| 1 | Main Estimate |
| 2 | Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for corewall etc., complete. |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. |
| 4 | Brick work in cement mortar 1:5 mix using country bricks 83/4\\"x4 1/4\\"x2 3/4\\" and conveyance of all materials to site and all labour charges etc complete For 10cum |
| 5 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site |
| 6 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum. |
| 7 | Providing Steel centering & shuttering charges for RCC & plain surface cost of country wood plank including all cost & conveyance and all labour charges etc complete Above basement |
| 8 | Below Basement |
| 9 | Above Basement |
| 10 | Refilling the basement with excavated earth including all labour charges such as watering and ramming etc complete. |
| 11 | Supplying and filling of conveyed Earth by lorry in basement filling including stacking for premeasurement, conveyance loading, and unloading charges and all other incidential charges and including filling laying watering and consolidating etc., complete |
| 12 | Supplying and fixing of Steel Door size 1.20 mx2.10m including cost and conveyance of all materials to site and all labour charges etc complete. |
| 13 | Supplying and fixing window of size 1.20x1.30 including cost and conveyance of all materials to site and all labour charges etc complete. |
| 14 | Supplying and fixing of Steel Ventilators of size 0.90x0.45m including cost and conveyance of all materials to site and all labour charges etc complete. |
| 15 | Labour charges for fixing of steel door including cost and conveyance of all materials to site and all labour charges etc complete. |
| 16 | Labour charges for fixing of steel window,Ventilators including cost and conveyance of all materials to site and all labour charges etc complete. |
| 17 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete. |
| 18 | Plastering with cement mortar 1:5 mix to 12 mm thick including Cost and Conveyance of all materials to site and all labour charges etc complete for 10 sqm. |
| 19 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum. |
| 20 | Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three Sand) 20mm thick and pointed with white cement mixed with colouring pigmen |
| 21 | Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete for 10 cum |
| 22 | Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight. |
| 23 | Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete |
| 24 | Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete. |
| 25 | Painting two coats over New iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete |
| 26 | Supplying and fixing in Position best quality PVC Rain water pipe having ISI Mark and providing leak proof joints including fixing to the wall with special PVC/MS Clamps etc. |
| 27 | GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column \\"BB\\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information |