| 1 | De-Centrilized Item |
| 2 | STAY CLAMP FOR SP-21 WITH NUT & BOLT |
| 3 | EARTH WIRE CLAMP FOR SP-23 WITHN/B |
| 4 | PP & CLAMP WITH N&B ST POLE SP-23 |
| 5 | HT Stay Insulator |
| 6 | IPC with aluminium bail for earthing |
| 7 | 11 KV IPC FOR COVERED TO COVERED COND. |
| 8 | 11 KV IPC FOR COVERED TO BARE CONDUCTOR |
| 9 | 11 KV MID SPAN JOINTING KIT |
| 10 | 11KV Sus.Ties/Cable Ties on Pin INSULA. |
| 11 | 11KV Composite Poly. Disc Insulator 70KN |
| 12 | DISC FITTING (B&S) TYPE 70KN 33KV AAAC |
| 13 | 11KV AAAC COVERED COND. AL-59,99 SQ.MM. |
| 14 | 11 KV TENSION CLAMP WITH BAIL & IPC |
| 15 | Labor |
| 16 | ERECTION OF EARTHING ROD |
| 17 | EXCAVATION OF PIT FOR STAY SET |
| 18 | ERECTION OF 11 KV STAY SET |
| 19 | GROUTING OF STAY SET |
| 20 | EXCAVATION OF PIT FOR POLE |
| 21 | ERECTION OF SINGLE SP-23 POLE |
| 22 | GROUTING OF POLE |
| 23 | MUFFING OF POLE |
| 24 | DISMANTLING OF 11 KV LINE(WEASEL) |
| 25 | DISMANTLING OF 11 KV LINE(RABBIT) |
| 26 | CARTAGE SP-21/23 POLE, 0-20 KM |
| 27 | CARTAGE OF PETTY MATERIAL,0-20 KM |
| 28 | HEADLOAD CARTAGE SP-21/23 POLE(1-3 KM) |
| 29 | HEADLOAD CARTAGE OF MATERIAL(1-3 KM) |
| 30 | STRAIGHTENING OF TILTED STP POLES |
| 31 | FIXING OF IPC WITH AL. BAIL FOR EARTHING |
| 32 | FIXING OF 11KV 90KN TENSION CLAMP B&IPC |
| 33 | FIXING OF 11 KV MID SPAN JOINTING KIT |
| 34 | BACK HEAD LOAD CART. OF PETTY MAT. 1-3KM |
| 35 | FIXING OF 11KV IPC FOR COVERED - COVERED |
| 36 | FIXING OF 11KV IPC COVERED TO BARE COND. |
| 37 | LAYING SPREADING,STRINGING AAAC CONDUCT. |
| 38 | 11 KV CABLE TIES FOR PIN INSULATOR |
| 39 | BACK CARRIAGE OF SCRAP MATERIAL |
| 40 | LOOPING AND CHOPPING OF TREE BRANCHES Please Enable Macros to View BoQ information |