| 1 | RCC work of M-20 grade with 20 mm and downgrade black hard granite chips including cost, conveyance, royality and all taxes of all materials with all leads, lift T&P etc. after the curing of RCC work for 28 days complete the items of work in all respect as per specification and direction of Engineer-in-charge. |
| 2 | Column SECOND FLOOR |
| 3 | Lintel SECOND FLOOR |
| 4 | Chajja SECOND FLOOR |
| 5 | Beam SECOND FLOOR |
| 6 | Roof Slab SECOND FLOOR |
| 7 | Providing & Fixing TOR Reinforcement Bar of approed making of RC work of required diameter & of approved quality including strengthening cutting, Bending, Binding, joining tying, the Grills hosting, lowering and placing in position as per the approved design and drawing with provision for fan hooks where required including the cost, conveyance of reinforcement bars of tor steel and bending wires of 18 to 20 gause, cost of all labour, loading, unloading. labour cess T&P, etc required for the work complete for the work in all heights as per specification & excluding GST as per direction of Engineer-in-charge. |
| 8 | SECOND FLOOR |
| 9 | Fly Ash Brick Masonry in cement mortar of mix (1:6) using Fly Ash bricks of size 25c.m x 11 c.m x 8 c.m in superstructure having crushing strength not less than 75 kg per square c.m. with cement and screened & washed sharp sand for mortar after immersing the bricks for 6 (Six) hours in water before use in works with all necessary projections, splays cutting, circular moulding, corbelling, chamfering, watering and curing etc. including cost, coveyance,stacking, loading, unloading, royalties , all taxes ,cost of all labour,Labour cess ,scaffolding, sundries and T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge. |
| 10 | SECOND FLOOR |
| 11 | Plastering Providing 12mm. Thick cement plaster in cement mortar or mix(1:6) in all floors at all height with cement & screened and washed sharp river sand for mortar and finished smooth to the rough surface of the brick masonary walls after racking out the joints (alongwith providing grooves wherever necessary) including watering and curing,rounding of corners etc. complete with cost,conveyance, loading, unloading, royalities and taxes of all materials,cost of all labour,T&P,sundries and scaffolding required for the work etc. as directed by the Engineer-in- charge. |
| 12 | SECOND FLOOR |
| 13 | Providing 16mm. Thick cement plaster in cement mortar or mix(1:6) in all floors at all height with cement & screened and washed sharp river sand for mortar and finished smooth to the rough surface of the brick masonary walls after racking out the joints (alongwith providing grooves wherever necessary)including watering and curing,rounding of corners etc. complete with cost,conveyance,loading, unloading,royalities and taxes of all materials,cost of all labour,T&P,sundries and scaffolding required for the work etc. as directed by the Engineer-in- charge. |
| 14 | SECOND FLOOR |
| 15 | 20 mm Thick Grading Plaster (1:4) over Roof Slab including all cost etc. complete |
| 16 | SECOND FLOOR |
| 17 | Supplying Fiting & Fixing of M.S. Door & Window including all cost etc.complete |
| 18 | SECOND FLOOR |
| 19 | Supplying Fiting & Fixing of Vetrified Tile on Floor including all cost etc.complete |
| 20 | SECOND FLOOR |
| 21 | Supplying Fiting & Fixing of Vetrified Tile on Dados including all cost etc.complete. |
| 22 | SECOND FLOOR |
| 23 | Supplying Fiting & Fixing of Industrial Vetrified Tile on Floor including all cost etc.complete |
| 24 | SECOND FLOOR |
| 25 | Supplying Fiting & Fixing of Industrial Vetrified Tile on Dados including all cost etc.complete |
| 26 | SECOND FLOOR |
| 27 | Supplying, Fitting & Fixing of 32 mm Thick Flush Door Shutter with Approved quality of 30 mm Thick BWR Block board pasted with 1 mm Thick Sunmica on Both side of approed Design and quality icluding cost of all door fittings and fixture etc. complete |
| 28 | SECOND FLOOR |
| 29 | Supplying Fiting & Fixing of Alumunium Window (Sliding Type) including all cost etc.complete |
| 30 | SECOND FLOOR |
| 31 | Supplying Fiting & Fixing of 5mm Thick Black Glass including all cost etc.complete |
| 32 | SECOND FLOOR |
| 33 | Providing Synthetic Enamal Paint (2 coat) over a coat of Pimer including all cost etc.complete |
| 34 | SECOND FLOOR |
| 35 | Providing Acrylic Wall Putty ( Water Based & Cement Based) including all cost etc.complete |
| 36 | SECOND FLOOR |
| 37 | Providing Plastic Emulsion Paint (2 Coat) over a coat of Primer including all cost etc.complete |
| 38 | SECOND FLOOR |
| 39 | Providing Weather Seal Coat (2 Coat) over a coat of Primer including all cost etc.complete |
| 40 | SECOND FLOOR Please Enable Macros to View BoQ information |