo). |
| 5 | Laying lifting stringing & proper sagging of ACSR conductors sq.mm etc. (as per UPPCL Respo). |
| 6 | Straightening the Pole after the Pole straightening of tilted pole etc. (as per UPPCL Respo). |
| 7 | Re-sagging of the Old loose conductor etc. (as per UPPCL Respo). |
| 8 | Earthing of each HT/LT line pole properly after drive of electrodes if size 20mm x 250 mm and connection the earthing point with GI wire. (as per UPPCL Respo). |
| 9 | Providing and Fixing of Dead and Clamp. (As Per Direction of Supervising Engineer). |
| 10 | Providing and Fixing of J hook (As Per Direction of Supervising Engineer). |
| 11 | Providing and Fixing of Piercing Clamp (As Per Direction of Supervising Engineer). |
| 12 | Providing and fixing of Holding Clamp (As Per Direction of Supervising Engineer). |
| 13 | Providing and fixing of F clamps (As Per Direction of Supervising Engineer). |
| 14 | Providing and Fixing of LT Insulator (As Per Direction of Supervising Engineer). |
| 15 | Providing and fixing of MS Nut & Bolts (As Per Direction of Supervising Engineer). |
| 16 | Cutting & chopping tree branches near side of line for making the clearance between line and tree. |
| 17 | Loading and unloading of Theft or damaged transformers from different sites under the division to work shop/store center, meerut and back carriage of OK transformers form work shop/store center meerut to different sites under this division at other end with proper placment of transformers in all respect. |
| 18 | 10 KVA to 100 KVA (by manually/crane) (As Per Direction of Supervising Engineer). |
| 19 | 160 KVA to 400 KVA (by manually/crane) (As Per Direction of Supervising Engineer). Please Enable Macros to View BoQ information |