| 1 | The work of safe carriage of the following material with loading/unloading from store centre Darshan Nagar to site of work. (Approx. Distance 0 to 60 Km.) |
| 2 | Safe cartage of 8.5/9.0/11 Mtr. Long PCC Poles. |
| 3 | Safe cartage of 09/11.0 Mtr. Long ST poles. |
| 4 | ACSR Weasel Conductor |
| 5 | AB Cable (1x16+1x25) sqmm |
| 6 | AB Cable (3x50+1x35+1x16) sqmm |
| 7 | Distribution Box Three Phase/Single Phase |
| 8 | Transformer 25 KVA |
| 9 | Transformer 63 KVA |
| 10 | Transformer 100 KVA |
| 11 | 11 KV Cable Jointing Kit Outdoor 3x70 sqmm |
| 12 | 11 KV Cable Jointing Kit indoor 3x120 sqmm |
| 13 | 11 KV XLPE Cable 3x70mm2 /3x120mm2/3x185 sqmm |
| 14 | 11 KV Pilfer Proof Metring Cubical |
| 15 | Other Line material i.e. cross arm / conductor / pin insulator / stay / earthing/cable Box etc. except A.B Cable. |
| 16 | Dragging of PCC/ST Pole as per RESPO Norms. |
| 17 | Fabrication and Erection of Single Pole Support on PCC/ST Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor) |
| 18 | Fabrication and Erection of Double Pole Support on PCC/ST Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor) |
| 19 | Grouting and Binding of Stay in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms |
| 20 | Earthing of Poles as per RESPO Norms |
| 21 | Stringing, Sagging, binding and jumpering of ACSR Weasel Conductor as per RESSPO Norms |
| 22 | Stringing, Sagging, binding and jumpering of AB Cable Size (1x16+1x25)/ (3x50+1x35+1x16) as per RESSPO Norms |
| 23 | Mounting of 25 KVA Transformer as per RESSPO Norms. |
| 24 | Mounting of 63 KVA Transformer as per RESSPO Norms. |
| 25 | Mounting of 100 KVA Transformer as per RESSPO Norms. |
| 26 | Erection & Commissioning of of Single/Three Phase Distribution Box with help of clamps (Cost of clamp & Bolt & Nuts shall be borne by contactor ) as per Norms. |
| 27 | Installation and Fixing of 11 KV Cable Jointing Kit Outdoor 3x70/3x120/3x185 mm2 outdoor XLPE Cable Box. |
| 28 | Installation and Fixing of 11 KV Cable Jointing Kit Outdoor 3x120 mm2 Indoor XLPE Cable Box. |
| 29 | Laying of underground 11 KV 3x70/3x120 sq mm by trunch XLPE Cable in Normal Soil by digging of trench 1050 mm deep, 750 mm wide including supply of required material as fine sand, Ist class bricks as per norms. (All the material will be supplied by the contractor except 11 KV XLPE cable) |
| 30 | Installation of 11 KV Pilfer Proof Metering Cubical Please Enable Macros to View BoQ information |