| 1 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 2 | 1:3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form work for: |
| 4 | Columns, piers, abutments, pillars, posts and struts |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: |
| 6 | 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. |
| 8 | Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 9 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. |
| 10 | In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 11 | 12 mm cement plaster of mix: |
| 12 | 1:4(1 cement: 4 fine sand) |
| 13 | Painting with black anti-corrosive bitumastic paint of approved brand and manufacture to give an even shade: |
| 14 | Two or more coats on new work |
| 15 | Finishing walls with Acrylic Smooth exterior paint of required shade: |
| 16 | Old work (Two or more coat applied @ 1.67 Itr/ 10 sqm) on existing cement paint surface |
| 17 | Repair to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sqm and under, including cutting the patch in proper shape, raking out joints and preparing plastering the wall surface with white cement based polymer modified self curing mortar, including disposal of rubbish, all complete as per the direction of Engineer-In-Charge. |
| 18 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. Please Enable Macros to View BoQ information |