| 1 | Providingandapplying10mmthickCementplaster inCementmortar1:3(Onepart ofCement andThreepartsof Sand ),to finishing theexposedsurfacesofR.C.C. itemsofworkssuchasRoof (or) floor slabs,beams,andSunshadesetc.tocorrectplaneandlevelincludingscaffolding,hackingofsurface,chisellingtheundulated surface wherever necessary and curingetc.,allmaterialsand labour complete inall respectsincludingall lead,lift anddescent andasdirectedbytheEnineer incharge.This rate includes thecost ofprovidingCement Mortar beadings for sun shades,steps,landingslabs,elevationetc.completecomplyingwith standard specifications. Ceiling Plastering |
| 2 | Providingandapplying20mmthickCementplaster inCementmortar1:3(Onepart ofCement andThreepartsof Sand ),to finishing theexposedsurfacesofR.C.C. itemsofworkssuchasRoof (or) floor slabs,beams,andSunshadesetc.tocorrectplaneandlevelincludingscaffolding,hackingofsurface,chisellingtheundulated surface wherever necessary and curingetc.,allmaterialsand labour complete inall respectsincludingall lead,lift anddescent andasdirectedbytheEnineer incharge.This rate includes thecost ofprovidingCement Mortar beadings for sun shades,steps,landingslabs,elevationetc.completecomplyingwith standard specifications. Ceiling Plastering |
| 3 | Supplyingandapplyingof twocoatsofputtyof3mmthick over the exposed RCC surface of ceilingincluding finishing the joints smoothy with grindingmachineandthesurfaceshallbethoroughlycleanedoutofdustandscrubbing.TheSurfaceshall thenbeallowed todry for atleast 48hours. It shall thenbesandpapered (waterproof abrasivesheet) togiveasmoothandevensurface. Anyunevennessshall bemadegoodbyapplying1st coat of puttymixedwithwater on the entire surface including filling up theundulations and applying 2nd coat of putty after 6hours of 1st coat of putty and then sandpapering(waterproof abrasivesheet) thesameafter it isdryand finishing the surface smoothly, etc., completecomplyingwithstandardspecificationsandasdirectedbytheDepartmentalOfficers. [Theratesareinclusiveof hire charges for grinding machine with wheel, costut |
| 4 | BuildingLearningActivity (theme) special designartworkwith first quality emulsion paint including wallputty priming coat etc,. |
| 5 | Providing and Applying CFTRI approved twocomponent flexible polymer modified acryliccementitiouswaterproofingcoatingwithamixratioof(5Liquid :7Powder) to theRCCsurface likeRoof,bathroom, toilet, balcony & utility area [email protected]/m2 in2coats to achieve1.2mmDFT, havingElongation at break >120%as per ASTMD412,Tensile strength >1N/ mm2 as per ASTMD412,Adhesionstrength:0.80N/mm2asperASTMD4541,crackbridgingupto2mmasperASTMC836. Thefinishedcost to includesurfacepreparation,makingcovingof 50mmX50mmat all right anglesofwallJunctionwithPolymerRepairMortarand lay45gsmglass fibremeshover theangle filletwhen the firstcoat instillwet, treatmentofcrackscompletelyasperspecification, complete. |
| 6 | SupplyingandfixingPVCRainwaterdownfall pipesof following dia meter etc., complete. |
| 7 | Platform Sub Estimate |
| 8 | Magnetic Green fibre Board (SOR) |
| 9 | Provision for Name Board |
| 10 | Photo Charges Please Enable Macros to View BoQ information |