| 1 | APPENDIX A-Maintanace to West Gopuram |
| 2 | Dismantling tiled roofing with battens, boarding etc. complete including stacking ofserviceable material and disposal of unserviceable material within 50 metres lead. |
| 3 | Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres spanand 5 metres height including stacking the material within 50 metres lead:Of sectionalarea 40 square centimetres and above |
| 4 | Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres spanand 5 metres height including stacking the material within 50 metres lead:Of sectionalarea below 40 square centimeters |
| 5 | Supplying and fixing Anjily wood wrought and put up for roof members includingcost and conveyance of materials etc. complete . |
| 6 | Supplying and fixing Anjily wood reapers of size 50x25 mm with wire nails includingcost and conveyance of materials etc. complete. |
| 7 | Supplying and fixing Dept. wood reapers of size 50x25 mm with wire nails includingcost and conveyance of materials etc . complete. |
| 8 | Supplying Ist class M.P.roofing tiles of size 410 x 235 mm or nearest available sizewith single groove |
| 9 | Supplying M P hip & ridge tiles 400 mm or nearest available size |
| 10 | Roofing with departmental (old and new) first class MP tiles(size 410X235 mm ) ornearest available size |
| 11 | Roofing with departmental (old and new ) ( 400mm or nearest available size ) M.Phip & ridge first class set in CM 1:4 including finishing the edge |
| 12 | Applying priming coat:With ready mixed pink or Grey primer of approved brand andmanufacture on wood work (hard and soft wood) |
| 13 | Painting with synthetic enamel paint of approved brand and manufacture of requiredcolour to give an even shade :One or more coats on old work |
| 14 | Providing and fixing single scaffolding system on the exterior side, upto 5m heightmade with 40 mm dia M.S. tube, 1.5 m centre to centre, horizontal & verticaltubes joining with M.S. clamps and M.S. staircase system in the scaffolding forworking platform etc. and maintaining it in a serviceable condition for the requiredduration as approved and removing it there after. |
| 15 | Engaging labour for doing necessary repair and maintenance to the doors andwindows: carpenter 2nd class |
| 16 | Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (Oneor more coat applied @ 0.90 ltr/10 sqm). |
| 17 | Appendix B-Maintanace to North Gopuram |
| 18 | Dismantling tiled roofing with battens, boarding etc. complete including stacking ofserviceable material and disposal of unserviceable material within 50 metres lead. |
| 19 | Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres spanand 5 metres height including stacking the material within 50 metres lead:Of sectionalarea 40 square centimetres and above |
| 20 | Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres spanand 5 metres height including stacking the material within 50 metres lead:Of sectionalarea below 40 square centimeters |
| 21 | Supplying and fixing Anjily wood wrought and put up for roof members includingcost and conveyance of materials etc. complete . |
| 22 | Supplying and fixing Anjily wood reapers of size 50x25 mm with wire nails includingcost and conveyance of materials etc. complete. |
| 23 | Supplying and fixing Dept. wood reapers of size 50x25 mm with wire nails includingcost and conveyance of materials etc . complete. |
| 24 | Supplying Ist class M.P.roofing tiles of size 410 x 235 mm or nearest available sizewith single groove |
| 25 | Supplying M P hip & ridge tiles 400 mm or nearest available size |
| 26 | Roofing with departmental (old and new) first class MP tiles (size 410X235 mm ) ornearest available size |
| 27 | Roofing with departmental (old and new ) ( 400mm or nearest available size ) M.Phip & ridge first class set in CM 1:4 including finishing the edges |
| 28 | Applying priming coat:With ready mixed pink or Grey primer of approved brand andmanufacture on wood work (hard and soft wood) |
| 29 | Painting with synthetic enamel paint of approved brand and manufacture of requiredcolour to give an even shade :One or more coats on old work |
| 30 | Providing and fixing single scaffolding system on the exterior side, upto 5m heightmade with 40 mm dia M.S. tube, 1.5 m centre to centre, horizontal & verticaltubes joining with M.S. clamps and M.S. staircase system in the scaffolding forworking platform etc. and maintaining it in a serviceable condition for the requiredduration as approved and removing it there after. |
| 31 | Demolishing cement concrete manually / by mechanical means including disposal ofmaterial within 50 metres lead as per direction of Engineer - in-Charge.Nominalconcrete 1:4:8 or leaner mix ( including equivalent design mix) |
| 32 | Providing and laying in position cement concrete of specified grade excluding thecost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarsesand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mmnominal size derived from natural sources) |
| 33 | 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 34 | Engaging labour for doing necessary repair and maintenance to the doors andwindows: carpenter 2nd class |
| 35 | Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (Oneor more coat applied @ 0.90 ltr/10 sqm). |
| 36 | Appendix C-Maintanace to EAST Gopuram |
| 37 | Dismantling tiled roofing with battens, boarding etc. complete including stacking ofserviceable material and disposal of unserviceable material within 50 metres lead. |
| 38 | Supplying and fixing Anjily wood reapers of size 50x25 mm with wire nails includingcost and conveyance of materials etc. complete. |
| 39 | Supplying and fixing Dept. wood reapers of size 50x25 mm with wire nails includingcost and conveyance of materials etc . complete. |
| 40 | Supplying Ist class M.P.roofing tiles of size 410 x 235 mm or nearest available sizewith single groove |
| 41 | Supplying M P hip & ridge tiles 400 mm or nearest available size |
| 42 | Roofing with departmental (old and new) first class MP tiles (size 410X235 mm) ornearest available size |
| 43 | Roofing with departmental (old and new) (400mm or nearest available size) M.P hip& ridge first class set in CM 1:4 including finishing the edges |
| 44 | Painting with synthetic enamel paint of approved brand and manufacture of requiredcolour to give an even shade :One or more coats on old work |
| 45 | Providing and fixing single scaffolding system on the exterior side, upto 5m heightmade with 40 mm dia M.S. tube, 1.5 m centre to centre, horizontal & verticaltubes joining with M.S. clamps and M.S. staircase system in the scaffolding forworking platform etc. and maintaining it in a serviceable condition for the requiredduration as approved and removing it there after. |
| 46 | Engaging labour for doing necessary repair and maintenance to the doors andwindows: carpenter 2nd class |
| 47 | Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (Oneor more coat applied @ 0.90 ltr/10 sqm). |
| 48 | Appendix D-Providing net around sreekovil for preventing entry of Pigeon |
| 49 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 50 | Providing and fixing single scaffolding system (cup lock type) on the exterior side,upto 15m height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal& vertical tubes joining with cup & lock system with M.S. tubes, M.S. tubechallies, M.S. clamps and M.S. staircase system in the scaffolding for workingplatform etc. and maintaining it in a serviceable condition for the required duration asapproved and removing it there after. Please Enable Macros to View BoQ information |